7030 IEC 61850 User Feedback Task Force Bug Resolved Normal Is there a use case for applying more than one trgOpt on a particular DA? 10/22/2024 09:09 AM Actions
7001 IEC 61850 User Feedback Task Force Bug Resolved Normal Presence condition of DO in statistic Logical Nodes 10/22/2024 08:15 AM Actions
6622 IEC 61850 TPWG Bug Rejected Normal Test case Ttf1 (mustUnderstand) for the ICT conformance test needs clarification 12/12/2023 08:19 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
6263 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-6

GOOSE MinTime / Max Time - Probable discrepancy between Part-6 and Part-8 06/20/2023 08:44 AM Actions
6256 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-7-4

IEC 61850-7-4 list of abbreviations 06/06/2023 08:32 AM Actions
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/07/2023 08:21 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 06/05/2023 01:58 AM Actions
611 IEC 61850 User Feedback Task Force Bug 5 RTE In Progress Normal

IEC 61850-7-4 / IEC 61850-80-6

Need a new DO (ENUM) to identify the protocol used for the SCADA exchange, in LN ITCI 11/07/2023 08:29 AM Actions
7033 IEC 61850 User Feedback Task Force Feature Resolved Normal Addition of DO SPS in the LN KPMP 10/22/2024 09:23 AM Actions
7032 IEC 61850 User Feedback Task Force Feature Triage Normal

IEC 61850-7-4

Addition of a DO in XCBR indicating that the contacts have started to separate 10/22/2024 09:18 AM Actions
6767 IEC 61850 User Feedback Task Force Feature Resolved Normal Specifying virtualized physical devices and LN's 06/03/2024 03:10 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
6246 IEC 61850 User Feedback Task Force Feature Resolved Normal

IEC 61850-6

ExtRef cannot specify a Poll intended to be implemented as a GetDataSetValues request  06/05/2023 01:58 AM Actions
5374 IEC 61850 User Feedback Task Force Feature RTE In Progress Normal

IEC 61850-7-4

Creation of a new LN for protection function 02/28/2023 09:42 AM Actions
5331 IEC 61850 User Feedback Task Force Feature SCL IOP 2021 Resolved Normal

IEC 61850-6

Multiple LNodes implemented by same LN 06/05/2023 01:58 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 06/05/2023 01:58 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 Resolved Normal

IEC 61850-2

Devices types/acronyms 06/05/2023 01:58 AM Actions
5086 IEC 61850 User Feedback Task Force Feature 10 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 6/8 06/05/2023 01:58 AM Actions
5087 IEC 61850 User Feedback Task Force Feature 11 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 7/8 06/05/2023 01:58 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
5088 IEC 61850 User Feedback Task Force Feature 12 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 8/8 06/05/2023 01:58 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
621 IEC 61850 User Feedback Task Force Feature 17 RTE In Progress Normal

IEC 61850-7-4/7-500

New controllable DO in RREC to define the mode of the recloser of the circuit breaker 05/11/2021 10:08 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 06/05/2023 01:58 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/05/2023 01:58 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 05/09/2023 09:32 AM Actions
5079 IEC 61850 User Feedback Task Force Feature 3 MH Resolved Normal

IEC 61850-7-1 Ed2.1, 7-500

Clarification on the ctlModel 2/3 06/05/2023 01:58 AM Actions
5124 IEC 61850 User Feedback Task Force Feature 3 TF 61850-80-6 In Progress Normal

IEC 61850-80-6

Telemonitoring blocking 12/21/2021 09:26 AM Actions
5080 IEC 61850 User Feedback Task Force Feature 4 MH Resolved Normal

IEC 61850-7-1 Ed2.1 ,7-500

Clarification on the ctlModel 3/3 06/05/2023 01:58 AM Actions
5336 IEC 61850 User Feedback Task Force Feature 4 TF 61850-80-6 In Progress Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 11/07/2023 08:28 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
5081 IEC 61850 User Feedback Task Force Feature 5 MH Resolved Normal

IEC 61850-7-1 Ed2.1/7-4 Ed2.1 Annex B/7-500

Clarifications on the local/remote concept 1/8 06/05/2023 01:58 AM Actions
677 IEC 61850 User Feedback Task Force Feature 50 RTE In Progress Normal

IEC 61850-7-4

Impact of IEC 61869-13 (SAMU) 02/28/2023 09:42 AM Actions
6216 IEC 61850 User Feedback Task Force Feature 51 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - SetPhNum 02/28/2023 09:42 AM Actions
6217 IEC 61850 User Feedback Task Force Feature 52 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - NamAccRtg 02/28/2023 09:42 AM Actions
6218 IEC 61850 User Feedback Task Force Feature 53 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - PhyConnITF 02/28/2023 09:42 AM Actions
6219 IEC 61850 User Feedback Task Force Feature 54 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - VRtg, ARtg and HzRtg 02/28/2023 09:42 AM Actions
6221 IEC 61850 User Feedback Task Force Feature 56 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - OnOff 02/28/2023 09:42 AM Actions
6222 IEC 61850 User Feedback Task Force Feature 57 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - SetNb 02/28/2023 09:42 AM Actions
6223 IEC 61850 User Feedback Task Force Feature 58 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - StrVal 02/28/2023 09:42 AM Actions
6224 IEC 61850 User Feedback Task Force Feature 59 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - SetRef 02/28/2023 09:42 AM Actions
5082 IEC 61850 User Feedback Task Force Feature 6 MH Resolved Normal

IEC 61850-7-4,7-5

Clarifications on the local/remote concept 2/8 06/05/2023 01:58 AM Actions
6225 IEC 61850 User Feedback Task Force Feature 60 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - SetPhsOrig 02/28/2023 09:42 AM Actions
608 IEC 61850 User Feedback Task Force Feature 7 H30 In Progress Normal

IEC 61850-90-xx

Comprehensive set of requirements covering validation and supervision of all IEC 61850 communications 06/21/2022 02:09 AM Actions
5083 IEC 61850 User Feedback Task Force Feature 7 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 3/8 06/05/2023 01:58 AM Actions
5084 IEC 61850 User Feedback Task Force Feature 8 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 4/8 06/05/2023 01:58 AM Actions
5085 IEC 61850 User Feedback Task Force Feature 9 MH Resolved Normal

IEC 61850 7-1 / 7-4 Ed2.1,7-5

Clarifications on the local/remote concept 5/8 06/05/2023 01:58 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
6303 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

IEC 61850-7-500

LN PDIF – setting for nominal current 06/05/2023 01:58 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
624 IEC 61850 User Feedback Task Force Support 21 RTE Resolved Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
675 IEC 61850 User Feedback Task Force Support 48 RTE Resolved Normal

IEC 61850-7-4 Ed2.1

Clarification of blocked mode 11/21/2023 08:38 AM Actions
676 IEC 61850 User Feedback Task Force Support 49 RTE Resolved Normal

IEC 61850-7-5

Clarification of addCause 06/05/2023 01:58 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
647 IEC 61850 User Feedback Task Force Support 57 ENTSO-E Resolved Normal

IEC 61850-7-500

Single phase and multi phase trip indication for the autorecloser 05/09/2023 09:32 AM Actions
607 IEC 61850 User Feedback Task Force Support 6 H30 In Progress Normal

IEC 61850-80-6 (90-2)

LPHD.Sim management 06/21/2022 02:09 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
632 IEC 61850 User Feedback Task Force Support 8 H30 Resolved High

IEC 61850-9-2, IEC 61869-9

APPID 0x4000 - Sampled Values 12/05/2023 09:16 AM Actions
7039 IEC 61850 User Feedback Task Force Improvement New Normal Simulation bit for test systems 10/28/2024 08:15 AM Actions
6992 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-6

Add identifier to KDC 10/22/2024 09:38 AM Actions
6803 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-6

In part 6, the reference of "pure client" LN by LNodes is not clear. 09/24/2024 08:14 AM Actions
6738 IEC 61850 User Feedback Task Force Improvement Resolved Normal Amending TGSN LN class with settings for adapting the signal 04/09/2024 08:19 AM Actions
6737 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-90-29

Amending TGSN LN class with signal characteristics 04/09/2024 08:10 AM Actions
6370 IEC 61850 User Feedback Task Force Improvement Resolved Normal SBOns to be deprecated in future. 06/20/2023 09:39 AM Actions
6207 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-6

How to manage update of an IEDName or LDName for object references when valImport is false 06/05/2023 01:58 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 06/05/2023 01:58 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
5970 IEC 61850 User Feedback Task Force Improvement 2022 f2F IOP In Progress Normal

IEC 61850-6

SCT behavior needs to be specified regarding mismatch between substation section and IED section 11/08/2022 08:24 AM Actions
5335 IEC 61850 User Feedback Task Force Improvement Dustin Tessier Resolved Normal

IEC 61850-90-4

Adding Normative Requirements & Conformance Testing Pertaining to Broadcast Storms 06/05/2023 01:58 AM Actions
6248 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal

IEC 61850-6

There are controls between IEDs for automatic control functions, we need to be able to represent those controls in SCL (for configuration in SCT, data flow documentation...) 06/14/2023 08:33 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
5876 IEC 61850 User Feedback Task Force Improvement FNN Germany Resolved Normal

IEC 61850-7-4 Ed.3

Proposal of a new LN class ASWI 06/05/2023 01:58 AM Actions
5372 IEC 61850 User Feedback Task Force Improvement RTE Resolved Normal

IEC 61850-7-1

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 06/05/2023 01:58 AM Actions
5330 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-90-30

LNode iedName attribute usage needs to be clarified 06/05/2023 01:58 AM Actions
5329 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-6

Clarify iedType attribute usage in DataTypeTemplates 06/05/2023 01:58 AM Actions
6810 IEC 61850 User Feedback Task Force Improvement TC57 WG18 Resolved Normal

IEC 61850-90-3

Amending Txxx LN classes with settings for adapting the signal 09/24/2024 08:09 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 06/05/2023 01:58 AM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions