Project

General

Profile

Feature #623

New LN of group L (as "LPLE") representing a group of LED

Added by Carlos Rodriguez del Castillo almost 4 years ago. Updated almost 4 years ago.

Status:
In Progress
Priority:
Normal
Assignee:
-
Category:
Standard extension required
Start date:
11/24/2020
Due date:
05/24/2021 (over 3 years late)
% Done:

0%

Estimated time:
ID:
19
Source:
RTE
TF Unique ID:
19 # RTE
WG10 Proposal:
Estimated Completion:
Discuss in Upcoming Meeting:
No
To discuss in WG10:
No
Short Proposal:

RTE to check "LLED" proposal. It could be included in 7-4 ed3 or in the work about "physical description of IEDs"

Standard(s):
Needs More Information:
Assigned TF:

Description

Need to have a new LN of group L (as "LPLE") representing a group of LED of the IED front panel.
The LN representing the interfaces are used for the monitoring of these I/O and to map the physical terminal to the corresponding DO.
Helpful for maintenance and exploitation of the system.

#1

Updated by Carlos Rodriguez del Castillo almost 4 years ago

  • Status changed from New to Feedback
  • Start date changed from 10/07/2020 to 11/24/2020
  • Short Proposal set to RTE to check "LLED" proposal. It could be included in 7-4 ed3 or in the work about "physical description of IEDs"

During meeting 2020-11-24:
It might be included in the work about "physical description of IEDs". In annex of 7-5 there is a proposal for this and it is planned to be addressed in 7-4. That could be edition 3. "LLED" is the proposal from 7-5. Ask C.B. for the last version of 7-5. RTE to check "LLED" proposal.

#2

Updated by Carlos Rodriguez del Castillo almost 4 years ago

  • Discuss in Upcoming Meeting changed from No to Yes
#3

Updated by Carlos Rodriguez del Castillo almost 4 years ago

  • Status changed from Feedback to Triage
#4

Updated by Carlos Rodriguez del Castillo almost 4 years ago

  • Due date set to 05/24/2021
  • Status changed from Triage to In Progress
  • Discuss in Upcoming Meeting changed from Yes to No
  • To discuss in WG10 set to No

2021-03-02: RTE will send the proposal to Chen to take it into account.

Also available in: Atom PDF