Project

General

Profile

Support #551

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages

Added by Herbert Falk about 3 years ago. Updated 11 months ago.

Status:
Resolved
Priority:
Normal
Category:
Standard clarification required
Start date:
Due date:
% Done:

0%

Estimated time:
ID:
32
Source:
IOP_2017/53
TF Unique ID:
32 # IOP_2017/53
WG10 Proposal:
Estimated Completion:
Discuss in Upcoming Meeting:
No
To discuss in WG10:
Short Proposal:

To send to Hubert for next 9-3 revision

Standard(s):

IEC 61850-9-3

Needs More Information:
No
Assigned TF:

Description

To avoid errors of up to 800ns in media converters (e.g. 1 Gbit/s – 100 Mbit/s, SFPs), IEC/IEEE 61850-9-3 should specify that the Sync messages have to be padded to the same length as the Pdelay_Req and Pdelay_Resp messages. Media converters should be tested for asymmetry.
This will be stated in the revision of IEEE 1588, but IEC/IEEE 61850-9-3 refers to IEEE 1588:2008.


Proposal descriptions

Assigned to IEC 61850-9-3

#1

Updated by Vladan Cvejic about 3 years ago

  • Subject changed from To avoid errors of up to 800ns in media converters (e.g. 1 Gbit/s – 100 Mbit/s, SFPs), IEC/IEEE 61850-9-3 should specify that th to IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages
  • Category set to Standard clarification required
  • Status changed from New to In Progress
  • Standard(s) changed from 3-Sep to IEC 61850-9-3
  • Discuss in Upcoming Meeting set to No

Checking done.

#2

Updated by Carlos Rodriguez del Castillo almost 2 years ago

  • Status changed from In Progress to Resolved
  • Assignee set to Fred Steinhauser
  • Proposal descriptions updated (diff)
#3

Updated by Carlos Rodriguez del Castillo 11 months ago

  • Needs More Information set to No

Also available in: Atom PDF