open | closed | Total | |
---|---|---|---|
Assigned issues | 0 | 0 | 0 |
Reported issues | 84 | 20 | 104 |
Projects
Project | Roles | Registered on |
---|---|---|
61850-7-5 and 61850-7-500 | Manager | 02/29/2024 |
IEC 61850 User Feedback Task Force | Reporter, MANAGER_UFTF | 02/09/2021 |
Activity
05/06/2025
- 08:56 AM IEC 61850 User Feedback Task Force Feature #7202 (Triage): Include more DO in LN PSCH to send signals
- There are no enough reasons to extend PSCH with additional DO.
All mentioned signals/Data are already modeled by IEC... - 08:40 AM IEC 61850 User Feedback Task Force Improvement #7199: Addition of a DO representing the acoustic noise
- This is an input for TF 90-3. Christophe Ghafari shall submit the use-case to this TF.
- 08:32 AM IEC 61850 User Feedback Task Force Improvement #7198 (Resolved): SwgTmms description not meaningful
- This is editorial TISSUE for IEC 61850-7-4 (Christophe Ghafari will enter the TISSUE in TISSUE DB).
- 08:21 AM IEC 61850 User Feedback Task Force Improvement #7197 (Resolved): Inconsistency of DO in LN SARC
- To be discussed on the UML TF meeting (will be copied there).
FA - Fault Arc - but there is already abbreviation for... - 08:15 AM IEC 61850 User Feedback Task Force Improvement #7080: When an exchange is defined between 2 IEDs, check that they are connected on the same Subnetwork (at the AccessPoint level)
- Use-case for 90-4 discussion:
R-GOOSE engineering between two Substations (i.e. two different Subnetworks). - 08:07 AM IEC 61850 User Feedback Task Force Improvement #7095 (Closed): DO "CECtl" and "Auto" of LN CCGR share a close semantic description
- 08:07 AM IEC 61850 User Feedback Task Force Improvement #7095: DO "CECtl" and "Auto" of LN CCGR share a close semantic description
- It is recommended to follow work of 90-3 where several new LN will be introduced related to the cooling systems (powe...
04/03/2025
- 08:00 AM 61850-7-5 and 61850-7-500 IEC61850-7-5 #7178: Standardize the behavior of all four state of the 4th XCBR common position (Pos)
- Initially entered by Arun Shrestha.
- 07:59 AM 61850-7-5 and 61850-7-500 IEC61850-7-5 #7179: Describe autorecloser (RREC) states and transition for two breakers scheme
- Initially entered by Arun Shrestha.
- 07:52 AM 61850-7-5 and 61850-7-500 IEC61850-7-5 #7179 (New): Describe autorecloser (RREC) states and transition for two breakers scheme
- In North America, breaker-and-a-half, ring-bus, and double-bus double-breaker bus schemes are common for HV and EHV a...