Project

General

Profile

Support #579

Voltage protection: Overvoltage protection - 3ph operate

Added by Herbert Falk almost 4 years ago. Updated over 1 year ago.

Status:
Resolved
Priority:
Normal
Assignee:
-
Category:
Standard extension required
Start date:
02/16/2021
Due date:
08/16/2021 (over 3 years late)
% Done:

0%

Estimated time:
ID:
51
Source:
ENTSO-E
TF Unique ID:
51 # ENTSO-E
WG10 Proposal:
Estimated Completion:
Discuss in Upcoming Meeting:
No
To discuss in WG10:
No
Short Proposal:

ENTSO-E to submit additional information.

Standard(s):

IEC 61850-7-500

Needs More Information:
No
Assigned TF:

Description

Voltage protection: Overvoltage protection - 3ph operate


Proposal descriptions

To be examined in 7-500 TF.


Related issues

Copied to 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6386: Voltage protection: Overvoltage protection - 3ph operateNew02/16/202108/16/2021

Actions
#1

Updated by Vladan Cvejic almost 4 years ago

  • Category set to Standard extension required
  • Status changed from New to In Progress
  • Standard(s) set to IEC 61850-7-4, 7-5
  • Discuss in Upcoming Meeting set to No

Checking done.

#2

Updated by Vladan Cvejic almost 4 years ago

  • Status changed from In Progress to Triage
  • Short Proposal set to ENTSO-E to submit additional information.
  • To discuss in WG10 set to No

ENTSO-E to submit additional information.

#3

Updated by Vladan Cvejic almost 4 years ago

  • Due date set to 08/16/2021
  • Start date set to 02/16/2021
#4

Updated by Tom Berry almost 3 years ago

I think the requirement is to produce Op and Tr signals when there is an overvoltage on all 3 phases = an AND function.
As standard, the PTUV.Op is an OR function - at least one phase is overer-voltage

Proposal : add a setting
NumPhsStr ENG Number of phases to start detection: values 1,2,3. If the DO is not present detection starts when one phase is over the threshold voltage
See issue #580

#5

Updated by Vladan Cvejic almost 3 years ago

Opinion of the TFUF group is that this is not correct statement. Because this implies that there will be no Operation/Trip in case that there is single or two phase pickup/start.
Semantic of Op.general or Tr.general will be dealt in TF 7-500.
User is requiring that there is single attribute 3ph op/tr.

#6

Updated by Vladan Cvejic almost 3 years ago

  • Status changed from Triage to Resolved
  • Proposal descriptions updated (diff)
  • Standard(s) changed from IEC 61850-7-4, 7-5 to IEC 61850-7-4, 7-500

Tom Berry wrote in #note-4:

I think the requirement is to produce Op and Tr signals when there is an overvoltage on all 3 phases = an AND function.
As standard, the PTUV.Op is an OR function - at least one phase is overer-voltage

Proposal : add a setting
NumPhsStr ENG Number of phases to start detection: values 1,2,3. If the DO is not present detection starts when one phase is over the threshold voltage
See issue #580

#7

Updated by Carlos Rodriguez del Castillo over 1 year ago

  • Standard(s) changed from IEC 61850-7-4, 7-500 to IEC 61850-7-500
  • Needs More Information set to No
#8

Updated by Vladan Cvejic over 1 year ago

  • Copied to IEC61850-7-5 #6386: Voltage protection: Overvoltage protection - 3ph operate added

Also available in: Atom PDF