Support #579
Voltage protection: Overvoltage protection - 3ph operate
0%
ENTSO-E to submit additional information.
IEC 61850-7-500
Description
Voltage protection: Overvoltage protection - 3ph operate
Proposal descriptions
To be examined in 7-500 TF.
Related issues
Updated by Vladan Cvejic almost 4 years ago
- Category set to Standard extension required
- Status changed from New to In Progress
- Standard(s) set to IEC 61850-7-4, 7-5
- Discuss in Upcoming Meeting set to No
Checking done.
Updated by Vladan Cvejic almost 4 years ago
- Status changed from In Progress to Triage
- Short Proposal set to ENTSO-E to submit additional information.
- To discuss in WG10 set to No
ENTSO-E to submit additional information.
Updated by Vladan Cvejic almost 4 years ago
- Due date set to 08/16/2021
- Start date set to 02/16/2021
Updated by Tom Berry almost 3 years ago
I think the requirement is to produce Op and Tr signals when there is an overvoltage on all 3 phases = an AND function.
As standard, the PTUV.Op is an OR function - at least one phase is overer-voltage
Proposal : add a setting
NumPhsStr ENG Number of phases to start detection: values 1,2,3. If the DO is not present detection starts when one phase is over the threshold voltage
See issue #580
Updated by Vladan Cvejic over 2 years ago
Opinion of the TFUF group is that this is not correct statement. Because this implies that there will be no Operation/Trip in case that there is single or two phase pickup/start.
Semantic of Op.general or Tr.general will be dealt in TF 7-500.
User is requiring that there is single attribute 3ph op/tr.
Updated by Vladan Cvejic over 2 years ago
- Status changed from Triage to Resolved
- Proposal descriptions updated (diff)
- Standard(s) changed from IEC 61850-7-4, 7-5 to IEC 61850-7-4, 7-500
Tom Berry wrote in #note-4:
I think the requirement is to produce Op and Tr signals when there is an overvoltage on all 3 phases = an AND function.
As standard, the PTUV.Op is an OR function - at least one phase is overer-voltageProposal : add a setting
NumPhsStr ENG Number of phases to start detection: values 1,2,3. If the DO is not present detection starts when one phase is over the threshold voltage
See issue #580
Updated by Carlos Rodriguez del Castillo over 1 year ago
- Standard(s) changed from IEC 61850-7-4, 7-500 to IEC 61850-7-500
- Needs More Information set to No
Updated by Vladan Cvejic over 1 year ago
- Copied to IEC61850-7-5 #6386: Voltage protection: Overvoltage protection - 3ph operate added