6269 Server Issues Resolved Normal sSrv9, sSrv10: change Table 3 to Table D.1 reference 03/21/2023 07:13 AM Actions
6268 Server Issues Resolved Normal sCtl5 step 6 and step10 expected result does not apply to control objects without physical output 05/16/2023 08:24 AM Actions
6263 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-6

GOOSE MinTime / Max Time - Probable discrepancy between Part-6 and Part-8 06/20/2023 08:44 AM Actions
6256 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-7-4

IEC 61850-7-4 list of abbreviations 06/06/2023 08:32 AM Actions
6255 Server Issues Resolved Normal ED2.0 TP2.0.6 has sGos23 but PIXIT template misses the entry Gs13 while in TP1.2 ED2.1 the Gs13 has Amd1 Ed only 03/21/2023 08:27 AM Actions
6248 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal

IEC 61850-6

There are controls between IEDs for automatic control functions, we need to be able to represent those controls in SCL (for configuration in SCT, data flow documentation...) 06/14/2023 08:33 AM Actions
6246 IEC 61850 User Feedback Task Force Feature Resolved Normal

IEC 61850-6

ExtRef cannot specify a Poll intended to be implemented as a GetDataSetValues request  06/05/2023 01:58 AM Actions
6227 Server Issues Resolved Normal sDoc5 GSESettings/SMVsettings apply for SendGOOSE/SMVmessage not SetGoCBValues/SetMsvCBValues 01/24/2023 08:44 AM Actions
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
6215 Server Issues Resolved Low ED2 Amendment 1 TP1.2 Editorial - Change references to Table 54 -> Table 21 01/24/2023 08:48 AM Actions
6214 Server Issues Resolved Normal ED2 sCtl14 refer to PIXIT entry Ct16 which is a ED1 only PIXIT entry 01/24/2023 08:55 AM Actions
6213 Server Issues Resolved Normal sSvsN1 - confRev-1 not possible for backwards config 01/24/2023 08:59 AM Actions
6211 Server Issues Resolved Normal TP1.2 Certificate tempalte makes sSvP12 mandatory while it shall be optional 01/24/2023 09:00 AM Actions
6210 Server Issues Resolved Normal sSvs4 remove PIXIT entry Svs3 02/21/2023 08:09 AM Actions
6207 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-6

How to manage update of an IEDName or LDName for object references when valImport is false 06/05/2023 01:58 AM Actions
6203 Server Issues Resolved Normal sSvs6 - Test configuration does not consider available bandwidth 02/07/2023 08:19 AM Actions
6201 Server Issues Resolved Normal Merge sCnf and sMdl changes from ICT to Server 02/07/2023 08:07 AM Actions
6200 SCL Tooling Issues Resolved Normal tTf1 change Ed2/2007B to Ed2.1/2007B4 01/24/2023 08:33 AM Actions
6198 Server Issues Resolved Normal How to interpret SCL with Services element in the IED and in the AccessPoint? 01/10/2023 08:51 AM Actions
6193 Server Issues Resolved Normal sRpN5 does not test for the case where URCBs are association based (non-indexed). 02/07/2023 08:17 AM Actions
6192 Server Issues Resolved Normal Polarity of neutral in WYE 01/24/2023 08:37 AM Actions
6188 Server Issues Resolved Normal sSBOns8 does not consider PIXIT Ct13 12/13/2022 08:38 AM Actions
6172 Client Issues Resolved Normal client check bits must be tested 12/13/2022 08:34 AM Actions
6169 Server Issues Resolved Normal verify IED can subscribe to GOOSE/SV from ServerAt accesspoint 01/10/2023 08:35 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
6157 Server Issues Resolved Normal sCnf/sMdl not applicable for test equipment 11/29/2022 08:37 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 06/05/2023 01:58 AM Actions
5961 Server Issues Resolved Normal sCtl16 shall specify LocSta/MltLev to match with table B.1 12/13/2022 08:08 AM Actions
5959 Server Issues Resolved Normal sSvp3 remove random and allow synSourceID=TRUE for backwards compatible config 10/04/2022 09:01 AM Actions
5958 Server Issues Resolved Normal sTm2 allow a more accurate Time Accuracy as documented 10/04/2022 08:57 AM Actions
5957 Server Issues Resolved Normal sRp16 should not reference TISSUE 1332, it was finalized as N/A 10/04/2022 08:46 AM Actions
5956 Server Issues Resolved Normal sBr23 should not reference TISSUES 1467, 1477 which are finalized as N/A 10/04/2022 08:46 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
5954 Server Issues Resolved Normal sGop10 detail test missing 09/06/2022 08:47 AM Actions
5948 Server Issues Resolved Normal sSvp22 detail is missing in TP1.2 (editorial) 09/06/2022 08:48 AM Actions
5926 SCL Tooling Issues Resolved Normal Review ICT TP 11/29/2022 07:23 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
5917 Server Issues Resolved Urgent 'Expected result' for some test cases of CB9b: GOOSE subscribe 10/18/2022 08:59 AM Actions
5914 Server Issues Resolved Normal Verify that LPHD.Sim is not affected by LLN0.Beh 11/29/2022 08:20 AM Actions
5913 Server Issues Resolved Normal sSrvN1e and sSrvN3 change condition SCL FC=CF/DC/SP with valKind=Set 08/09/2022 08:48 AM Actions
5912 Server Issues Resolved Normal sSrv6 checking the read-only part is always applicable 10/04/2022 08:54 AM Actions
5910 Server Issues Resolved Normal Need to test that IEDs support 1 Step and 2 Step clocks: IOP 2022 10/04/2022 09:04 AM Actions
5907 Server Issues Resolved Normal sCtl26 - Cancel a direct control object 08/09/2022 08:24 AM Actions
5905 Server Issues Resolved Normal sSrvN4 is mandatory, used SetDataValues service is optional in PICS and may not be not supported 09/06/2022 09:05 AM Actions
5876 IEC 61850 User Feedback Task Force Improvement FNN Germany Resolved Normal

IEC 61850-7-4 Ed.3

Proposal of a new LN class ASWI 06/05/2023 01:58 AM Actions
5372 IEC 61850 User Feedback Task Force Improvement RTE Resolved Normal

IEC 61850-7-1

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 06/05/2023 01:58 AM Actions
5371 Server Issues Resolved Normal Scope of the test is limited to a given NSD release. 06/29/2022 02:11 AM Actions
5362 Server Issues Resolved Normal sGop2 and sGop4 check minimum MinTime and minimum MaxTime 08/09/2022 08:45 AM Actions
5356 Server Issues Resolved Normal PIXIT entries mandated by 61850-8-1 but missing in PIXIT 06/02/2022 03:02 PM Actions
5347 Server Issues Resolved Normal How should time correlated GOOSE change status in GOOSE Performance test 10/04/2022 09:11 AM Actions
5343 Server Issues Resolved Normal sGosN2 remove PIXIT Gs5 06/02/2022 03:05 PM Actions
5337 Server Issues Resolved Normal Independence of GOOSE subscriber timeouts is not tested 06/02/2022 03:06 PM Actions
5335 IEC 61850 User Feedback Task Force Improvement Dustin Tessier Resolved Normal

IEC 61850-90-4

Adding Normative Requirements & Conformance Testing Pertaining to Broadcast Storms 06/05/2023 01:58 AM Actions
5331 IEC 61850 User Feedback Task Force Feature SCL IOP 2021 Resolved Normal

IEC 61850-6

Multiple LNodes implemented by same LN 06/05/2023 01:58 AM Actions
5330 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-90-30

LNode iedName attribute usage needs to be clarified 06/05/2023 01:58 AM Actions
5329 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-6

Clarify iedType attribute usage in DataTypeTemplates 06/05/2023 01:58 AM Actions
5328 Server Issues Resolved Normal sFt2ab issues with "directory" files 06/02/2022 03:07 PM Actions
5327 Client Issues Resolved Normal PIXIT - add processing/mapping of quality bits 06/28/2022 09:44 AM Actions
5326 Server Issues Resolved Normal sSBOes8 incorrectly requires addCause=blocked-by-mode 06/14/2022 08:34 AM Actions
5120 SCL Tooling Issues Resolved Normal LGOS/LSVS reference with functional naming (SCL) 08/09/2022 08:40 AM Actions
3115 Client Issues Resolved Normal Forward compatibility to Amd1 server with pre-assigned URCB/BRCB 06/14/2022 08:35 AM Actions
748 Server Issues Resolved Normal sGos9 use SPS when INS subscribe is not supported 07/27/2021 10:07 AM Actions
658 Client Issues Resolved Normal Verify Client does process a report before RptEna write respond+ 06/01/2021 08:23 AM Actions
657 Server Issues Resolved Low Publish/subscribe enum with negative value 03/21/2023 08:09 AM Actions
656 Server Issues Resolved Low Publish/subscribe enum with value > 127 03/21/2023 08:09 AM Actions
652 Server Issues Resolved Normal Publisher can use maximum number of dataset elements 11/01/2022 09:04 AM Actions
636 Client Issues Resolved High Mandate RCB reservation for Ed2.0 client and Amd1 server 04/20/2021 02:23 PM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 06/05/2023 01:58 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 06/05/2023 01:58 AM Actions
633 IEC 61850 User Feedback Task Force Improvement 1 ZIV Resolved Normal

IEC 61850-4

Initial values of paramRev and valRev 11/21/2023 09:09 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 Resolved Normal

IEC 61850-2

Devices types/acronyms 06/05/2023 01:58 AM Actions
5086 IEC 61850 User Feedback Task Force Feature 10 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 6/8 06/05/2023 01:58 AM Actions
5087 IEC 61850 User Feedback Task Force Feature 11 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 7/8 06/05/2023 01:58 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
5088 IEC 61850 User Feedback Task Force Feature 12 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 8/8 06/05/2023 01:58 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
5089 IEC 61850 User Feedback Task Force Improvement 13 MH Resolved Normal

IEC 61850 7-3 Ed2.1

Extension of CDC ASG 06/05/2023 01:58 AM Actions
618 IEC 61850 User Feedback Task Force Improvement 14 RTE Resolved Normal

IEC 61850-90-3

Evolution of DO SumSqA of LN SPTRExt 05/09/2023 09:32 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
5322 IEC 61850 User Feedback Task Force Improvement 2 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - add optional data objects to support irregular interval schedules 06/05/2023 01:58 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/05/2023 01:58 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 06/05/2023 01:58 AM Actions
3100 IEC 61850 User Feedback Task Force Improvement 2 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 06/05/2023 01:58 AM Actions
610 IEC 61850 User Feedback Task Force Improvement 2 RTE Resolved Normal

IEC 61850-6

Mapping of another phases system description to the generic phases phsA, phsB, phsC 05/09/2023 09:32 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
624 IEC 61850 User Feedback Task Force Support 21 RTE Resolved Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 05/09/2023 09:32 AM Actions
625 IEC 61850 User Feedback Task Force Improvement 22 RTE Resolved Normal

IEC 61850-7-4

LN RADR evolution 12/05/2023 08:31 AM Actions
626 IEC 61850 User Feedback Task Force Improvement 23 RTE Resolved Normal

TR IEC 61850-90-4, IEC 61850-6

Extension of P-type to describe connexion type (PhysCon) 12/05/2023 08:52 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
5323 IEC 61850 User Feedback Task Force Improvement 3 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow updates to single values while schedules are running 06/05/2023 01:58 AM Actions
5079 IEC 61850 User Feedback Task Force Feature 3 MH Resolved Normal

IEC 61850-7-1 Ed2.1, 7-500

Clarification on the ctlModel 2/3 06/05/2023 01:58 AM Actions