# Project Tracker ID Source Status Priority Standard(s) Subject Updated
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
5089 IEC 61850 User Feedback Task Force Improvement 13 MH Resolved Normal

IEC 61850 7-3 Ed2.1

Extension of CDC ASG 06/05/2023 01:58 AM Actions
5088 IEC 61850 User Feedback Task Force Feature 12 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 8/8 06/05/2023 01:58 AM Actions
5087 IEC 61850 User Feedback Task Force Feature 11 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 7/8 06/05/2023 01:58 AM Actions
5086 IEC 61850 User Feedback Task Force Feature 10 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 6/8 06/05/2023 01:58 AM Actions
5085 IEC 61850 User Feedback Task Force Feature 9 MH Resolved Normal

IEC 61850 7-1 / 7-4 Ed2.1,7-5

Clarifications on the local/remote concept 5/8 06/05/2023 01:58 AM Actions
5084 IEC 61850 User Feedback Task Force Feature 8 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 4/8 06/05/2023 01:58 AM Actions
5083 IEC 61850 User Feedback Task Force Feature 7 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 3/8 06/05/2023 01:58 AM Actions
5082 IEC 61850 User Feedback Task Force Feature 6 MH Resolved Normal

IEC 61850-7-4,7-5

Clarifications on the local/remote concept 2/8 06/05/2023 01:58 AM Actions
5081 IEC 61850 User Feedback Task Force Feature 5 MH Resolved Normal

IEC 61850-7-1 Ed2.1/7-4 Ed2.1 Annex B/7-500

Clarifications on the local/remote concept 1/8 06/05/2023 01:58 AM Actions
5080 IEC 61850 User Feedback Task Force Feature 4 MH Resolved Normal

IEC 61850-7-1 Ed2.1 ,7-500

Clarification on the ctlModel 3/3 06/05/2023 01:58 AM Actions
5079 IEC 61850 User Feedback Task Force Feature 3 MH Resolved Normal

IEC 61850-7-1 Ed2.1, 7-500

Clarification on the ctlModel 2/3 06/05/2023 01:58 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 06/05/2023 01:58 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
6303 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

IEC 61850-7-500

LN PDIF – setting for nominal current 06/05/2023 01:58 AM Actions
5372 IEC 61850 User Feedback Task Force Improvement RTE Resolved Normal

IEC 61850-7-1

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 06/05/2023 01:58 AM Actions
676 IEC 61850 User Feedback Task Force Support 49 RTE Resolved Normal

IEC 61850-7-5

Clarification of addCause 06/05/2023 01:58 AM Actions
675 IEC 61850 User Feedback Task Force Support 48 RTE Resolved Normal

IEC 61850-7-4 Ed2.1

Clarification of blocked mode 11/21/2023 08:38 AM Actions
673 IEC 61850 User Feedback Task Force Improvement 47 RTE Resolved Normal

TR IEC 61850-7-500

CPU monitoring 11/21/2023 08:40 AM Actions
672 IEC 61850 User Feedback Task Force Improvement 46 RTE Resolved Normal

TR IEC 61850-7-500

Create DO indicating the source of synchronisation 11/21/2023 08:49 AM Actions
630 IEC 61850 User Feedback Task Force Improvement 43 RTE Resolved Normal

IEC 61850-7-500

XCBR LN new DO to describe withdrawable circuit breaker 05/09/2023 09:32 AM Actions
629 IEC 61850 User Feedback Task Force Improvement 35 RTE Resolved Normal

IEC TR 61850-90-29

TCTR and TVTR new DO to identify physical terminal allocation in the IED 01/16/2024 08:11 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 05/09/2023 09:32 AM Actions
626 IEC 61850 User Feedback Task Force Improvement 23 RTE Resolved Normal

TR IEC 61850-90-4, IEC 61850-6

Extension of P-type to describe connexion type (PhysCon) 12/05/2023 08:52 AM Actions
625 IEC 61850 User Feedback Task Force Improvement 22 RTE Resolved Normal

IEC 61850-7-4

LN RADR evolution 12/05/2023 08:31 AM Actions
624 IEC 61850 User Feedback Task Force Support 21 RTE Resolved Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 05/09/2023 09:32 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
618 IEC 61850 User Feedback Task Force Improvement 14 RTE Resolved Normal

IEC 61850-90-3

Evolution of DO SumSqA of LN SPTRExt 05/09/2023 09:32 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
610 IEC 61850 User Feedback Task Force Improvement 2 RTE Resolved Normal

IEC 61850-6

Mapping of another phases system description to the generic phases phsA, phsB, phsC 05/09/2023 09:32 AM Actions
5331 IEC 61850 User Feedback Task Force Feature SCL IOP 2021 Resolved Normal

IEC 61850-6

Multiple LNodes implemented by same LN 06/05/2023 01:58 AM Actions
5330 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-90-30

LNode iedName attribute usage needs to be clarified 06/05/2023 01:58 AM Actions
5329 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-6

Clarify iedType attribute usage in DataTypeTemplates 06/05/2023 01:58 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/05/2023 01:58 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 06/05/2023 01:58 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 06/05/2023 01:58 AM Actions
3100 IEC 61850 User Feedback Task Force Improvement 2 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 06/05/2023 01:58 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 06/05/2023 01:58 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
667 IEC 61850 User Feedback Task Force Improvement 4 WG10 Resolved Normal

IEC 61850-7-4

Report of current active setting group 06/05/2023 01:58 AM Actions
5323 IEC 61850 User Feedback Task Force Improvement 3 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow updates to single values while schedules are running 06/05/2023 01:58 AM Actions
5322 IEC 61850 User Feedback Task Force Improvement 2 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - add optional data objects to support irregular interval schedules 06/05/2023 01:58 AM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions
633 IEC 61850 User Feedback Task Force Improvement 1 ZIV Resolved Normal

IEC 61850-4

Initial values of paramRev and valRev 11/21/2023 09:09 AM Actions
6787 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Harmonization of Table 4 with Figure 22 06/13/2024 08:44 AM Actions
6500 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Parameters to enforce the checking of interlocking and synchronism 10/05/2023 08:57 AM Actions
6499 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Explanation text on the application of check conditions 10/05/2023 08:57 AM Actions
6482 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Figures 36, 37, 38 09/14/2023 07:56 AM Actions
6394 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 8/8 09/14/2023 08:04 AM Actions
6393 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 7/8 10/05/2023 08:55 AM Actions
6392 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 6/8 10/05/2023 08:55 AM Actions
6391 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 5/8 10/05/2023 08:55 AM Actions
6390 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 4/8 10/05/2023 08:55 AM Actions
6389 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 3/8 10/05/2023 08:55 AM Actions
6388 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 2/8 10/05/2023 08:55 AM Actions
6378 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 1/8 10/05/2023 08:56 AM Actions
6375 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal XCBR LN new DO to describe withdrawable circuit breaker 08/24/2023 07:57 AM Actions
6875 Client Issues In Progress Normal Update Client certificate template following the server certificate template 09/03/2024 08:11 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
6617 SCL Tooling Issues In Progress Normal tIieN1 - can a popup warning be considered as 'not allowed' 09/03/2024 08:40 AM Actions
6896 Server Issues In Progress Normal sSrv17 09/03/2024 08:18 AM Actions
6886 Server Issues In Progress Normal Tissue 1897 Data-change and data-update inclusion bitstring bits set in a report 09/03/2024 08:16 AM Actions
6871 WG13 Issues CIM Issues In Progress Normal

IEC 61970-456, IEC 61970-450

Review the existing TP and SV profiles to determine a more logical split 09/18/2024 05:10 PM Actions
6809 WG13 Issues CIM Issues In Progress Normal

IEC 61970-301

Migrate approved Ext* Protection Equipment and Network Code extensions into normative CIM 09/19/2024 01:57 PM Actions
6773 WG13 Issues CIM Issues In Progress Normal

IEC61970-301, IEC61970-452

DC device containment rules need to be updated 09/19/2024 04:24 PM Actions
6680 WG13 Issues CIM Issues In Progress High

61970-456

Support time series/schedule for SSH 09/19/2024 02:13 PM Actions
6663 WG13 Issues CIM Issues In Progress High

IEC 61970-456

The SSH profile needs to be revisited and updated for consistency. 09/19/2024 09:54 AM Actions
6347 WG13 Issues CIM Issues In Progress Normal [GMDM #15] Add a limited amount of ‘structure’ modeling to distribution grid models 09/19/2024 10:15 AM Actions
6346 WG13 Issues CIM Issues In Progress Normal

61970-301,, 61968-13

[GMDM #14] Indicating starting point for feeder tracing 09/18/2024 04:33 PM Actions
6343 WG13 Issues CIM Issues In Progress Normal

61970-301, 61970-452, 61968-13

[GMDM #7] Convention for use of xxxPhase classes 09/18/2024 04:38 PM Actions
6341 WG13 Issues CIM Issues In Progress Normal

61970-301, 61970-452

[GMDM #4] Support for transformer type designation / determination 09/18/2024 08:56 AM Actions
6299 WG13 Issues CIM Issues In Progress Normal OperationalLimitType; add an attribute to hold the "type" of limit, such as Emergency, Normal, ... 09/18/2024 12:05 PM Actions
6147 WG13 Issues CIM Issues In Progress Normal [GMDM #1] Streamlining of tank-based transformer modelling 09/18/2024 09:26 AM Actions
5947 WG13 Issues CIM Issues In Progress Normal

61970-456

Description classes inheriting from IdentifiedObject 09/19/2024 11:04 AM Actions
5894 WG13 Issues CIM Issues In Progress Normal

61968-13

CDPSM conflicting roles OperationalLimitType.OperationalLimit and OperationalLimit.OperationalLimitType 09/18/2024 11:05 AM Actions
5886 WG13 Issues CIM Issues In Progress Normal

61968-13

CDPSM missing TransformerTank and TransformerTankEnd 09/18/2024 08:26 AM Actions
5868 WG13 Issues CIM Issues In Progress Normal New BusSegment for busbar modeling 09/19/2024 03:01 PM Actions
5375 WG13 Issues CIM Issues In Progress Urgent Clean up transformer documentation - Margaret removed paragraphs from Part-11 and see where they fit [GMDM #5] (align xf descriptions in 61870-301, -457 and 61968-11, -13) 09/18/2024 10:23 AM Actions
5309 WG13 Issues CIM Issues In Progress High Support on FACTS device modeling 09/19/2024 02:29 PM Actions
5097 WG13 Issues CIM Issues In Progress Normal

61970-301, 61970-452

Allow OperationalLimitSet to be described by a Season by adding a new association between OperationalLimitSet and Season 09/18/2024 12:00 PM Actions
5076 WG13 Issues CIM Issues In Progress High

61970-301, 61970-452, 61970-456

Convention and usage of operational limits of GeneratingUnit and injections 09/18/2024 11:47 AM Actions
5016 WG13 Issues CIM Issues In Progress Normal OperationalLimit for BranchGroupNeed a means to apply the 09/19/2024 01:42 PM Actions
5015 WG13 Issues CIM Issues In Progress Normal

61970-501

Create validation constaints for the UML model and profile 09/22/2022 03:11 PM Actions
5250 WG14 Part 11 Issues CIM Issues In Progress High Document identification 10/17/2023 03:04 AM Actions
5248 WG14 Part 6 Issues CIM Issues In Progress High

61968-6

Contract work 11/09/2023 11:44 AM Actions
5803 WG16 Issues CIM Issues In Progress Normal Add meterReadingPeriodicity attribute (String) in the MarketEvaluationPoint class 09/15/2022 04:01 PM Actions
5970 IEC 61850 User Feedback Task Force Improvement 2022 f2F IOP In Progress Normal

IEC 61850-6

SCT behavior needs to be specified regarding mismatch between substation section and IED section 11/08/2022 08:24 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/07/2023 08:21 AM Actions
608 IEC 61850 User Feedback Task Force Feature 7 H30 In Progress Normal

IEC 61850-90-xx

Comprehensive set of requirements covering validation and supervision of all IEC 61850 communications 06/21/2022 02:09 AM Actions
607 IEC 61850 User Feedback Task Force Support 6 H30 In Progress Normal

IEC 61850-80-6 (90-2)

LPHD.Sim management 06/21/2022 02:09 AM Actions
605 IEC 61850 User Feedback Task Force Improvement 4 H30 In Progress Normal

IEC 61850-10-3

Test and Simulation mode questions 06/21/2022 02:09 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
6726 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/29/2024 09:07 AM Actions
6725 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 02/29/2024 09:07 AM Actions
(1801-1900/2189) Per page: 25, 50, 100