Project

General

Profile

CIM Issues #5868

New BusSegment for busbar modeling

Added by Yang Feng over 2 years ago. Updated 3 months ago.

Status:
In Progress
Priority:
Normal
Author/Contact Info:
Chuck DuBose
Base Release:
Solution to be Applied To:
Solution Version:
Solution Applied By:
Completion Date:
CIM Keywords:
61970-Wires
Breaking Change:
Yes
Breaking Change Description:
Introducing BusSegment class may break the backward compatibility and introduces alternate ways of modeling a busbar
CIM Impacted Groups:
WG13
Requestor:
Standard(s):
Version:
Clause:
Sub-Clause:
Paragraph:
Table:
Originally Closed in Version:
Origination Date:
06/08/2022
Origination ID:
Originally Assigned To:

Description

The current BusBarSection class is a single terminal ConductingEquipment that represents where the physical busbar is in the substation.
In a recent use case presented from SaskPower (by Chuck and jointly with Judy), the busbar construction could be phased and different materials might be used among phases.
This will lead to a single busbar with multiple ratings (flow & voltage) and in a practical power-flow study, they would be modeled as multiple buses in order to report violations properly.


Files

Bus Segment Use Case.pdf View Bus Segment Use Case.pdf 910 KB Yang Feng, 06/26/2022 10:02 PM

Proposed Solution

Chuck has presented a proposal on BusSegment as a two-terminal ConductingEquipment to 'separate' the single busbar into multiple pieces.
Details can be found as attached.


Decision

19-Sep-2024 Joint TF Hybrid Meetings - Minneapolis:
Reviewed. The following is needed:

- AI: Add required information to the 301 template.
- AI: Ensure it is in the 452 template.
- AI: Have agreed to take the normalRetained (in the -452) and retained (in the -456) approach to Switch and BusSegment


Related issues

Precedes WG13 Issues - CIM Issues #5870: BusSegment - ProfilesClosedActions
Precedes WG13 Issues - CIM Issues #5869: BusSegment - UML updatesClosedActions
#2

Updated by Yang Feng over 2 years ago

#3

Updated by Yang Feng over 2 years ago

#4

Updated by Chavdar Ivanov about 1 year ago

Note that issues 5870 and 5869 were closed and BusSegment was added to the model. The rest of the items will need to be decided in this issue

#5

Updated by Chavdar Ivanov 4 months ago

  • Status changed from New to Open
#6

Updated by Todd Viegut 3 months ago

  • Status changed from Open to In Progress
  • Decision updated (diff)

Also available in: Atom PDF