6178 WG13 Issues CIM Issues New Low Relation between ResourcePerformanceEvaluation and ResourcePerformanceGlobalFactor contains a typo at the source side (role) of the association. 11/11/2022 08:12 AM Actions
5973 WG13 Issues CIM Issues New Low CIM-61850 Harmonization - consider Measurement classes with multiple values (vector, Wye ...) 09/21/2022 03:36 AM Actions
5971 WG13 Issues CIM Issues New Low CIM-61850 Harmonization - Consider modelling fans, pump motors and battery systems as types of auxiliary equipment 09/21/2022 04:01 AM Actions
5313 WG13 Issues CIM Issues New Low Better description for governorSCD 02/16/2023 06:10 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
6420 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop In Progress Urgent

IEC 61850-6, IEC 61850-7-x, IEC 61850-8-1, IEC 61850-9-2

Validation of SCL Files Using Object Constraint Language (OCL) 10/26/2023 02:57 AM Actions
6414 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop In Progress Urgent Golden Single Line Diagram For All SCL/GCL/HCL Examples 10/26/2023 02:58 AM Actions
6711 61850-7-5 and 61850-7-500 IEC61850-7-5 WG10 Fall workshop In Progress Low SCL Modelling of Fault Measurements (RFMX) 02/29/2024 08:33 AM Actions
5336 IEC 61850 User Feedback Task Force Feature 4 TF 61850-80-6 In Progress Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 11/07/2023 08:28 AM Actions
5124 IEC 61850 User Feedback Task Force Feature 3 TF 61850-80-6 In Progress Normal

IEC 61850-80-6

Telemonitoring blocking 12/21/2021 09:26 AM Actions
6726 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/29/2024 09:07 AM Actions
6725 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 02/29/2024 09:07 AM Actions
6225 IEC 61850 User Feedback Task Force Feature 60 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - SetPhsOrig 02/28/2023 09:42 AM Actions
6224 IEC 61850 User Feedback Task Force Feature 59 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - SetRef 02/28/2023 09:42 AM Actions
6223 IEC 61850 User Feedback Task Force Feature 58 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - StrVal 02/28/2023 09:42 AM Actions
6222 IEC 61850 User Feedback Task Force Feature 57 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - SetNb 02/28/2023 09:42 AM Actions
6221 IEC 61850 User Feedback Task Force Feature 56 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - OnOff 02/28/2023 09:42 AM Actions
6219 IEC 61850 User Feedback Task Force Feature 54 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - VRtg, ARtg and HzRtg 02/28/2023 09:42 AM Actions
6218 IEC 61850 User Feedback Task Force Feature 53 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - PhyConnITF 02/28/2023 09:42 AM Actions
6217 IEC 61850 User Feedback Task Force Feature 52 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - NamAccRtg 02/28/2023 09:42 AM Actions
6216 IEC 61850 User Feedback Task Force Feature 51 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - SetPhNum 02/28/2023 09:42 AM Actions
5374 IEC 61850 User Feedback Task Force Feature RTE In Progress Normal

IEC 61850-7-4

Creation of a new LN for protection function 02/28/2023 09:42 AM Actions
677 IEC 61850 User Feedback Task Force Feature 50 RTE In Progress Normal

IEC 61850-7-4

Impact of IEC 61869-13 (SAMU) 02/28/2023 09:42 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
621 IEC 61850 User Feedback Task Force Feature 17 RTE In Progress Normal

IEC 61850-7-4/7-500

New controllable DO in RREC to define the mode of the recloser of the circuit breaker 05/11/2021 10:08 AM Actions
611 IEC 61850 User Feedback Task Force Bug 5 RTE In Progress Normal

IEC 61850-7-4 / IEC 61850-80-6

Need a new DO (ENUM) to identify the protocol used for the SCADA exchange, in LN ITCI 11/07/2023 08:29 AM Actions
608 IEC 61850 User Feedback Task Force Feature 7 H30 In Progress Normal

IEC 61850-90-xx

Comprehensive set of requirements covering validation and supervision of all IEC 61850 communications 06/21/2022 02:09 AM Actions
607 IEC 61850 User Feedback Task Force Support 6 H30 In Progress Normal

IEC 61850-80-6 (90-2)

LPHD.Sim management 06/21/2022 02:09 AM Actions
605 IEC 61850 User Feedback Task Force Improvement 4 H30 In Progress Normal

IEC 61850-10-3

Test and Simulation mode questions 06/21/2022 02:09 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/07/2023 08:21 AM Actions
5970 IEC 61850 User Feedback Task Force Improvement 2022 f2F IOP In Progress Normal

IEC 61850-6

SCT behavior needs to be specified regarding mismatch between substation section and IED section 11/08/2022 08:24 AM Actions
5375 WG13 Issues CIM Issues In Progress Urgent Clean up transformer documentation - Margaret removed paragraphs from Part-11 and see where they fit [GMDM #5] (align xf descriptions in 61870-301, -457 and 61968-11, -13) 06/14/2023 09:49 AM Actions
5309 WG13 Issues CIM Issues In Progress High Support on FACTS device modeling 02/14/2023 06:12 PM Actions
5250 WG14 Part 11 Issues CIM Issues In Progress High Document identification 10/17/2023 03:04 AM Actions
5248 WG14 Part 6 Issues CIM Issues In Progress High

61968-6

Contract work 11/09/2023 11:44 AM Actions
5076 WG13 Issues CIM Issues In Progress High

61970-301, 61970-452, 61970-456

Convention and usage of operational limits of GeneratingUnit and injections 10/18/2023 11:03 AM Actions
5005 WG13 Issues CIM Issues In Progress High

61970-301

GroundDisconnector examplesThe intended use of GroundDisco 04/12/2023 11:17 AM Actions
4943 WG13 Issues CIM Issues In Progress High ControlAreaGenratingUnit2: IOP suggest to clarify the usage 10/11/2023 11:14 AM Actions
4922 WG13 Issues CIM Issues In Progress High Temperature dependent and most restrictive operational limit 06/14/2023 09:50 AM Actions
6777 Client Issues In Progress Normal SCD import and Tool Functionality test procedures 04/30/2024 08:13 AM Actions
6776 Client Issues In Progress Normal cSBOns4 requires different control value 04/30/2024 08:11 AM Actions
6769 Server Issues In Progress Normal sGop9 should allow NdsCom to be set in the GOOSE message 04/30/2024 08:09 AM Actions
6766 WG16 Issues CIM Issues In Progress Normal ResourceCertification attribute type is generic and could be renamed to a more describe attribute name 04/18/2024 10:37 AM Actions
6765 WG16 Issues CIM Issues In Progress Normal ResourceCertification.type - update the description to describe the usage of the attribute "type" 04/18/2024 10:25 AM Actions
6764 WG16 Issues CIM Issues In Progress Normal ResourceCertification.qualificationFlag description is incorrect 04/18/2024 10:40 AM Actions
6753 Server Issues In Progress Normal sGos20, sGos21 force DUT as Subscriber to ignore future edition dataset elements, while 61850-7-1 expects achievable forward compatibility 04/30/2024 08:26 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
6728 Client Issues In Progress Normal cSg13 refers to PIXIT entry Sg5/Sg6 but not clarified in the expected result 04/30/2024 08:20 AM Actions
6724 Client Issues In Progress Normal GOOSE Subscriber sGos12 test expects DUT to _send_ a GOOSE message 04/30/2024 08:17 AM Actions
6723 Server Issues In Progress Normal GOOSE destination MAC address according Amd1: PIXIT Gs1 mismatches enhancement of sGos5 05/02/2024 10:01 AM Actions
6722 Server Issues In Progress Normal sGop10 PIXIT reference needed ? 05/02/2024 09:41 AM Actions
6685 GOOSE Performance Issues In Progress Normal Device need to be certified for Ed2.1 server first 04/30/2024 08:14 AM Actions
6500 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Parameters to enforce the checking of interlocking and synchronism 10/05/2023 08:57 AM Actions
6499 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Explanation text on the application of check conditions 10/05/2023 08:57 AM Actions
6482 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Figures 36, 37, 38 09/14/2023 07:56 AM Actions
6452 WG13 Issues CIM Issues In Progress Normal

61970-301,61970-452

Allow multiple RatioTapChanger on one TransformerEnd 03/12/2024 02:26 AM Actions
6451 WG13 Issues CIM Issues In Progress Normal

61970-452

Cardinality inconsistency for PowerElectronicsConnection<->PowerElectronicsUnit between canonical model and profile 02/14/2024 11:28 AM Actions
6394 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 8/8 09/14/2023 08:04 AM Actions
6393 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 7/8 10/05/2023 08:55 AM Actions
6392 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 6/8 10/05/2023 08:55 AM Actions
6391 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 5/8 10/05/2023 08:55 AM Actions
6390 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 4/8 10/05/2023 08:55 AM Actions
6389 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 3/8 10/05/2023 08:55 AM Actions
6388 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 2/8 10/05/2023 08:55 AM Actions
6378 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 1/8 10/05/2023 08:56 AM Actions
6375 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal XCBR LN new DO to describe withdrawable circuit breaker 08/24/2023 07:57 AM Actions
6347 WG13 Issues CIM Issues In Progress Normal [GMDM #15] Add a limited amount of ‘structure’ modeling to distribution grid models 06/14/2023 09:47 AM Actions
5952 WG13 Issues CIM Issues In Progress Normal

61968-11

Clarification of how midnight is expressed in time-related CIM Compound classes 09/22/2022 02:21 PM Actions
5947 WG13 Issues CIM Issues In Progress Normal

61970-456

Description classes inherithing from IdentifiedObject 09/19/2022 02:50 PM Actions
5803 WG16 Issues CIM Issues In Progress Normal Add meterReadingPeriodicity attribute (String) in the MarketEvaluationPoint class 09/15/2022 04:01 PM Actions
5302 CIM Joint Issues CIM Issues In Progress Normal

61968-11, 61968-4, 61970-301, 61968-13

Explicit association between TransformerTank and TransformerTankInfo 05/24/2023 08:58 AM Actions
5063 WG13 Issues CIM Issues In Progress Normal

61970-301, 61970-452, 61970-456

There are a variety of issues with RegulatingControl. Thes 10/08/2023 12:42 AM Actions
5015 WG13 Issues CIM Issues In Progress Normal

61970-501

Create validation constaints for the UML model and profile 09/22/2022 03:11 PM Actions
4939 WG13 Issues CIM Issues In Progress Low Is schedules needed for HVDCThe use cases for HVDC schedul 07/12/2023 11:00 AM Actions
633 IEC 61850 User Feedback Task Force Improvement 1 ZIV Resolved Normal

IEC 61850-4

Initial values of paramRev and valRev 11/21/2023 09:09 AM Actions
5323 IEC 61850 User Feedback Task Force Improvement 3 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow updates to single values while schedules are running 06/05/2023 01:58 AM Actions
5322 IEC 61850 User Feedback Task Force Improvement 2 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - add optional data objects to support irregular interval schedules 06/05/2023 01:58 AM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions
667 IEC 61850 User Feedback Task Force Improvement 4 WG10 Resolved Normal

IEC 61850-7-4

Report of current active setting group 06/05/2023 01:58 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 06/05/2023 01:58 AM Actions
3100 IEC 61850 User Feedback Task Force Improvement 2 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 06/05/2023 01:58 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 06/05/2023 01:58 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/05/2023 01:58 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 06/05/2023 01:58 AM Actions
5331 IEC 61850 User Feedback Task Force Feature SCL IOP 2021 Resolved Normal

IEC 61850-6

Multiple LNodes implemented by same LN 06/05/2023 01:58 AM Actions
5330 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-90-30

LNode iedName attribute usage needs to be clarified 06/05/2023 01:58 AM Actions
5329 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-6

Clarify iedType attribute usage in DataTypeTemplates 06/05/2023 01:58 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
6303 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

IEC 61850-7-500

LN PDIF – setting for nominal current 06/05/2023 01:58 AM Actions
5372 IEC 61850 User Feedback Task Force Improvement RTE Resolved Normal

IEC 61850-7-1

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 06/05/2023 01:58 AM Actions
676 IEC 61850 User Feedback Task Force Support 49 RTE Resolved Normal

IEC 61850-7-5

Clarification of addCause 06/05/2023 01:58 AM Actions
675 IEC 61850 User Feedback Task Force Support 48 RTE Resolved Normal

IEC 61850-7-4 Ed2.1

Clarification of blocked mode 11/21/2023 08:38 AM Actions
673 IEC 61850 User Feedback Task Force Improvement 47 RTE Resolved Normal

TR IEC 61850-7-500

CPU monitoring 11/21/2023 08:40 AM Actions
672 IEC 61850 User Feedback Task Force Improvement 46 RTE Resolved Normal

TR IEC 61850-7-500

Create DO indicating the source of synchronisation 11/21/2023 08:49 AM Actions
630 IEC 61850 User Feedback Task Force Improvement 43 RTE Resolved Normal

IEC 61850-7-500

XCBR LN new DO to describe withdrawable circuit breaker 05/09/2023 09:32 AM Actions
629 IEC 61850 User Feedback Task Force Improvement 35 RTE Resolved Normal

IEC TR 61850-90-29

TCTR and TVTR new DO to identify physical terminal allocation in the IED 01/16/2024 08:11 AM Actions