6375 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal XCBR LN new DO to describe withdrawable circuit breaker 08/24/2023 07:57 AM Actions
6347 WG13 Issues CIM Issues In Progress Normal [GMDM #15] Add a limited amount of ‘structure’ modeling to distribution grid models 09/19/2024 10:15 AM Actions
6299 WG13 Issues CIM Issues In Progress Normal OperationalLimitType; add an attribute to hold the "type" of limit, such as Emergency, Normal, ... 09/18/2024 12:05 PM Actions
6147 WG13 Issues CIM Issues In Progress Normal [GMDM #1] Streamlining of tank-based transformer modelling 09/18/2024 09:26 AM Actions
5868 WG13 Issues CIM Issues In Progress Normal New BusSegment for busbar modeling 09/19/2024 03:01 PM Actions
5803 WG16 Issues CIM Issues In Progress Normal Add meterReadingPeriodicity attribute (String) in the MarketEvaluationPoint class 09/15/2022 04:01 PM Actions
5016 WG13 Issues CIM Issues In Progress Normal OperationalLimit for BranchGroupNeed a means to apply the 09/19/2024 01:42 PM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
5894 WG13 Issues CIM Issues In Progress Normal

61968-13

CDPSM conflicting roles OperationalLimitType.OperationalLimit and OperationalLimit.OperationalLimitType 09/18/2024 11:05 AM Actions
5886 WG13 Issues CIM Issues In Progress Normal

61968-13

CDPSM missing TransformerTank and TransformerTankEnd 09/18/2024 08:26 AM Actions
6341 WG13 Issues CIM Issues In Progress Normal

61970-301, 61970-452

[GMDM #4] Support for transformer type designation / determination 09/18/2024 08:56 AM Actions
5097 WG13 Issues CIM Issues In Progress Normal

61970-301, 61970-452

Allow OperationalLimitSet to be described by a Season by adding a new association between OperationalLimitSet and Season 09/18/2024 12:00 PM Actions
6343 WG13 Issues CIM Issues In Progress Normal

61970-301, 61970-452, 61968-13

[GMDM #7] Convention for use of xxxPhase classes 09/18/2024 04:38 PM Actions
6346 WG13 Issues CIM Issues In Progress Normal

61970-301,, 61968-13

[GMDM #14] Indicating starting point for feeder tracing 09/18/2024 04:33 PM Actions
5947 WG13 Issues CIM Issues In Progress Normal

61970-456

Description classes inheriting from IdentifiedObject 09/19/2024 11:04 AM Actions
5015 WG13 Issues CIM Issues In Progress Normal

61970-501

Create validation constaints for the UML model and profile 09/22/2022 03:11 PM Actions
605 IEC 61850 User Feedback Task Force Improvement 4 H30 In Progress Normal

IEC 61850-10-3

Test and Simulation mode questions 06/21/2022 02:09 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/07/2023 08:21 AM Actions
5970 IEC 61850 User Feedback Task Force Improvement 2022 f2F IOP In Progress Normal

IEC 61850-6

SCT behavior needs to be specified regarding mismatch between substation section and IED section 11/08/2022 08:24 AM Actions
5336 IEC 61850 User Feedback Task Force Feature 4 TF 61850-80-6 In Progress Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 11/07/2023 08:28 AM Actions
6225 IEC 61850 User Feedback Task Force Feature 60 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - SetPhsOrig 02/28/2023 09:42 AM Actions
6224 IEC 61850 User Feedback Task Force Feature 59 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - SetRef 02/28/2023 09:42 AM Actions
6223 IEC 61850 User Feedback Task Force Feature 58 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - StrVal 02/28/2023 09:42 AM Actions
6222 IEC 61850 User Feedback Task Force Feature 57 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - SetNb 02/28/2023 09:42 AM Actions
6221 IEC 61850 User Feedback Task Force Feature 56 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - OnOff 02/28/2023 09:42 AM Actions
6219 IEC 61850 User Feedback Task Force Feature 54 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - VRtg, ARtg and HzRtg 02/28/2023 09:42 AM Actions
6218 IEC 61850 User Feedback Task Force Feature 53 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - PhyConnITF 02/28/2023 09:42 AM Actions
6217 IEC 61850 User Feedback Task Force Feature 52 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - NamAccRtg 02/28/2023 09:42 AM Actions
6216 IEC 61850 User Feedback Task Force Feature 51 RTE In Progress Normal

IEC 61850-7-4

Parameters not available in standardized LN - SetPhNum 02/28/2023 09:42 AM Actions
5374 IEC 61850 User Feedback Task Force Feature RTE In Progress Normal

IEC 61850-7-4

Creation of a new LN for protection function 02/28/2023 09:42 AM Actions
677 IEC 61850 User Feedback Task Force Feature 50 RTE In Progress Normal

IEC 61850-7-4

Impact of IEC 61869-13 (SAMU) 02/28/2023 09:42 AM Actions
611 IEC 61850 User Feedback Task Force Bug 5 RTE In Progress Normal

IEC 61850-7-4 / IEC 61850-80-6

Need a new DO (ENUM) to identify the protocol used for the SCADA exchange, in LN ITCI 11/07/2023 08:29 AM Actions
621 IEC 61850 User Feedback Task Force Feature 17 RTE In Progress Normal

IEC 61850-7-4/7-500

New controllable DO in RREC to define the mode of the recloser of the circuit breaker 05/11/2021 10:08 AM Actions
5124 IEC 61850 User Feedback Task Force Feature 3 TF 61850-80-6 In Progress Normal

IEC 61850-80-6

Telemonitoring blocking 12/21/2021 09:26 AM Actions
607 IEC 61850 User Feedback Task Force Support 6 H30 In Progress Normal

IEC 61850-80-6 (90-2)

LPHD.Sim management 06/21/2022 02:09 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
608 IEC 61850 User Feedback Task Force Feature 7 H30 In Progress Normal

IEC 61850-90-xx

Comprehensive set of requirements covering validation and supervision of all IEC 61850 communications 06/21/2022 02:09 AM Actions
6809 WG13 Issues CIM Issues In Progress Normal

IEC 61970-301

Migrate approved Ext* Protection Equipment and Network Code extensions into normative CIM 09/19/2024 01:57 PM Actions
6871 WG13 Issues CIM Issues In Progress Normal

IEC 61970-456, IEC 61970-450

Review the existing TP and SV profiles to determine a more logical split 09/18/2024 05:10 PM Actions
6773 WG13 Issues CIM Issues In Progress Normal

IEC61970-301, IEC61970-452

DC device containment rules need to be updated 09/19/2024 04:24 PM Actions
6711 61850-7-5 and 61850-7-500 IEC61850-7-5 WG10 Fall workshop In Progress Low SCL Modelling of Fault Measurements (RFMX) 02/29/2024 08:33 AM Actions
6792 Client Issues Resolved High Discrepancies between certificate tables and testprocedures - client testprocedure 06/11/2024 08:06 AM Actions
636 Client Issues Resolved High Mandate RCB reservation for Ed2.0 client and Amd1 server 04/20/2021 02:23 PM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
632 IEC 61850 User Feedback Task Force Support 8 H30 Resolved High

IEC 61850-9-2, IEC 61869-9

APPID 0x4000 - Sampled Values 12/05/2023 09:16 AM Actions
6830 Server Issues Resolved Normal Testing max number of persistent and non-persistent datasets 08/06/2024 08:11 AM Actions
6823 Server Issues Resolved Normal sAss4 - Step 2 indicates two different situations with localDetailCalling 08/06/2024 08:15 AM Actions
6821 Server Issues Resolved Normal Missing SMVsc check - sCnf130 07/23/2024 08:37 AM Actions
6817 Server Issues Resolved Normal sBr25 purge only when attribute value change 08/06/2024 08:20 AM Actions
6793 Client Issues Resolved Normal cCnf13 the ICT tool shall refuse the configuration 05/28/2024 09:04 AM Actions
6777 Client Issues Resolved Normal SCD import and Tool Functionality test procedures 05/28/2024 08:05 AM Actions
6776 Client Issues Resolved Normal cSBOns4 requires different control value 05/28/2024 08:07 AM Actions
6767 IEC 61850 User Feedback Task Force Feature Resolved Normal Specifying virtualized physical devices and LN's 06/03/2024 03:10 AM Actions
6751 IEC 61850 TPWG Issues Resolved Normal Update IEC 61850 QAP Addendum for adding requirement quickly 04/16/2024 08:16 AM Actions
6738 IEC 61850 User Feedback Task Force Improvement Resolved Normal Amending TGSN LN class with settings for adapting the signal 04/09/2024 08:19 AM Actions
6728 Client Issues Resolved Normal cSg13 refers to PIXIT entry Sg5/Sg6 but not clarified in the expected result 05/28/2024 08:17 AM Actions
6727 Client Issues Resolved Normal cDsN1bc, cFtN2 have no non-Ed2 specific error code 04/02/2024 08:42 AM Actions
6724 Client Issues Resolved Normal GOOSE Subscriber sGos12 test expects DUT to _send_ a GOOSE message 08/06/2024 08:49 AM Actions
6688 Client Issues Resolved Normal cSrvN10 - Ed1 specific error codes do not exist for MMS GetNameList 04/02/2024 08:42 AM Actions
6685 GOOSE Performance Issues Resolved Normal Device need to be certified for Ed2.1 server first 06/11/2024 08:28 AM Actions
6655 Client Issues Resolved Normal cLogN5 is missing in table A4.2 and certificate template 01/09/2024 08:28 AM Actions
6654 Client Issues Resolved Normal Tracking numbering mismatch Ed2 <> Ed2.1 01/09/2024 08:27 AM Actions
6631 SCL Tooling Issues Resolved Normal tTf1 (mustUnderstand) for the ICT test needs clarification 01/09/2024 08:59 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
6490 Client Issues Resolved Normal UCAiug requires Ed2Amd1 Jan 2024 - expect testlabs/toolvendors need more time 08/22/2023 08:16 AM Actions
6489 GOOSE Performance Issues Resolved Normal Reducing the needed resources for time correlated subscribed GOOSE not used for ping-pong 01/23/2024 08:05 AM Actions
6483 Server Issues Resolved Normal Need to be able to test 61850-7-420 (Ed2) 06/10/2024 09:25 AM Actions
6471 Client Issues Resolved Normal Select.response+ (Tissue 1753) 08/22/2023 08:10 AM Actions
6465 GOOSE Performance Issues Resolved Normal The Ed2 GOOSE performance also apply for Ed2Amd1 08/08/2023 08:42 AM Actions
6464 Client Issues Resolved Normal cSrv5 change the condition to GetDataValues or Reporting 07/11/2023 08:38 AM Actions
6463 Client Issues Resolved Normal cSrv7, cSvrN3 some clients only read DA (not DO) 07/25/2023 08:07 AM Actions
6370 IEC 61850 User Feedback Task Force Improvement Resolved Normal SBOns to be deprecated in future. 06/20/2023 09:39 AM Actions
6327 SCL Tooling Issues Resolved Normal tTf2 - export CID file only for Ed2.1? 05/16/2023 08:20 AM Actions
6326 SCL Tooling Issues Resolved Normal tIie1 - remove step 10-14 to undo previous changes 05/16/2023 08:09 AM Actions
6325 SCL Tooling Issues Resolved Normal PIXIT missing entries on tIie1 "when supported" 05/16/2023 08:04 AM Actions
6323 SCL Tooling Issues Resolved Normal tTtf5 IED name=None is not allowed tissue #1365 05/02/2023 08:20 AM Actions
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
6200 SCL Tooling Issues Resolved Normal tTf1 change Ed2/2007B to Ed2.1/2007B4 01/24/2023 08:33 AM Actions
6172 Client Issues Resolved Normal client check bits must be tested 12/13/2022 08:34 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 06/05/2023 01:58 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
5926 SCL Tooling Issues Resolved Normal Review ICT TP 11/29/2022 07:23 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
5347 Server Issues Resolved Normal How should time correlated GOOSE change status in GOOSE Performance test 10/04/2022 09:11 AM Actions
5327 Client Issues Resolved Normal PIXIT - add processing/mapping of quality bits 06/28/2022 09:44 AM Actions
5120 SCL Tooling Issues Resolved Normal LGOS/LSVS reference with functional naming (SCL) 08/09/2022 08:40 AM Actions
3115 Client Issues Resolved Normal Forward compatibility to Amd1 server with pre-assigned URCB/BRCB 06/14/2022 08:35 AM Actions
658 Client Issues Resolved Normal Verify Client does process a report before RptEna write respond+ 06/01/2021 08:23 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
5085 IEC 61850 User Feedback Task Force Feature 9 MH Resolved Normal

IEC 61850 7-1 / 7-4 Ed2.1,7-5

Clarifications on the local/remote concept 5/8 06/05/2023 01:58 AM Actions
5089 IEC 61850 User Feedback Task Force Improvement 13 MH Resolved Normal

IEC 61850 7-3 Ed2.1

Extension of CDC ASG 06/05/2023 01:58 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 Resolved Normal

IEC 61850-2

Devices types/acronyms 06/05/2023 01:58 AM Actions
633 IEC 61850 User Feedback Task Force Improvement 1 ZIV Resolved Normal

IEC 61850-4

Initial values of paramRev and valRev 11/21/2023 09:09 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
6803 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-6

In part 6, the reference of "pure client" LN by LNodes is not clear. 09/24/2024 08:14 AM Actions