6561 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Modeling of primary equipment 10/26/2023 04:20 AM Actions
6524 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/670 - enable/disable LN via setting / new DO SetMod 10/26/2023 03:54 AM Actions
6256 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-7-4

IEC 61850-7-4 list of abbreviations 06/06/2023 08:32 AM Actions
6220 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - opDITmms, DITmms 10/26/2023 05:00 AM Actions
6164 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1825 - Permission mode for control/setting of a scheduled entity from a client 10/26/2023 05:03 AM Actions
6158 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1760 - OMulti for MMET data objects 10/26/2023 05:14 AM Actions
6154 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1698 AnOut in GAPC 10/26/2023 05:19 AM Actions
6153 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1691 Contradictory statement for Mod.stVal 10/26/2023 05:19 AM Actions
5965 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Schedules - allow updates to single values while schedules are running 02/08/2024 05:31 AM Actions
5944 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 02/08/2024 04:27 AM Actions
5943 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/08/2024 04:35 AM Actions
5942 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 02/08/2024 04:37 AM Actions
5941 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 02/08/2024 04:39 AM Actions
5938 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

LN RADR evolution 02/08/2024 04:44 AM Actions
5937 IEC TC57 WG10 Future Work WG10 Future Work WG10 New Normal

IEC 61850-7-4

Report of current active setting group 02/08/2024 04:46 AM Actions
5936 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 02/08/2024 04:49 AM Actions
5933 IEC TC57 WG10 Future Work WG10 Future Work FNN Germany New Normal

IEC 61850-7-4

Proposal of a new LN class ASWI 02/08/2024 05:06 AM Actions
5927 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R15 New Normal

IEC 61850-7-4

CIM-61850 Harmonization - Add PosFlwIn data object to measurement classes 02/08/2024 05:22 AM Actions
5904 IEC TC57 WG10 Future Work WG10 Future Work WG10 New Normal

IEC 61850-7-4

Introduce alarm and counter DOs in 7-4 02/08/2024 05:22 AM Actions
5878 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Technical reports to be considered in edition 3 of IEC 61850-7-4 02/08/2024 05:20 AM Actions
5374 IEC 61850 User Feedback Task Force Feature RTE In Progress Normal

IEC 61850-7-4

Creation of a new LN for protection function 02/28/2023 09:42 AM Actions
3102 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1744 Clarification of Start Times in StrTm.setCal 02/08/2024 05:09 AM Actions
5876 IEC 61850 User Feedback Task Force Improvement FNN Germany Resolved Normal

IEC 61850-7-4 Ed.3

Proposal of a new LN class ASWI 06/05/2023 01:58 AM Actions
6703 IEC TC57 WG10 Future Work WG10 Future Work Ed 3 review New Normal

IEC 61850-7-4, IEC TS 61850-80-4

Part 80-4 Mapping to COSEM : add reactive and apparent energy data objects to MMTR and MMTN 02/09/2024 02:43 PM Actions
6429 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-4xx

Logical Node Groups with Dedicated Namespaces 10/26/2023 04:28 AM Actions
6303 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

IEC 61850-7-500

LN PDIF – setting for nominal current 06/05/2023 01:58 AM Actions
6737 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-90-29

Amending TGSN LN class with signal characteristics 04/09/2024 08:10 AM Actions
5330 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-90-30

LNode iedName attribute usage needs to be clarified 06/05/2023 01:58 AM Actions
5335 IEC 61850 User Feedback Task Force Improvement Dustin Tessier Resolved Normal

IEC 61850-90-4

Adding Normative Requirements & Conformance Testing Pertaining to Broadcast Storms 06/05/2023 01:58 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
5312 WG14 Issues CIM Issues Review Normal

IEC 61968

Change associations for meter UsagePoint to make it more like Measurements 12/28/2023 11:57 AM Actions
5316 CIM Joint Issues CIM Issues Open Normal

IEC 61968 series

How to best associate the CIM with other related information standards such as ERP, GML, and BIM 02/13/2023 12:23 PM Actions
6543 WG14 Part 9 Issues CIM Issues New Normal

IEC 61968-9 and others

AccuracyClass for sensors 10/19/2023 09:43 AM Actions
5979 WG14 Part 9 Issues CIM Issues New Normal

IEC 61968-9 and others

Meter to UsagePoint relationship should be many-to-many 06/15/2023 09:32 AM Actions
6736 WG13 Issues CIM Issues New Normal

IEC 61970-301

Quality61850 Class does not match the definition of Quality in IEC 61850-7-2 03/12/2024 04:05 PM Actions
5885 CIM Issues CIM Issues New Normal

IEC 61970-301

Consider CIM measurement classes that can hold multiple measured values with the same timestamp and quality. 07/13/2022 10:50 AM Actions
5883 CIM Issues CIM Issues New Normal

IEC 61970-301

Define a standard way to define IEC 61850 data object names for MeasurementTypes and ControlTypes 07/13/2022 10:31 AM Actions
5882 CIM Issues CIM Issues New Normal

IEC 61970-301

Model fans, motors, battery systems and similar auxiliary equipment with terminals 07/13/2022 10:24 AM Actions
6266 CIM Issues CIM Issues New Normal

IEC61968-11

Person and Person Role Modeling 02/15/2023 09:21 AM Actions
6677 CIM Joint Issues CIM Issues New Normal

IEC61968-11 Edition 4, IEC62325-301 Edition 4

Document Class Generalization Refinement 02/08/2024 10:33 AM Actions
6773 WG13 Issues CIM Issues New Normal

IEC61970-301, IEC61970-452

DC device containment rules need to be updated 04/29/2024 01:51 PM Actions
5934 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

TR IEC 61850-10-3, TR IEC 61850-90-20

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 02/08/2024 05:02 AM Actions
6163 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1804 - When e.g. LocSta = false, result of command to switch DO Mod with "station-control" not clear. 10/26/2023 05:06 AM Actions
6161 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1797 - SwModKey dependency of CSWI from LLN0 10/26/2023 05:08 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
6165 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1844 - Implementation of SumSwARs in 3-phase circuit breaker inaccurate 10/26/2023 05:01 AM Actions
6162 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1803 - Mechanical Blocking of 3 way switches 10/26/2023 05:07 AM Actions
6155 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1706 Missing LN for Miniature Circuit Breaker (MCB) 10/26/2023 05:19 AM Actions
6441 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-14

Extensions to "Z" Logical Nodes (e.g. ZBAT) 10/26/2023 04:10 AM Actions
6160 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-29

https://iec61850.tissue-db.com/tissue/1796 LPHD.PwrSupAlm as Omulti 10/26/2023 05:13 AM Actions
6427 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-3

New Logical Nodes - Battery Charger 10/26/2023 04:31 AM Actions
6159 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-3

https://iec61850.tissue-db.com/tissue/1789 SCBR - Coilxxx-Data-Objects shall be Omulti 10/26/2023 05:14 AM Actions
6432 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-30

SCL Engineering Lifecycle, Types and Security for SCL files and Elements 10/26/2023 04:26 AM Actions
6417 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-4

SCL Modelling of the Communication Network and All its Components 10/26/2023 04:40 AM Actions
6423 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TS IEC 61850-80-7

SCL Control Block 10/26/2023 04:32 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
633 IEC 61850 User Feedback Task Force Improvement 1 ZIV Resolved Normal

IEC 61850-4

Initial values of paramRev and valRev 11/21/2023 09:09 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 06/05/2023 01:58 AM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 06/05/2023 01:58 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 Resolved Normal

IEC 61850-2

Devices types/acronyms 06/05/2023 01:58 AM Actions
5086 IEC 61850 User Feedback Task Force Feature 10 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 6/8 06/05/2023 01:58 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
5087 IEC 61850 User Feedback Task Force Feature 11 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 7/8 06/05/2023 01:58 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
5088 IEC 61850 User Feedback Task Force Feature 12 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 8/8 06/05/2023 01:58 AM Actions
5089 IEC 61850 User Feedback Task Force Improvement 13 MH Resolved Normal

IEC 61850 7-3 Ed2.1

Extension of CDC ASG 06/05/2023 01:58 AM Actions
618 IEC 61850 User Feedback Task Force Improvement 14 RTE Resolved Normal

IEC 61850-90-3

Evolution of DO SumSqA of LN SPTRExt 05/09/2023 09:32 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
621 IEC 61850 User Feedback Task Force Feature 17 RTE In Progress Normal

IEC 61850-7-4/7-500

New controllable DO in RREC to define the mode of the recloser of the circuit breaker 05/11/2021 10:08 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
610 IEC 61850 User Feedback Task Force Improvement 2 RTE Resolved Normal

IEC 61850-6

Mapping of another phases system description to the generic phases phsA, phsB, phsC 05/09/2023 09:32 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 06/05/2023 01:58 AM Actions
3100 IEC 61850 User Feedback Task Force Improvement 2 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 06/05/2023 01:58 AM Actions
5322 IEC 61850 User Feedback Task Force Improvement 2 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - add optional data objects to support irregular interval schedules 06/05/2023 01:58 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/05/2023 01:58 AM Actions
624 IEC 61850 User Feedback Task Force Support 21 RTE Resolved Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 05/09/2023 09:32 AM Actions
625 IEC 61850 User Feedback Task Force Improvement 22 RTE Resolved Normal

IEC 61850-7-4

LN RADR evolution 12/05/2023 08:31 AM Actions
626 IEC 61850 User Feedback Task Force Improvement 23 RTE Resolved Normal

TR IEC 61850-90-4, IEC 61850-6

Extension of P-type to describe connexion type (PhysCon) 12/05/2023 08:52 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
5079 IEC 61850 User Feedback Task Force Feature 3 MH Resolved Normal

IEC 61850-7-1 Ed2.1, 7-500

Clarification on the ctlModel 2/3 06/05/2023 01:58 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 06/05/2023 01:58 AM Actions
5323 IEC 61850 User Feedback Task Force Improvement 3 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow updates to single values while schedules are running 06/05/2023 01:58 AM Actions
5124 IEC 61850 User Feedback Task Force Feature 3 TF 61850-80-6 In Progress Normal

IEC 61850-80-6

Telemonitoring blocking 12/21/2021 09:26 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
629 IEC 61850 User Feedback Task Force Improvement 35 RTE Resolved Normal

IEC TR 61850-90-29

TCTR and TVTR new DO to identify physical terminal allocation in the IED 01/16/2024 08:11 AM Actions