Project

General

Profile

WG10FutureWork #5878

Technical reports to be considered in edition 3 of IEC 61850-7-4

Added by Henry Dawidczak 11 months ago. Updated 11 months ago.

Status:
New
Priority:
Normal
Assignee:
WG10FutureWorkAdministrators
Start date:
07/05/2022
Due date:
% Done:

0%

Estimated time:
Source:
TF Unique ID:
WG10 Proposal:
Discuss in Upcoming Meeting:
No
Short Proposal:
Standard(s):
Needs More Information:

Description

The following TR should/shall be considered in IEC 61850-7-4 ed.3.0:
  • IEC 61850-90-3 - Condition monitoring diagnosis and analysis
  • IEC 61850-90-4 - Network engineering guidelines (data model for bridges, clocks)
  • IEC 61850-90-6 - Distribution Automation Systems
  • IEC 61850-90-11 - Logic modelling, some extensions in GAPC
  • IEC 61850-90-14 - FACTS, HVDC transmission and power conversion data modelling
  • IEC 61850-90-17 - PQ models
  • IEC 61850-90-18- Alarm handling
  • IEC 61850-90-21- Traveling wave modeling
  • IEC 61850-90-28- Communication supervision data model extensions
  • IEC 61850-90-29 - Physical resources (LPDI. LPDO, LRUT, LPPS, ...)
#1

Updated by Henry Dawidczak 11 months ago

Something went wrong with formatting.

#2

Updated by Vladan Cvejic 11 months ago

  • Description updated (diff)
#3

Updated by Vladan Cvejic 11 months ago

  • Description updated (diff)

Henry Dawidczak wrote in #note-1:

Something went wrong with formatting.

Redmine is using markup language for formatting so minus glued to text means Striked and so on. I just selected all entries and chose editing option for Unordered list . (it will be shown as star before text - bullets will come after saving).

  • text1
  • text2

Also available in: Atom PDF