WG10 Future Work #5878
Technical reports to be considered in edition 3 of IEC 61850-7-4
Status:
New
Priority:
Normal
Assignee:
-
Start date:
07/05/2022
Due date:
% Done:
0%
Estimated time:
Source:
TF Unique ID:
WG10 Proposal:
Discuss in Upcoming Meeting:
No
Short Proposal:
Standard(s):
IEC 61850-7-4
Needs More Information:
No
Assigned TF:
61850-7-4
Target edition:
Next
Description
The following TR should/shall be considered in IEC 61850-7-4 ed.3.0:
- IEC 61850-90-3 - Condition monitoring diagnosis and analysis
- IEC 61850-90-4 - Network engineering guidelines (data model for bridges, clocks)
- IEC 61850-90-6 - Distribution Automation Systems
- IEC 61850-90-11 - Logic modelling, some extensions in GAPC
- IEC 61850-90-14 - FACTS, HVDC transmission and power conversion data modelling
- IEC 61850-90-17 - PQ models
- IEC 61850-90-18- Alarm handling
- IEC 61850-90-21- Traveling wave modeling
- IEC 61850-90-28- Communication supervision data model extensions
- IEC 61850-90-29 - Physical resources (LPDI. LPDO, LRUT, LPPS, ...)