# Project Tracker ID Source Status Priority Standard(s) Subject Updated
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 05/09/2023 09:32 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
621 IEC 61850 User Feedback Task Force Feature 17 RTE In Progress Normal

IEC 61850-7-4/7-500

New controllable DO in RREC to define the mode of the recloser of the circuit breaker 05/11/2021 10:08 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
608 IEC 61850 User Feedback Task Force Feature 7 H30 In Progress Normal

IEC 61850-90-xx

Comprehensive set of requirements covering validation and supervision of all IEC 61850 communications 06/21/2022 02:09 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
6303 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

IEC 61850-7-500

LN PDIF – setting for nominal current 06/05/2023 01:58 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
676 IEC 61850 User Feedback Task Force Support 49 RTE Resolved Normal

IEC 61850-7-5

Clarification of addCause 06/05/2023 01:58 AM Actions
675 IEC 61850 User Feedback Task Force Support 48 RTE Resolved Normal

IEC 61850-7-4 Ed2.1

Clarification of blocked mode 11/21/2023 08:38 AM Actions
647 IEC 61850 User Feedback Task Force Support 57 ENTSO-E Resolved Normal

IEC 61850-7-500

Single phase and multi phase trip indication for the autorecloser 05/09/2023 09:32 AM Actions
624 IEC 61850 User Feedback Task Force Support 21 RTE Resolved Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 05/09/2023 09:32 AM Actions
607 IEC 61850 User Feedback Task Force Support 6 H30 In Progress Normal

IEC 61850-80-6 (90-2)

LPHD.Sim management 06/21/2022 02:09 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
6738 IEC 61850 User Feedback Task Force Improvement Resolved Normal Amending TGSN LN class with settings for adapting the signal 04/09/2024 08:19 AM Actions
6737 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-90-29

Amending TGSN LN class with signal characteristics 04/09/2024 08:10 AM Actions
6370 IEC 61850 User Feedback Task Force Improvement Resolved Normal SBOns to be deprecated in future. 06/20/2023 09:39 AM Actions
6248 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal

IEC 61850-6

There are controls between IEDs for automatic control functions, we need to be able to represent those controls in SCL (for configuration in SCT, data flow documentation...) 06/14/2023 08:33 AM Actions
6207 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-6

How to manage update of an IEDName or LDName for object references when valImport is false 06/05/2023 01:58 AM Actions
5970 IEC 61850 User Feedback Task Force Improvement 2022 f2F IOP In Progress Normal

IEC 61850-6

SCT behavior needs to be specified regarding mismatch between substation section and IED section 11/08/2022 08:24 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 06/05/2023 01:58 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
5876 IEC 61850 User Feedback Task Force Improvement FNN Germany Resolved Normal

IEC 61850-7-4 Ed.3

Proposal of a new LN class ASWI 06/05/2023 01:58 AM Actions
5372 IEC 61850 User Feedback Task Force Improvement RTE Resolved Normal

IEC 61850-7-1

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 06/05/2023 01:58 AM Actions
5335 IEC 61850 User Feedback Task Force Improvement Dustin Tessier Resolved Normal

IEC 61850-90-4

Adding Normative Requirements & Conformance Testing Pertaining to Broadcast Storms 06/05/2023 01:58 AM Actions
5330 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-90-30

LNode iedName attribute usage needs to be clarified 06/05/2023 01:58 AM Actions
5329 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-6

Clarify iedType attribute usage in DataTypeTemplates 06/05/2023 01:58 AM Actions
5323 IEC 61850 User Feedback Task Force Improvement 3 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow updates to single values while schedules are running 06/05/2023 01:58 AM Actions
5322 IEC 61850 User Feedback Task Force Improvement 2 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - add optional data objects to support irregular interval schedules 06/05/2023 01:58 AM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions
5089 IEC 61850 User Feedback Task Force Improvement 13 MH Resolved Normal

IEC 61850 7-3 Ed2.1

Extension of CDC ASG 06/05/2023 01:58 AM Actions
3100 IEC 61850 User Feedback Task Force Improvement 2 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 06/05/2023 01:58 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 06/05/2023 01:58 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
673 IEC 61850 User Feedback Task Force Improvement 47 RTE Resolved Normal

TR IEC 61850-7-500

CPU monitoring 11/21/2023 08:40 AM Actions
672 IEC 61850 User Feedback Task Force Improvement 46 RTE Resolved Normal

TR IEC 61850-7-500

Create DO indicating the source of synchronisation 11/21/2023 08:49 AM Actions
667 IEC 61850 User Feedback Task Force Improvement 4 WG10 Resolved Normal

IEC 61850-7-4

Report of current active setting group 06/05/2023 01:58 AM Actions
633 IEC 61850 User Feedback Task Force Improvement 1 ZIV Resolved Normal

IEC 61850-4

Initial values of paramRev and valRev 11/21/2023 09:09 AM Actions
630 IEC 61850 User Feedback Task Force Improvement 43 RTE Resolved Normal

IEC 61850-7-500

XCBR LN new DO to describe withdrawable circuit breaker 05/09/2023 09:32 AM Actions
629 IEC 61850 User Feedback Task Force Improvement 35 RTE Resolved Normal

IEC TR 61850-90-29

TCTR and TVTR new DO to identify physical terminal allocation in the IED 01/16/2024 08:11 AM Actions
626 IEC 61850 User Feedback Task Force Improvement 23 RTE Resolved Normal

TR IEC 61850-90-4, IEC 61850-6

Extension of P-type to describe connexion type (PhysCon) 12/05/2023 08:52 AM Actions
625 IEC 61850 User Feedback Task Force Improvement 22 RTE Resolved Normal

IEC 61850-7-4

LN RADR evolution 12/05/2023 08:31 AM Actions
618 IEC 61850 User Feedback Task Force Improvement 14 RTE Resolved Normal

IEC 61850-90-3

Evolution of DO SumSqA of LN SPTRExt 05/09/2023 09:32 AM Actions
610 IEC 61850 User Feedback Task Force Improvement 2 RTE Resolved Normal

IEC 61850-6

Mapping of another phases system description to the generic phases phsA, phsB, phsC 05/09/2023 09:32 AM Actions
605 IEC 61850 User Feedback Task Force Improvement 4 H30 In Progress Normal

IEC 61850-10-3

Test and Simulation mode questions 06/21/2022 02:09 AM Actions
6714 IEC TC57 WG10 Future Work WG10 Future Work IEC PAS 61850-90-3 New Normal Improve the models used for power regulation 02/20/2024 11:04 AM Actions
6703 IEC TC57 WG10 Future Work WG10 Future Work Ed 3 review New Normal

IEC 61850-7-4, IEC TS 61850-80-4

Part 80-4 Mapping to COSEM : add reactive and apparent energy data objects to MMTR and MMTN 02/09/2024 02:43 PM Actions
6701 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-3

Integration of proposed and canceled amendment 2 of part 7-3 02/08/2024 05:25 AM Actions
6700 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

Investigate to align to the new CIM model of transformers 02/08/2024 05:26 AM Actions
6613 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-6

IEC61850 Tissue 1833: Service SettingGroups.ConfSG clarification 02/08/2024 01:38 AM Actions
6604 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 02/08/2024 01:42 AM Actions
6578 IEC TC57 WG10 Future Work WG10 Future Work TF 61850-80-6 New Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 02/08/2024 01:50 AM Actions
6561 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Modeling of primary equipment 10/26/2023 04:20 AM Actions
6524 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/670 - enable/disable LN via setting / new DO SetMod 10/26/2023 03:54 AM Actions
6441 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-14

Extensions to "Z" Logical Nodes (e.g. ZBAT) 10/26/2023 04:10 AM Actions
6432 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-30

SCL Engineering Lifecycle, Types and Security for SCL files and Elements 10/26/2023 04:26 AM Actions
6429 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-4xx

Logical Node Groups with Dedicated Namespaces 10/26/2023 04:28 AM Actions
6427 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-3

New Logical Nodes - Battery Charger 10/26/2023 04:31 AM Actions
6423 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TS IEC 61850-80-7

SCL Control Block 10/26/2023 04:32 AM Actions
6419 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal Logical Nodes for SLD/Topology Aware Functions 02/09/2024 04:55 AM Actions
6417 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-4

SCL Modelling of the Communication Network and All its Components 10/26/2023 04:40 AM Actions
6412 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-3

Improved SCL Modelling of Function Inputs (InRef/ExtRef) 10/26/2023 04:41 AM Actions
6410 IEC TC57 WG10 Future Work WG10 Future Work UCA Test. Committee New Normal

IEC 61850-7-2

SBOns to be deprecated in future. 10/26/2023 04:42 AM Actions
6358 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850

IEC 61850-7-4 list of abbreviations 10/26/2023 04:56 AM Actions
6319 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

maxAttributes - conflicting requirements between GOOSE and reporting 10/26/2023 04:58 AM Actions
6316 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 10/26/2023 04:58 AM Actions
6265 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

track changes in SCL to know when a device needs to be updated based on new SCD version 02/19/2024 10:56 AM Actions
6220 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - opDITmms, DITmms 10/26/2023 05:00 AM Actions
6185 IEC TC57 WG10 Future Work WG10 Future Work 2022 IOP New Normal

IEC 61850-6

SCL Need to differentiate the difference in the number of GOOSE vs R-GOOSE 10/26/2023 05:01 AM Actions
6165 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1844 - Implementation of SumSwARs in 3-phase circuit breaker inaccurate 10/26/2023 05:01 AM Actions
6164 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1825 - Permission mode for control/setting of a scheduled entity from a client 10/26/2023 05:03 AM Actions
6163 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1804 - When e.g. LocSta = false, result of command to switch DO Mod with "station-control" not clear. 10/26/2023 05:06 AM Actions
6162 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1803 - Mechanical Blocking of 3 way switches 10/26/2023 05:07 AM Actions
6161 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1797 - SwModKey dependency of CSWI from LLN0 10/26/2023 05:08 AM Actions
6160 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-29

https://iec61850.tissue-db.com/tissue/1796 LPHD.PwrSupAlm as Omulti 10/26/2023 05:13 AM Actions
6159 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-3

https://iec61850.tissue-db.com/tissue/1789 SCBR - Coilxxx-Data-Objects shall be Omulti 10/26/2023 05:14 AM Actions
6158 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1760 - OMulti for MMET data objects 10/26/2023 05:14 AM Actions
6156 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-3

https://iec61850.tissue-db.com/tissue/1748 Arrays of CDC 10/26/2023 05:15 AM Actions
6155 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1706 Missing LN for Miniature Circuit Breaker (MCB) 10/26/2023 05:19 AM Actions
(1701-1800/2163) Per page: 25, 50, 100

Also available in: Atom CSV PDF