Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions
5089 IEC 61850 User Feedback Task Force Improvement 13 MH Resolved Normal

IEC 61850 7-3 Ed2.1

Extension of CDC ASG 06/05/2023 01:58 AM Actions
3100 IEC 61850 User Feedback Task Force Improvement 2 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 06/05/2023 01:58 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 06/05/2023 01:58 AM Actions
667 IEC 61850 User Feedback Task Force Improvement 4 WG10 Resolved Normal

IEC 61850-7-4

Report of current active setting group 06/05/2023 01:58 AM Actions
630 IEC 61850 User Feedback Task Force Improvement 43 RTE Resolved Normal

IEC 61850-7-500

XCBR LN new DO to describe withdrawable circuit breaker 05/09/2023 09:32 AM Actions
618 IEC 61850 User Feedback Task Force Improvement 14 RTE Resolved Normal

IEC 61850-90-3

Evolution of DO SumSqA of LN SPTRExt 05/09/2023 09:32 AM Actions
610 IEC 61850 User Feedback Task Force Improvement 2 RTE Resolved Normal

IEC 61850-6

Mapping of another phases system description to the generic phases phsA, phsB, phsC 05/09/2023 09:32 AM Actions
5970 IEC 61850 User Feedback Task Force Improvement 2022 f2F IOP In Progress Normal

IEC 61850-6

SCT behavior needs to be specified regarding mismatch between substation section and IED section 11/08/2022 08:24 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
605 IEC 61850 User Feedback Task Force Improvement 4 H30 In Progress Normal

IEC 61850-10-3

Test and Simulation mode questions 06/21/2022 02:09 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
7010 Client Issues New Low UCA logo is missing on the certificate template of the goose performance 10/01/2024 08:16 AM Actions
6488 GOOSE Performance Issues Resolved Low Incorrect reference 09/05/2023 08:08 AM Actions
653 Server Issues Rejected Low Subscriber can use maximum number of dataset elements 01/24/2023 09:03 AM Actions
654 Server Issues Rejected Low Publish/subscribe minimum length data GOOSE 01/24/2023 09:02 AM Actions
651 Server Issues Rejected Low Verify subscriber can accept maximum size GOOSE 01/24/2023 08:40 AM Actions
6990 Server Issues New Normal sSvp9 step 4 PTP class not 6/7 with/without holdover time? 10/01/2024 08:46 AM Actions
6991 Server Issues New Normal sCnf75 not all devices have control objects 10/01/2024 08:30 AM Actions
7008 Server Issues Rejected Normal Proposal to change Mandatory test items related to compatibility to Conditional 10/01/2024 08:19 AM Actions
6617 SCL Tooling Issues In Progress Normal tIieN1 - can a popup warning be considered as 'not allowed' 10/01/2024 08:15 AM Actions
6875 Client Issues In Progress Normal Update Client certificate template following the server certificate template 10/01/2024 08:12 AM Actions
6881 SCL Tooling Issues New Normal tDfe6b the SCT is not allowed to create new bindings 10/01/2024 08:12 AM Actions
6886 Server Issues In Progress Normal Tissue 1897 Data-change and data-update inclusion bitstring bits set in a report 10/01/2024 08:04 AM Actions
6896 Server Issues In Progress Normal sSrv17 10/01/2024 08:03 AM Actions
6904 Server Issues In Progress Normal sCtl14 in TP1.3 does not reflect the Issue #6214 resolution 09/27/2024 03:40 AM Actions
6989 Server Issues New Normal sSvp14 for Backwards the max MSVID is 34 char not 32 09/20/2024 06:29 AM Actions
6988 Server Issues New Normal sCtl16 in TP1.3 is in conflict with 7-4 Table B.1 09/20/2024 06:10 AM Actions
6905 Server Issues New Normal sSBOes8 why is time validated for Cancel but not for the Operate 09/11/2024 10:19 AM Actions
6903 Server Issues New Normal sGos20 requires the ICT to accept invalid SCD files due to FC out of tFCEnum 09/11/2024 04:13 AM Actions
6902 Client Issues New Normal cLogN5 has no Ed1 specific error code 09/11/2024 02:27 AM Actions
6897 Server Issues New Normal sCnf7, sCnf66 services can be defined on IED and AccessPoint when identical 09/05/2024 07:27 AM Actions
6835 Test Procedure Issues Issues New Normal Impact of publication of IEC 61850-6 Edition 2.2 on Edition 2.1 certification of Server/Client and Tools 08/07/2024 01:58 AM Actions
6724 Client Issues Resolved Normal GOOSE Subscriber sGos12 test expects DUT to _send_ a GOOSE message 08/06/2024 08:49 AM Actions
6817 Server Issues Resolved Normal sBr25 purge only when attribute value change 08/06/2024 08:20 AM Actions
6823 Server Issues Resolved Normal sAss4 - Step 2 indicates two different situations with localDetailCalling 08/06/2024 08:15 AM Actions
6830 Server Issues Resolved Normal Testing max number of persistent and non-persistent datasets 08/06/2024 08:11 AM Actions
6816 Client Issues Rejected Normal cBr31 is mandatory but for not applicable "small" client controllers 07/23/2024 08:51 AM Actions
6821 Server Issues Resolved Normal Missing SMVsc check - sCnf130 07/23/2024 08:37 AM Actions
6685 GOOSE Performance Issues Resolved Normal Device need to be certified for Ed2.1 server first 06/11/2024 08:28 AM Actions
6483 Server Issues Resolved Normal Need to be able to test 61850-7-420 (Ed2) 06/10/2024 09:25 AM Actions
6793 Client Issues Resolved Normal cCnf13 the ICT tool shall refuse the configuration 05/28/2024 09:04 AM Actions
6728 Client Issues Resolved Normal cSg13 refers to PIXIT entry Sg5/Sg6 but not clarified in the expected result 05/28/2024 08:17 AM Actions
6776 Client Issues Resolved Normal cSBOns4 requires different control value 05/28/2024 08:07 AM Actions
6777 Client Issues Resolved Normal SCD import and Tool Functionality test procedures 05/28/2024 08:05 AM Actions
6751 IEC 61850 TPWG Issues Resolved Normal Update IEC 61850 QAP Addendum for adding requirement quickly 04/16/2024 08:16 AM Actions
6688 Client Issues Resolved Normal cSrvN10 - Ed1 specific error codes do not exist for MMS GetNameList 04/02/2024 08:42 AM Actions
6727 Client Issues Resolved Normal cDsN1bc, cFtN2 have no non-Ed2 specific error code 04/02/2024 08:42 AM Actions
6489 GOOSE Performance Issues Resolved Normal Reducing the needed resources for time correlated subscribed GOOSE not used for ping-pong 01/23/2024 08:05 AM Actions
6631 SCL Tooling Issues Resolved Normal tTf1 (mustUnderstand) for the ICT test needs clarification 01/09/2024 08:59 AM Actions
(101-150/2199) Per page: 25, 50, 100

Also available in: Atom CSV PDF