Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
5936 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 02/08/2024 04:49 AM Actions
5937 IEC TC57 WG10 Future Work WG10 Future Work WG10 New Normal

IEC 61850-7-4

Report of current active setting group 02/08/2024 04:46 AM Actions
5938 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

LN RADR evolution 02/08/2024 04:44 AM Actions
5939 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-6

Mapping of another phases system description to the generic phases phsA, phsB, phsC 02/08/2024 04:43 AM Actions
5941 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 02/08/2024 04:39 AM Actions
5942 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 02/08/2024 04:37 AM Actions
5943 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/08/2024 04:35 AM Actions
5944 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 02/08/2024 04:27 AM Actions
5964 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-2

Incorrect Attribute type of TrgOp 02/08/2024 04:24 AM Actions
6578 IEC TC57 WG10 Future Work WG10 Future Work TF 61850-80-6 New Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 02/08/2024 01:50 AM Actions
6604 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 02/08/2024 01:42 AM Actions
6613 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-6

IEC61850 Tissue 1833: Service SettingGroups.ConfSG clarification 02/08/2024 01:38 AM Actions
6144 IEC TC57 WG10 Future Work WG10 Future Work IOP 2022 New Normal

IEC 61850-6

Need to add SCL mechanism to define a minimum MinTime 10/26/2023 05:21 AM Actions
6151 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-3

Use and configuration of ORG within the scope of InRef 7 BlkRef 10/26/2023 05:20 AM Actions
6153 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1691 Contradictory statement for Mod.stVal 10/26/2023 05:19 AM Actions
6154 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1698 AnOut in GAPC 10/26/2023 05:19 AM Actions
6155 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1706 Missing LN for Miniature Circuit Breaker (MCB) 10/26/2023 05:19 AM Actions
6156 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-3

https://iec61850.tissue-db.com/tissue/1748 Arrays of CDC 10/26/2023 05:15 AM Actions
6158 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1760 - OMulti for MMET data objects 10/26/2023 05:14 AM Actions
6159 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-3

https://iec61850.tissue-db.com/tissue/1789 SCBR - Coilxxx-Data-Objects shall be Omulti 10/26/2023 05:14 AM Actions
6160 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-90-29

https://iec61850.tissue-db.com/tissue/1796 LPHD.PwrSupAlm as Omulti 10/26/2023 05:13 AM Actions
6161 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1797 - SwModKey dependency of CSWI from LLN0 10/26/2023 05:08 AM Actions
6162 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1803 - Mechanical Blocking of 3 way switches 10/26/2023 05:07 AM Actions
6163 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-5

https://iec61850.tissue-db.com/tissue/1804 - When e.g. LocSta = false, result of command to switch DO Mod with "station-control" not clear. 10/26/2023 05:06 AM Actions
6164 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1825 - Permission mode for control/setting of a scheduled entity from a client 10/26/2023 05:03 AM Actions
6165 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

TR IEC 61850-7-500

https://iec61850.tissue-db.com/tissue/1844 - Implementation of SumSwARs in 3-phase circuit breaker inaccurate 10/26/2023 05:01 AM Actions
6185 IEC TC57 WG10 Future Work WG10 Future Work 2022 IOP New Normal

IEC 61850-6

SCL Need to differentiate the difference in the number of GOOSE vs R-GOOSE 10/26/2023 05:01 AM Actions
6220 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - opDITmms, DITmms 10/26/2023 05:00 AM Actions
6316 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 10/26/2023 04:58 AM Actions
6319 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

maxAttributes - conflicting requirements between GOOSE and reporting 10/26/2023 04:58 AM Actions
6358 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850

IEC 61850-7-4 list of abbreviations 10/26/2023 04:56 AM Actions
6410 IEC TC57 WG10 Future Work WG10 Future Work UCA Test. Committee New Normal

IEC 61850-7-2

SBOns to be deprecated in future. 10/26/2023 04:42 AM Actions
6412 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-3

Improved SCL Modelling of Function Inputs (InRef/ExtRef) 10/26/2023 04:41 AM Actions
6417 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-4

SCL Modelling of the Communication Network and All its Components 10/26/2023 04:40 AM Actions
6423 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TS IEC 61850-80-7

SCL Control Block 10/26/2023 04:32 AM Actions
6427 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-3

New Logical Nodes - Battery Charger 10/26/2023 04:31 AM Actions
6429 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-4xx

Logical Node Groups with Dedicated Namespaces 10/26/2023 04:28 AM Actions
6432 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-30

SCL Engineering Lifecycle, Types and Security for SCL files and Elements 10/26/2023 04:26 AM Actions
6561 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Modeling of primary equipment 10/26/2023 04:20 AM Actions
6441 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

TR IEC 61850-90-14

Extensions to "Z" Logical Nodes (e.g. ZBAT) 10/26/2023 04:10 AM Actions
6524 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/670 - enable/disable LN via setting / new DO SetMod 10/26/2023 03:54 AM Actions
6435 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

IEC 61850-9-2

Compression of Sample Value Messages 02/08/2024 05:36 AM Actions
6413 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

IEC 61850-80-7

Asset Management of Setting & Configuration Data 02/08/2024 05:32 AM Actions
6430 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

IEC 61850-6

Management of SCL File Sizes (Compression Techniques, Handling of Privates) 02/08/2024 03:17 AM Actions
6447 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low Enhanced Quality Information for Measurements (accuracy classes, update periods, filter applied, algorithm applied, etc.) 02/08/2024 03:16 AM Actions
6433 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low SCL Extensions (partial configuration updates in a top-down approach, mixed editions with private CDCs, etc.) 02/08/2024 03:03 AM Actions
6436 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

TR IEC 61850-10-3

SCL Modelling of the Test Equipment 02/08/2024 02:36 AM Actions
6446 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

TR IEC 61850-7-500

SCL Modelling of Fault Measurements (RFMX) 02/08/2024 02:12 AM Actions
632 IEC 61850 User Feedback Task Force Support 8 H30 Resolved High

IEC 61850-9-2, IEC 61869-9

APPID 0x4000 - Sampled Values 12/05/2023 09:16 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
6767 IEC 61850 User Feedback Task Force Bug New Normal Specifying virtualized physical devices and LN's 04/17/2024 10:45 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
6738 IEC 61850 User Feedback Task Force Improvement Resolved Normal Amending TGSN LN class with settings for adapting the signal 04/09/2024 08:19 AM Actions
6737 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-90-29

Amending TGSN LN class with signal characteristics 04/09/2024 08:10 AM Actions
629 IEC 61850 User Feedback Task Force Improvement 35 RTE Resolved Normal

IEC TR 61850-90-29

TCTR and TVTR new DO to identify physical terminal allocation in the IED 01/16/2024 08:11 AM Actions
626 IEC 61850 User Feedback Task Force Improvement 23 RTE Resolved Normal

TR IEC 61850-90-4, IEC 61850-6

Extension of P-type to describe connexion type (PhysCon) 12/05/2023 08:52 AM Actions
625 IEC 61850 User Feedback Task Force Improvement 22 RTE Resolved Normal

IEC 61850-7-4

LN RADR evolution 12/05/2023 08:31 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
633 IEC 61850 User Feedback Task Force Improvement 1 ZIV Resolved Normal

IEC 61850-4

Initial values of paramRev and valRev 11/21/2023 09:09 AM Actions
672 IEC 61850 User Feedback Task Force Improvement 46 RTE Resolved Normal

TR IEC 61850-7-500

Create DO indicating the source of synchronisation 11/21/2023 08:49 AM Actions
673 IEC 61850 User Feedback Task Force Improvement 47 RTE Resolved Normal

TR IEC 61850-7-500

CPU monitoring 11/21/2023 08:40 AM Actions
675 IEC 61850 User Feedback Task Force Support 48 RTE Resolved Normal

IEC 61850-7-4 Ed2.1

Clarification of blocked mode 11/21/2023 08:38 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
611 IEC 61850 User Feedback Task Force Bug 5 RTE In Progress Normal

IEC 61850-7-4 / IEC 61850-80-6

Need a new DO (ENUM) to identify the protocol used for the SCADA exchange, in LN ITCI 11/07/2023 08:29 AM Actions
5336 IEC 61850 User Feedback Task Force Feature 4 TF 61850-80-6 In Progress Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 11/07/2023 08:28 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/07/2023 08:21 AM Actions
6370 IEC 61850 User Feedback Task Force Improvement Resolved Normal SBOns to be deprecated in future. 06/20/2023 09:39 AM Actions
6263 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-6

GOOSE MinTime / Max Time - Probable discrepancy between Part-6 and Part-8 06/20/2023 08:44 AM Actions
6248 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal

IEC 61850-6

There are controls between IEDs for automatic control functions, we need to be able to represent those controls in SCL (for configuration in SCT, data flow documentation...) 06/14/2023 08:33 AM Actions
6256 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-7-4

IEC 61850-7-4 list of abbreviations 06/06/2023 08:32 AM Actions
6303 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

IEC 61850-7-500

LN PDIF – setting for nominal current 06/05/2023 01:58 AM Actions
6246 IEC 61850 User Feedback Task Force Feature Resolved Normal

IEC 61850-6

ExtRef cannot specify a Poll intended to be implemented as a GetDataSetValues request  06/05/2023 01:58 AM Actions
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
6207 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-6

How to manage update of an IEDName or LDName for object references when valImport is false 06/05/2023 01:58 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 06/05/2023 01:58 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
5876 IEC 61850 User Feedback Task Force Improvement FNN Germany Resolved Normal

IEC 61850-7-4 Ed.3

Proposal of a new LN class ASWI 06/05/2023 01:58 AM Actions
5372 IEC 61850 User Feedback Task Force Improvement RTE Resolved Normal

IEC 61850-7-1

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 06/05/2023 01:58 AM Actions
5335 IEC 61850 User Feedback Task Force Improvement Dustin Tessier Resolved Normal

IEC 61850-90-4

Adding Normative Requirements & Conformance Testing Pertaining to Broadcast Storms 06/05/2023 01:58 AM Actions
5331 IEC 61850 User Feedback Task Force Feature SCL IOP 2021 Resolved Normal

IEC 61850-6

Multiple LNodes implemented by same LN 06/05/2023 01:58 AM Actions
5330 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-90-30

LNode iedName attribute usage needs to be clarified 06/05/2023 01:58 AM Actions
5329 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-6

Clarify iedType attribute usage in DataTypeTemplates 06/05/2023 01:58 AM Actions
5323 IEC 61850 User Feedback Task Force Improvement 3 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow updates to single values while schedules are running 06/05/2023 01:58 AM Actions
5322 IEC 61850 User Feedback Task Force Improvement 2 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - add optional data objects to support irregular interval schedules 06/05/2023 01:58 AM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/05/2023 01:58 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 06/05/2023 01:58 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 Resolved Normal

IEC 61850-2

Devices types/acronyms 06/05/2023 01:58 AM Actions
5089 IEC 61850 User Feedback Task Force Improvement 13 MH Resolved Normal

IEC 61850 7-3 Ed2.1

Extension of CDC ASG 06/05/2023 01:58 AM Actions
5088 IEC 61850 User Feedback Task Force Feature 12 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 8/8 06/05/2023 01:58 AM Actions
5087 IEC 61850 User Feedback Task Force Feature 11 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 7/8 06/05/2023 01:58 AM Actions
5086 IEC 61850 User Feedback Task Force Feature 10 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 6/8 06/05/2023 01:58 AM Actions
5085 IEC 61850 User Feedback Task Force Feature 9 MH Resolved Normal

IEC 61850 7-1 / 7-4 Ed2.1,7-5

Clarifications on the local/remote concept 5/8 06/05/2023 01:58 AM Actions
5084 IEC 61850 User Feedback Task Force Feature 8 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 4/8 06/05/2023 01:58 AM Actions
5083 IEC 61850 User Feedback Task Force Feature 7 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 3/8 06/05/2023 01:58 AM Actions
5082 IEC 61850 User Feedback Task Force Feature 6 MH Resolved Normal

IEC 61850-7-4,7-5

Clarifications on the local/remote concept 2/8 06/05/2023 01:58 AM Actions
5081 IEC 61850 User Feedback Task Force Feature 5 MH Resolved Normal

IEC 61850-7-1 Ed2.1/7-4 Ed2.1 Annex B/7-500

Clarifications on the local/remote concept 1/8 06/05/2023 01:58 AM Actions
(401-500/2162) Per page: 25, 50, 100

Also available in: Atom CSV PDF