588 IEC 61850 User Feedback Task Force Feature 1548 IOP_2019 Closed Normal

IEC 61850-6

More than one redundant PhysConn for ConnectedAP of IED AP and no redundant PhysConn on same AP 06/21/2022 09:28 AM Actions
424 IEC 61850 User Feedback Task Force Support 15 ENTSO-E Closed Normal

6

Vendor Tools shall allow (vendor independant) Integration tools doing engineering based on ICD Files, thus allowing them to in 12/06/2022 09:01 AM Actions
534 IEC 61850 User Feedback Task Force Feature 15 IOP_2017/24 Closed Normal

IEC 61850-6, IEC 61850-7-2

A GCB or MSVCB can only have one single control block address entry in the whole communication section 06/21/2022 09:24 AM Actions
500 IEC 61850 User Feedback Task Force Support 15 IOP_2015 Closed Normal

6

2.2. BufMod is optional for ReportControl. No default value provided by the schema. SCT is interpreting as unbuffered only. Com 06/21/2022 09:12 AM Actions
587 IEC 61850 User Feedback Task Force Feature 1404 IOP_2019 Closed Normal

IEC 61850-6

LNodeTypes and DOTypes not used in the IED section - is it allowed to keep them in DataTypeTemplate section? 02/11/2021 07:01 AM Actions
533 IEC 61850 User Feedback Task Force Support 14 IOP_2017/23 Closed Normal MSVID shall be unique. The integrated application SCD file allowed duplicate SVID’s for two merging units. 06/21/2022 09:13 AM Actions
499 IEC 61850 User Feedback Task Force Support 14 IOP_2015 Closed Normal

6

Issue 4 – Private section – namespace moved from SCL node to Private nodes ICT added the namespace within the privates instead o 06/21/2022 09:12 AM Actions
423 IEC 61850 User Feedback Task Force Support 14 ENTSO-E Closed Normal Conformance test for SICS. 02/11/2021 07:47 AM Actions
457 IEC 61850 User Feedback Task Force Feature 14 IOP_2013 Closed Normal

IEC 61850-6

A SCL file is created without maxAttributes attribute defined. What does it mean semantically it the attr. is missing? 02/11/2021 07:46 AM Actions
586 IEC 61850 User Feedback Task Force Feature 1340 IOP_2019 Closed Normal

IEC 61850-6

Client application cannot connect to IED that are having issue with format of AP-Title 07/05/2022 08:26 AM Actions
585 IEC 61850 User Feedback Task Force Feature 1337 IOP_2019 Closed Normal

IEC 61850-6

SCT unable to configure the device to communicate on multiple subnets due to having a single AP (with all Eth. Ports) 07/05/2022 08:24 AM Actions
422 IEC 61850 User Feedback Task Force Support 13 ENTSO-E Closed Normal Mapping utility signals to IEC 61850 objectcs from specification perspective 06/05/2023 01:59 AM Actions
532 IEC 61850 User Feedback Task Force Feature 13 IOP_2017/22 Closed Normal

IEC 61850-7-2

An implementation do not allow BRCB resvTms to be written while rptEnable is True 06/21/2022 09:24 AM Actions
498 IEC 61850 User Feedback Task Force Support 13 IOP_2015 Closed Normal

6

Issue 3 – GoCB confRev - behaviour if ConfRev=“0“ IED rejected that value. 7-2: If there are inconsistent attribute values in t 06/21/2022 09:12 AM Actions
456 IEC 61850 User Feedback Task Force Support 13 IOP_2013 Closed Normal A client only ICD did not have a ClientServices section. An SCT imported the file and assigned used the IED to reserve a RCB wit 06/21/2022 09:00 AM Actions
421 IEC 61850 User Feedback Task Force Support 12 ENTSO-E Closed Normal

IEC 61850-4

Project management as proposed by IEC61850-4 is not supported by commercially available tools 06/05/2023 01:59 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
531 IEC 61850 User Feedback Task Force Feature 12 IOP_2017/21 Closed Normal

IEC 61850-8-1, IEC 61850-9-2

Merging Unit is not capable to publish SV outside of the recommended destination MAC address range (even though 8-1 is informative) 06/21/2022 09:24 AM Actions
497 IEC 61850 User Feedback Task Force Support 12 IOP_2015 Closed Normal

6

Issue 2 - IED restrictions not known by SCT 2.1 IED support 50% URCB and 50% BRCB Service section provide a total RCB number 2. 06/21/2022 09:12 AM Actions
455 IEC 61850 User Feedback Task Force Feature 12 IOP_2013 Closed Normal How does a SCT know the maximum number of instantiated RCBs allowed in an IED and what the allowed distribution per RCB? 02/11/2021 07:47 AM Actions
584 IEC 61850 User Feedback Task Force Feature 1122 IOP_2019 Closed Normal

IEC 61850-6

SCL validation - Should all name parts of PhV be contained in the doName? 05/09/2023 09:12 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
420 IEC 61850 User Feedback Task Force Support 11 ENTSO-E Closed Normal Procedures to establish client / server communications should be defined 06/05/2023 01:59 AM Actions
530 IEC 61850 User Feedback Task Force Feature 11 IOP_2017/20 Closed Normal

IEC 61850-6

SCT is passing ICD errors to SCD. 06/21/2022 09:24 AM Actions
496 IEC 61850 User Feedback Task Force Support 11 IOP_2015 Closed Normal

6

DUSTIN: Issue 3: Symmetrical Bindings of DA In case of late Binding at DO/DA Level. IED expects DO at later binding, but source 06/21/2022 09:12 AM Actions
419 IEC 61850 User Feedback Task Force Support 10.2 ENTSO-E Closed Normal

IEC 61850-7-2

Also many other features of GOOSE messaging are left to the manufacturer to choose. 12/06/2022 09:01 AM Actions
418 IEC 61850 User Feedback Task Force Support 10.1 ENTSO-E Closed Normal

IEC 61850-6

DataSets for GOOSE messaging - modeling with: only DA, only DO or both? 02/11/2021 08:02 AM Actions
529 IEC 61850 User Feedback Task Force Feature 10 IOP_2017/16 Closed Normal

IEC 61850-6

SCT imports ICD with SGCB, and the settings with FC= SP outside this setting group are changed to FC=SE in the exported DOType part 06/21/2022 09:24 AM Actions
495 IEC 61850 User Feedback Task Force Support 10 IOP_2015 Closed Normal

6

Issue 2: SCT Behavior When Revising/Replacing IED Configuration Between SCT Tools In terms of the data model structure and comm 06/21/2022 09:12 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
520 IEC 61850 User Feedback Task Force Support 1 IOP_2017/1 Closed Normal IEC 61850-6 leaves the definition of the meaning of the authentication options to the SCSM. However, neither 8-1 nor IEC 62351-6 06/21/2022 09:13 AM Actions
486 IEC 61850 User Feedback Task Force Support 1 IOP_2015 Closed Normal

7-1, 7-4

An ICT has required LGOS configuration coming from SCT to be able to subscribe GOOSE. Is it the way it should work? And is it re 06/21/2022 09:11 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
6784 IEC 61850 Certificate IEC 61850 Certificate Approved Normal iRTU 05/03/2024 04:14 PM Actions
6783 IEC 61850 Certificate IEC 61850 Certificate Approved Normal CCI Power Plant Controller 05/03/2024 03:02 PM Actions
6782 IEC 61850 Certificate IEC 61850 Certificate Approved Normal iCE-CPU 05/03/2024 02:51 PM Actions
6781 IEC 61850 Certificate IEC 61850 Certificate Approved Normal EcoStruxure™ Power Automation System Engineering 05/03/2024 02:34 PM Actions
6754 IEC 61850 Certificate IEC 61850 Certificate Approved Normal N60 04/30/2024 08:37 AM Actions
6771 IEC 61850 Certificate IEC 61850 Certificate Approved Normal EcoStruxure Foxboro SCADA SCD6000 CPU 04/30/2024 08:28 AM Actions
6772 IEC 61850 Certificate IEC 61850 Certificate Approved Normal EcoStruxure Foxboro SCADA SCD6000 CPU 04/28/2024 08:38 AM Actions
6762 IEC 61850 Certificate IEC 61850 Certificate Approved Normal YH-HSA-ICD 04/25/2024 07:23 AM Actions
6761 IEC 61850 Certificate IEC 61850 Certificate Approved Normal YH-HSA-ICD 04/25/2024 07:22 AM Actions
6770 IEC 61850 Certificate IEC 61850 Certificate Approved Normal EdgeHub DataWorX 04/24/2024 02:00 PM Actions
5751 WG16 Issues CIM Issues Open Normal Mkt classes review 04/18/2024 11:03 AM Actions
6756 General Testing Issues Improvement Closed Normal Should UCA accredit and Certify IEC 61850-3 04/16/2024 08:50 AM Actions
6763 IEC 61850 Certificate IEC 61850 Certificate Approved Normal ETOPD1000 04/15/2024 07:33 AM Actions
6760 IEC 61850 Certificate IEC 61850 Certificate Approved Normal SEL-751 and SEL-787L (Variant) 04/15/2024 06:52 AM Actions
6759 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PCM600 04/15/2024 06:45 AM Actions
6755 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Multilin N60 04/07/2024 11:11 AM Actions
6748 IEC 61850 Certificate IEC 61850 Certificate Approved Normal IED1-E11D1 03/29/2024 09:16 AM Actions
6746 IEC 61850 Certificate IEC 61850 Certificate Approved Normal DW61850CLIENT 03/29/2024 09:07 AM Actions
6747 IEC 61850 Certificate IEC 61850 Certificate Approved Normal WAGO 750-8212/0040-0001 03/29/2024 09:06 AM Actions
6742 IEC 61850 Certificate IEC 61850 Certificate Approved Normal V321 Arc Flash Protection System 03/24/2024 02:16 PM Actions
6741 IEC 61850 Certificate IEC 61850 Certificate Approved Normal SA-G3000 03/24/2024 02:10 PM Actions
6740 IEC 61850 Certificate IEC 61850 Certificate Approved Normal ALARM ANNUNCIATOR MBAS 0600 03/24/2024 01:50 PM Actions
6732 IEC 61850 Certificate IEC 61850 Certificate Approved Normal ETMDU1000 03/11/2024 08:39 AM Actions
6733 IEC 61850 Certificate IEC 61850 Certificate Approved Normal ETLID1000 03/11/2024 08:38 AM Actions
6731 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Micom P40 Agile 5th Generation P84 03/11/2024 08:24 AM Actions
6674 Server Issues Closed Normal Discuss changes to submission form and Certificates 03/01/2024 10:10 AM Actions
5910 Server Issues Closed Normal Need to test that IEDs support 1 Step and 2 Step clocks: IOP 2022 03/01/2024 09:53 AM Actions
6719 IEC 61850 Certificate IEC 61850 Certificate Approved Normal SPiN-CNAS 02/24/2024 11:11 AM Actions
6720 IEC 61850 Certificate IEC 61850 Certificate Approved Normal SPiN-CNAS 02/24/2024 11:10 AM Actions
6721 IEC 61850 Certificate IEC 61850 Certificate Approved Normal SPiN-MDAS 02/24/2024 11:09 AM Actions
6718 IEC 61850 Certificate IEC 61850 Certificate Approved Normal SPiN-CMAS 02/24/2024 10:52 AM Actions
6717 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PowerLogic™ P5F30 protection relays 02/24/2024 10:42 AM Actions
6716 IEC 61850 Certificate IEC 61850 Certificate Approved Normal ETR600-T 02/24/2024 10:35 AM Actions
6715 IEC 61850 Certificate IEC 61850 Certificate Approved Normal ETR600-BC 02/24/2024 10:29 AM Actions
6709 IEC 61850 Certificate IEC 61850 Certificate Approved Normal DRTS 66L 02/13/2024 10:10 AM Actions
6708 IEC 61850 Certificate IEC 61850 Certificate Approved Normal DRTS 66L 02/13/2024 10:09 AM Actions
6707 IEC 61850 Certificate IEC 61850 Certificate Approved Normal SLP-K140 02/11/2024 10:55 AM Actions
6706 IEC 61850 Certificate IEC 61850 Certificate Approved Normal STP-K120 02/10/2024 11:35 AM Actions
6705 IEC 61850 Certificate IEC 61850 Certificate Approved Normal VIPAMj3500II-TR 02/10/2024 10:43 AM Actions
6704 IEC 61850 Certificate IEC 61850 Certificate Approved Normal VIPAM3500plusFM 02/10/2024 10:38 AM Actions
5121 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-2

sFt2ab does not verify that the LastModified value is consistent or changes when file is modified 02/08/2024 05:18 AM Actions
6694 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PCS-902S Line Distance Relay 02/05/2024 08:53 AM Actions
6603 IEC 61850 Certificate IEC 61850 Certificate Approved Normal BCU 500 02/05/2024 08:52 AM Actions
6264 IEC 61850 Certificate IEC 61850 Certificate Approved Normal SIPROTEC 5 - 7VU85 High Speed Busbar Transfer 02/05/2024 08:52 AM Actions
6696 IEC 61850 Certificate IEC 61850 Certificate Approved Normal REX610 02/05/2024 07:49 AM Actions
6695 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PCS-221S Merging Unit 02/05/2024 06:50 AM Actions
4916 WG13 Issues CIM Issues Closed Normal documenation on VoltagteControlZone is wrong. This may hav 02/04/2024 02:04 AM Actions
5049 WG13 Issues CIM Issues Closed Normal Inconsistent naming for p,q,r,x and others 02/04/2024 01:58 AM Actions
6692 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PowerLogic™ P3 02/03/2024 11:00 AM Actions
6691 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PowerLogic™ P3U30 02/03/2024 10:55 AM Actions
6690 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PCS-9710S Remote Terminal Unit 02/03/2024 10:49 AM Actions
6689 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PowerLogicTM P3 02/03/2024 10:19 AM Actions
6682 IEC 61850 Certificate IEC 61850 Certificate Approved Normal NS3560 01/22/2024 07:08 AM Actions
6683 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Prometer 540 01/21/2024 11:03 AM Actions
6681 IEC 61850 Certificate IEC 61850 Certificate Approved Normal NSR-385AG 01/21/2024 10:50 AM Actions
6637 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PCM600 01/21/2024 10:44 AM Actions
6676 IEC 61850 Certificate IEC 61850 Certificate Approved Normal P841 (GE MiCOM Agile P841) 01/13/2024 08:37 AM Actions
6675 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Prometer 100 01/13/2024 08:27 AM Actions
6670 IEC 61850 Certificate IEC 61850 Certificate Approved Normal DRTS 66L Test Set 01/08/2024 10:36 AM Actions
6671 IEC 61850 Certificate IEC 61850 Certificate Approved Normal DRTS 66L Test SEt 01/08/2024 10:35 AM Actions
6673 IEC 61850 Certificate IEC 61850 Certificate Approved Normal G-ISD 01/08/2024 09:12 AM Actions
6672 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Apex 540 01/08/2024 08:48 AM Actions
6626 IEC 61850 Certificate IEC 61850 Certificate Approved Normal CSC-283 - Motor Protection IED 01/08/2024 08:34 AM Actions
6660 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PSF640 Feeder Protection and Control 12/28/2023 08:10 PM Actions
6662 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PowerLogicTM P7 12/28/2023 08:44 AM Actions