IEC 61850 Certificate #6746
DW61850CLIENT
Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Client
Company:
DONGWOO ELECTRIC CORP.
Address:
34, Oseongseo-ro, Anjung-eup, Pyeongtaek-si, Gyeonggi-do, Republic of Korea, 17928
Product:
DW61850CLIENT
HW Version:
1.0 (HP Z2 Workstation )
SW Version:
1.0
Key Words:
Test Procedure Version:
1.2
IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), SBO Control (12b), Service Tracking (B15), Setting Group (B4), Setting Group Definition (B4+), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
03/29/2024
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Testing Laboratory (A)
Test Document:
Certificate Name:
24-017428-01-1_DONGWOO_DW61850CLIENT_Client_Ed2_Certificate_KTL.pdf
Certificate Hash:
SHA256: 9083217C473D7CA06F5E148F8E8CD31075404F74F3F727B3A39F05CD494529CF
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
DW61850-202410
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-
Product Variants:
Time Activated Control:
Description
SA-OPD (Substation Automation Operation Software)
Files