Project

General

Profile

IEC 61850 Certificate #6719

SPiN-CNAS

Added by Herbert Falk 2 months ago. Updated 2 months ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Client
Company:
DAEWOONG ELECTRIC Co., Ltd.
Address:

Hwanggeumro 127beon-gil 10, Yangchon-eup,
Gimpo-si, Gyeonggi-do, 10048, Republic of Korea

Product:
SPiN-CNAS
HW Version:
1.0.0/SPiN-SC2
SW Version:
1.0.0
Key Words:
Test Procedure Version:

1.2

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), SBO Control (12b), Service Tracking (B15), Setting Group (B4), Setting Group Definition (B4+), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
02/24/2024
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Electrotechnology Research Institute (A)
Certificate Name:
24TC200132_DAEWOONG_SA-ICD_SPiN-CNAS_Client_Ed2_KERI.pdf
Certificate Hash:
24TC200132_DAEWOONG_SA-ICD_SPiN-CNAS_Client_Ed2_KERI.pdf
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
DWE-SNGW2301
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-

Description

SA-ICD (Substation Automation Information Connecting Device)


Files

#1

Updated by Herbert Falk 2 months ago

  • HW Version changed from SPiN-SC2 to 1.0.0/SPiN-SC2

Also available in: Atom PDF