Project

General

Profile

IEC 61850 Certificate #6770

EdgeHub DataWorX

Added by Herbert Falk 3 months ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Client
Company:
LS ELECTRIC
Address:

LS ELECTRIC R&D Center, 40, LS-ro 116beon-gil, Dongan-gu, Anyang-si, Gyeonggi-do, Republic of Korea, 14118

Product:
EdgeHub DataWorX
HW Version:
16ARH7H
SW Version:
2.01.0002
Key Words:
Test Procedure Version:

1.2

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), SBO Control (12b), Service Tracking (B15), Setting Group (B4), Setting Group Definition (B4+), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
04/24/2024
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Testing Laboratory (A)
Certificate Name:
24-012366-01-1_LS ELECTRIC_EdgeHub_Client_Ed2_Certificate_KTL.pdf
Certificate Hash:
SHA256: C921420370979FF7A8D6C22FF1E1319E522840A9AF612DD969EEF0577B39897D
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
LS_EHDWX_201
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-
Product Variants:

Description

EdgeHub DataWorX is SW that acts as a bridge between IT and OT areas.
DataWorX collect/process/save data from various types of equipment in the OT area.
You can build a system that provides data to IT area.


Files

No data to display

Also available in: Atom PDF