# Project Tracker ID Source Status Priority Standard(s) Subject Updated
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
5372 IEC 61850 User Feedback Task Force Improvement RTE Resolved Normal

IEC 61850-7-1

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 06/05/2023 01:58 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 06/05/2023 01:58 AM Actions
5080 IEC 61850 User Feedback Task Force Feature 4 MH Resolved Normal

IEC 61850-7-1 Ed2.1 ,7-500

Clarification on the ctlModel 3/3 06/05/2023 01:58 AM Actions
5079 IEC 61850 User Feedback Task Force Feature 3 MH Resolved Normal

IEC 61850-7-1 Ed2.1, 7-500

Clarification on the ctlModel 2/3 06/05/2023 01:58 AM Actions
5084 IEC 61850 User Feedback Task Force Feature 8 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 4/8 06/05/2023 01:58 AM Actions
5083 IEC 61850 User Feedback Task Force Feature 7 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 3/8 06/05/2023 01:58 AM Actions
5081 IEC 61850 User Feedback Task Force Feature 5 MH Resolved Normal

IEC 61850-7-1 Ed2.1/7-4 Ed2.1 Annex B/7-500

Clarifications on the local/remote concept 1/8 06/05/2023 01:58 AM Actions
6256 IEC 61850 User Feedback Task Force Bug Resolved Normal

IEC 61850-7-4

IEC 61850-7-4 list of abbreviations 06/06/2023 08:32 AM Actions
3101 IEC 61850 User Feedback Task Force Bug 3 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 06/05/2023 01:58 AM Actions
3100 IEC 61850 User Feedback Task Force Improvement 2 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 06/05/2023 01:58 AM Actions
3099 IEC 61850 User Feedback Task Force Improvement 1 TissueDB Resolved Normal

IEC 61850-7-4

IEC61850.Tissue #1756 Event driven schedules – Extend description 06/05/2023 01:58 AM Actions
667 IEC 61850 User Feedback Task Force Improvement 4 WG10 Resolved Normal

IEC 61850-7-4

Report of current active setting group 06/05/2023 01:58 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 05/09/2023 09:32 AM Actions
625 IEC 61850 User Feedback Task Force Improvement 22 RTE Resolved Normal

IEC 61850-7-4

LN RADR evolution 12/05/2023 08:31 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
5876 IEC 61850 User Feedback Task Force Improvement FNN Germany Resolved Normal

IEC 61850-7-4 Ed.3

Proposal of a new LN class ASWI 06/05/2023 01:58 AM Actions
675 IEC 61850 User Feedback Task Force Support 48 RTE Resolved Normal

IEC 61850-7-4 Ed2.1

Clarification of blocked mode 11/21/2023 08:38 AM Actions
5088 IEC 61850 User Feedback Task Force Feature 12 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 8/8 06/05/2023 01:58 AM Actions
5087 IEC 61850 User Feedback Task Force Feature 11 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 7/8 06/05/2023 01:58 AM Actions
5086 IEC 61850 User Feedback Task Force Feature 10 MH Resolved Normal

IEC 61850-7-4 Ed2.1 ,7-5

Clarifications on the local/remote concept 6/8 06/05/2023 01:58 AM Actions
5323 IEC 61850 User Feedback Task Force Improvement 3 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow updates to single values while schedules are running 06/05/2023 01:58 AM Actions
5322 IEC 61850 User Feedback Task Force Improvement 2 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - add optional data objects to support irregular interval schedules 06/05/2023 01:58 AM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions
5082 IEC 61850 User Feedback Task Force Feature 6 MH Resolved Normal

IEC 61850-7-4,7-5

Clarifications on the local/remote concept 2/8 06/05/2023 01:58 AM Actions
676 IEC 61850 User Feedback Task Force Support 49 RTE Resolved Normal

IEC 61850-7-5

Clarification of addCause 06/05/2023 01:58 AM Actions
6303 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

IEC 61850-7-500

LN PDIF – setting for nominal current 06/05/2023 01:58 AM Actions
647 IEC 61850 User Feedback Task Force Support 57 ENTSO-E Resolved Normal

IEC 61850-7-500

Single phase and multi phase trip indication for the autorecloser 05/09/2023 09:32 AM Actions
630 IEC 61850 User Feedback Task Force Improvement 43 RTE Resolved Normal

IEC 61850-7-500

XCBR LN new DO to describe withdrawable circuit breaker 05/09/2023 09:32 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
632 IEC 61850 User Feedback Task Force Support 8 H30 Resolved High

IEC 61850-9-2, IEC 61869-9

APPID 0x4000 - Sampled Values 12/05/2023 09:16 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
5123 IEC 61850 User Feedback Task Force Feature 2 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

ACSI service for link supervision on application level 06/05/2023 01:58 AM Actions
5122 IEC 61850 User Feedback Task Force Feature 1 TF 61850-80-6 Resolved Normal

IEC 61850-90-28

New LN in LN group L to reflect the status of TPAA between Proxy/Gateway and IED 06/05/2023 01:58 AM Actions
6737 IEC 61850 User Feedback Task Force Improvement Resolved Normal

IEC 61850-90-29

Amending TGSN LN class with signal characteristics 04/09/2024 08:10 AM Actions
618 IEC 61850 User Feedback Task Force Improvement 14 RTE Resolved Normal

IEC 61850-90-3

Evolution of DO SumSqA of LN SPTRExt 05/09/2023 09:32 AM Actions
5330 IEC 61850 User Feedback Task Force Improvement SCL IOP 2021 Resolved Normal

IEC 61850-90-30

LNode iedName attribute usage needs to be clarified 06/05/2023 01:58 AM Actions
5335 IEC 61850 User Feedback Task Force Improvement Dustin Tessier Resolved Normal

IEC 61850-90-4

Adding Normative Requirements & Conformance Testing Pertaining to Broadcast Storms 06/05/2023 01:58 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
629 IEC 61850 User Feedback Task Force Improvement 35 RTE Resolved Normal

IEC TR 61850-90-29

TCTR and TVTR new DO to identify physical terminal allocation in the IED 01/16/2024 08:11 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
673 IEC 61850 User Feedback Task Force Improvement 47 RTE Resolved Normal

TR IEC 61850-7-500

CPU monitoring 11/21/2023 08:40 AM Actions
672 IEC 61850 User Feedback Task Force Improvement 46 RTE Resolved Normal

TR IEC 61850-7-500

Create DO indicating the source of synchronisation 11/21/2023 08:49 AM Actions
626 IEC 61850 User Feedback Task Force Improvement 23 RTE Resolved Normal

TR IEC 61850-90-4, IEC 61850-6

Extension of P-type to describe connexion type (PhysCon) 12/05/2023 08:52 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
6714 IEC TC57 WG10 Future Work WG10 Future Work IEC PAS 61850-90-3 New Normal Improve the models used for power regulation 02/20/2024 11:04 AM Actions
6447 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low Enhanced Quality Information for Measurements (accuracy classes, update periods, filter applied, algorithm applied, etc.) 02/08/2024 03:16 AM Actions
6439 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New High Inter-substation GOOSE Naming convention (90-1) 10/26/2023 03:42 AM Actions
6433 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low SCL Extensions (partial configuration updates in a top-down approach, mixed editions with private CDCs, etc.) 02/08/2024 03:03 AM Actions
6419 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal Logical Nodes for SLD/Topology Aware Functions 02/09/2024 04:55 AM Actions
5966 IEC TC57 WG10 Future Work WG10 Future Work EDF New Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 02/09/2024 04:02 AM Actions
6358 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850

IEC 61850-7-4 list of abbreviations 10/26/2023 04:56 AM Actions
6700 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

Investigate to align to the new CIM model of transformers 02/08/2024 05:26 AM Actions
6613 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-6

IEC61850 Tissue 1833: Service SettingGroups.ConfSG clarification 02/08/2024 01:38 AM Actions
6579 IEC TC57 WG10 Future Work WG10 Future Work Vattenfall New High

IEC 61850-6

How to add utility process name to DOs 02/19/2024 10:43 AM Actions
6430 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low

IEC 61850-6

Management of SCL File Sizes (Compression Techniques, Handling of Privates) 02/08/2024 03:17 AM Actions
6428 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Urgent

IEC 61850-6

Next Steps with IEC 61850-90-11 (Publish versus Corrigenda) 10/26/2023 02:47 AM Actions
6319 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

maxAttributes - conflicting requirements between GOOSE and reporting 10/26/2023 04:58 AM Actions
6316 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 10/26/2023 04:58 AM Actions
6265 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-6

track changes in SCL to know when a device needs to be updated based on new SCD version 02/19/2024 10:56 AM Actions
6185 IEC TC57 WG10 Future Work WG10 Future Work 2022 IOP New Normal

IEC 61850-6

SCL Need to differentiate the difference in the number of GOOSE vs R-GOOSE 10/26/2023 05:01 AM Actions
6144 IEC TC57 WG10 Future Work WG10 Future Work IOP 2022 New Normal

IEC 61850-6

Need to add SCL mechanism to define a minimum MinTime 10/26/2023 05:21 AM Actions
5939 IEC TC57 WG10 Future Work WG10 Future Work RTE New Normal

IEC 61850-6

Mapping of another phases system description to the generic phases phsA, phsB, phsC 02/08/2024 04:43 AM Actions
5932 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R2 New Normal

IEC 61850-6

CIM-61850 Harmonization - Extend list of equipment type codes 02/08/2024 05:07 AM Actions
5931 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R3 New Normal

IEC 61850-6

CIM-61850 Harmonization - Add string attribute psrType to tPowerSystemResource. 02/08/2024 05:08 AM Actions
5930 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R6 New Normal

IEC 61850-6

CIM-61850 Harmonization - mRID attribute in SCL for Equipment, Terminals, ConnectivitNodes 02/08/2024 05:08 AM Actions
5929 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R8 New Normal

IEC 61850-6

CIM-61850 Harmonization - allow Terminals with no connections - use explicit ConnectivityNode.name = None 02/08/2024 05:08 AM Actions
5928 IEC TC57 WG10 Future Work WG10 Future Work IEC 62361-102 R9 New Normal

IEC 61850-6

CIM-61850 Harmonization - extend tPhaseEnum to match CIM PhaseCode 02/08/2024 05:23 AM Actions
5104 IEC TC57 WG10 Future Work WG10 Future Work WG 17 New Normal

IEC 61850-6

Add a type code 'INV' 02/08/2024 05:14 AM Actions
6410 IEC TC57 WG10 Future Work WG10 Future Work UCA Test. Committee New Normal

IEC 61850-7-2

SBOns to be deprecated in future. 10/26/2023 04:42 AM Actions
5964 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-2

Incorrect Attribute type of TrgOp 02/08/2024 04:24 AM Actions
5121 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-2

sFt2ab does not verify that the LastModified value is consistent or changes when file is modified 02/08/2024 05:18 AM Actions
6578 IEC TC57 WG10 Future Work WG10 Future Work TF 61850-80-6 New Normal

IEC 61850-7-2; IEC 61850-8-1, 80-6

Extension of the AddCause required to reflect communication issues in multi level control 02/08/2024 01:50 AM Actions
6701 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-3

Integration of proposed and canceled amendment 2 of part 7-3 02/08/2024 05:25 AM Actions
6412 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal

IEC 61850-7-3

Improved SCL Modelling of Function Inputs (InRef/ExtRef) 10/26/2023 04:41 AM Actions
6156 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-3

https://iec61850.tissue-db.com/tissue/1748 Arrays of CDC 10/26/2023 05:15 AM Actions
6151 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-3

Use and configuration of ORG within the scope of InRef 7 BlkRef 10/26/2023 05:20 AM Actions
5935 IEC TC57 WG10 Future Work WG10 Future Work MH New Normal

IEC 61850-7-3

Extension of CDC ASG 02/08/2024 04:51 AM Actions
5310 IEC TC57 WG10 Future Work WG10 Future Work WG 18 New Normal

IEC 61850-7-3

New CDC for IEC/TC 57/WG 18 02/08/2024 05:19 AM Actions
5103 IEC TC57 WG10 Future Work WG10 Future Work IEEE H27 New Normal

IEC 61850-7-3

Modified/new CDC for IEEE H27 02/09/2024 03:21 AM Actions
6604 IEC TC57 WG10 Future Work WG10 Future Work TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1754 Event driven schedules - Type of InSyn missing 02/08/2024 01:42 AM Actions
6561 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Modeling of primary equipment 10/26/2023 04:20 AM Actions
6524 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/670 - enable/disable LN via setting / new DO SetMod 10/26/2023 03:54 AM Actions
6220 IEC TC57 WG10 Future Work WG10 Future Work New Normal

IEC 61850-7-4

Parameters not available in standardized GAPC LN - opDITmms, DITmms 10/26/2023 05:00 AM Actions
6164 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1825 - Permission mode for control/setting of a scheduled entity from a client 10/26/2023 05:03 AM Actions
6158 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1760 - OMulti for MMET data objects 10/26/2023 05:14 AM Actions
6154 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1698 AnOut in GAPC 10/26/2023 05:19 AM Actions
6153 IEC TC57 WG10 Future Work WG10 Future Work Tissue DB New Normal

IEC 61850-7-4

https://iec61850.tissue-db.com/tissue/1691 Contradictory statement for Mod.stVal 10/26/2023 05:19 AM Actions
(1701-1800/2212) Per page: 25, 50, 100