WG10 Future Work #6143
Update the Switchgear / Breaker Model
Status:
New
Priority:
High
Assignee:
-
Start date:
09/29/2022
Due date:
% Done:
0%
Estimated time:
Source:
TF Unique ID:
WG10 Proposal:
Discuss in Upcoming Meeting:
No
Short Proposal:
Standard(s):
Needs More Information:
No
Assigned TF:
Target edition:
Description
There exist the LNs XCBR/XSWI ("operative model") and the "supervision" LNs SCBR and SOPM. In addition, there are trip and control circuits. The number of instances needed depends on the switchgear technology (single phase switching/tripping and three phase control/tripping). The DOs in the LNs are not always in line with allocated tasks of the LNs. Therefore, a careful consistent and comprehensive remodeling is needed.
Related issues
Updated by Christoph Brunner about 1 year ago
- Source set to WG WS Future
- Standard(s) set to IEC 61850-7-500
Updated by Tom Berry about 1 year ago
Note that the 90-3 team is also working on models for supervision of switch-gear
Updated by Vladan Cvejic 4 months ago
- Copied to IEC61850-7-5 #6377: Update the Switchgear / Breaker Model added
Updated by Vladan Cvejic 3 months ago
- Tracker changed from WG10FutureWork to WG10 Future Work
- Source deleted (
WG WS Future) - WG10 Proposal deleted (
Allocate to TF 7-5 / 7-500) - Discuss in Upcoming Meeting deleted (
No) - Proposal descriptions updated (diff)
- Standard(s) deleted (
IEC 61850-7-500)
Updated by Vladan Cvejic 3 months ago
- Discuss in Upcoming Meeting set to No
- Needs More Information set to No