WG10FutureWork #6143
Update the Switchgear / Breaker Model
Status:
In Progress
Priority:
High
Assignee:
-
Start date:
09/29/2022
Due date:
% Done:
0%
Estimated time:
Source:
WG WS Future
TF Unique ID:
WG10 Proposal:
Allocate to TF 7-5 / 7-500
Discuss in Upcoming Meeting:
No
Short Proposal:
Standard(s):
IEC 61850-7-500
Needs More Information:
Description
There exist the LNs XCBR/XSWI ("operative model") and the "supervision" LNs SCBR and SOPM. In addition, there are trip and control circuits. The number of instances needed depends on the switchgear technology (single phase switching/tripping and three phase control/tripping). The DOs in the LNs are not always in line with allocated tasks of the LNs. Therefore, a careful consistent and comprehensive remodeling is needed.
Proposal descriptions
TF 7-5/7-500 started working on it
Updated by Christoph Brunner 6 months ago
- Source set to WG WS Future
- Standard(s) set to IEC 61850-7-500