Project

General

Profile

WG10 Future Work #6143

Update the Switchgear / Breaker Model

Added by Christoph Brunner about 2 years ago. Updated about 1 year ago.

Status:
New
Priority:
High
Assignee:
-
Start date:
09/29/2022
Due date:
% Done:

0%

Estimated time:
Source:
TF Unique ID:
WG10 Proposal:
Discuss in Upcoming Meeting:
No
Short Proposal:
Standard(s):

TR IEC 61850-7-500, TR IEC 61850-90-3

Needs More Information:
No
Assigned TF:
61850-7-500 Ed2, 61850-90-3- conditioned maintenance
Target edition:
Future

Description

There exist the LNs XCBR/XSWI ("operative model") and the "supervision" LNs SCBR and SOPM. In addition, there are trip and control circuits. The number of instances needed depends on the switchgear technology (single phase switching/tripping and three phase control/tripping). The DOs in the LNs are not always in line with allocated tasks of the LNs. Therefore, a careful consistent and comprehensive remodeling is needed.


Related issues

Copied to 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6377: Update the Switchgear / Breaker ModelNew09/29/2022

Actions

Also available in: Atom PDF