Christoph Brunner
- Login: christoph.brunner@it4power.com
- Registered on: 10/10/2021
- Last connection: 02/08/2024
Issues
open | closed | Total | |
---|---|---|---|
Assigned issues | 4 | 0 | 4 |
Reported issues | 1 | 0 | 1 |
Projects
Project | Roles | Registered on |
---|---|---|
61850-7-5 and 61850-7-500 | Developer | 06/14/2023 |
IEC TC57 WG10 Future Work | WG10 Future Work Manager | 10/10/2021 |
IEC 61850 User Feedback Task Force | Reporter | 02/01/2022 |
Activity
09/29/2022
- 09:43 AM IEC TC57 WG10 Future Work WG10 Future Work #6143 (In Progress): Update the Switchgear / Breaker Model
- 09:19 AM IEC TC57 WG10 Future Work WG10 Future Work #6143 (New): Update the Switchgear / Breaker Model
- There exist the LNs XCBR/XSWI ("operative model") and the "supervision" LNs SCBR and SOPM. In addition, there are tri...
Also available in: Atom