WG10FutureWork #6143

Update the Switchgear / Breaker Model

Added by Christoph Brunner 4 months ago. Updated 4 months ago.

Status:
In Progress
Priority:
High
Assignee:
-
Start date:
09/29/2022
Due date:
% Done:

0%

Estimated time:
Source:
WG WS Future
TF Unique ID:
WG10 Proposal:

Allocate to TF 7-5 / 7-500

Discuss in Upcoming Meeting:
No
Short Proposal:
Standard(s):

IEC 61850-7-500

Needs More Information:

Description

There exist the LNs XCBR/XSWI ("operative model") and the "supervision" LNs SCBR and SOPM. In addition, there are trip and control circuits. The number of instances needed depends on the switchgear technology (single phase switching/tripping and three phase control/tripping). The DOs in the LNs are not always in line with allocated tasks of the LNs. Therefore, a careful consistent and comprehensive remodeling is needed.


Proposal descriptions

TF 7-5/7-500 started working on it