404 IEC 61850 User Feedback Task Force Feature 2.1 ENTSO-E Closed Normal Meaning of "optional" regarding data model 02/11/2021 06:21 AM Actions
521 IEC 61850 User Feedback Task Force Feature 2 IOP_2017/3 Closed Normal

IEC 61850-8-1

The GSEControl has a datSet element indicating that the gocb is configured (but with no communication entry) 06/21/2022 09:24 AM Actions
600 IEC 61850 User Feedback Task Force Feature 1947 IOP_2019 Closed Normal

IEC 61850-7-1

Connect the ExtRef - different supported mechanisms by ICT 06/21/2022 09:29 AM Actions
591 IEC 61850 User Feedback Task Force Feature 1857 IOP_2019 Closed Normal

IEC 61850-6

A reservation could not be made via SCL for an IED’s report due to the lack of a ConnectedAP associated with the client’s AP 07/05/2022 08:34 AM Actions
596 IEC 61850 User Feedback Task Force Feature 1710 IOP_2019 Closed Normal An IED declares constraints that are not machine processable 02/11/2021 06:43 AM Actions
589 IEC 61850 User Feedback Task Force Feature 1700 IOP_2019 Closed Normal

IEC 61850-6

Usage of max of RptEnabled when indexed attribute is false and the relationship to RptEnabled 07/05/2022 08:28 AM Actions
595 IEC 61850 User Feedback Task Force Feature 1642_04 IOP_2019 Closed Normal

IEC 61850-7-1

How does the SCT know whether to configure the LSVS.SvCBRef (if it is not configured)? 06/21/2022 09:29 AM Actions
594 IEC 61850 User Feedback Task Force Feature 1642_01 IOP_2019 Closed Normal

IEC 61850-6

Reverse engineering of subscription is not possible when Server and ServerAt APs are connected to the same SubNetwork 06/21/2022 09:29 AM Actions
593 IEC 61850 User Feedback Task Force Feature 1601 IOP_2019 Closed Normal

IEC 61850-6

How to disable SV control blocks that are not in use? 06/21/2022 09:29 AM Actions
588 IEC 61850 User Feedback Task Force Feature 1548 IOP_2019 Closed Normal

IEC 61850-6

More than one redundant PhysConn for ConnectedAP of IED AP and no redundant PhysConn on same AP 06/21/2022 09:28 AM Actions
534 IEC 61850 User Feedback Task Force Feature 15 IOP_2017/24 Closed Normal

IEC 61850-6, IEC 61850-7-2

A GCB or MSVCB can only have one single control block address entry in the whole communication section 06/21/2022 09:24 AM Actions
587 IEC 61850 User Feedback Task Force Feature 1404 IOP_2019 Closed Normal

IEC 61850-6

LNodeTypes and DOTypes not used in the IED section - is it allowed to keep them in DataTypeTemplate section? 02/11/2021 07:01 AM Actions
457 IEC 61850 User Feedback Task Force Feature 14 IOP_2013 Closed Normal

IEC 61850-6

A SCL file is created without maxAttributes attribute defined. What does it mean semantically it the attr. is missing? 02/11/2021 07:46 AM Actions
586 IEC 61850 User Feedback Task Force Feature 1340 IOP_2019 Closed Normal

IEC 61850-6

Client application cannot connect to IED that are having issue with format of AP-Title 07/05/2022 08:26 AM Actions
585 IEC 61850 User Feedback Task Force Feature 1337 IOP_2019 Closed Normal

IEC 61850-6

SCT unable to configure the device to communicate on multiple subnets due to having a single AP (with all Eth. Ports) 07/05/2022 08:24 AM Actions
532 IEC 61850 User Feedback Task Force Feature 13 IOP_2017/22 Closed Normal

IEC 61850-7-2

An implementation do not allow BRCB resvTms to be written while rptEnable is True 06/21/2022 09:24 AM Actions
531 IEC 61850 User Feedback Task Force Feature 12 IOP_2017/21 Closed Normal

IEC 61850-8-1, IEC 61850-9-2

Merging Unit is not capable to publish SV outside of the recommended destination MAC address range (even though 8-1 is informative) 06/21/2022 09:24 AM Actions
455 IEC 61850 User Feedback Task Force Feature 12 IOP_2013 Closed Normal How does a SCT know the maximum number of instantiated RCBs allowed in an IED and what the allowed distribution per RCB? 02/11/2021 07:47 AM Actions
584 IEC 61850 User Feedback Task Force Feature 1122 IOP_2019 Closed Normal

IEC 61850-6

SCL validation - Should all name parts of PhV be contained in the doName? 05/09/2023 09:12 AM Actions
530 IEC 61850 User Feedback Task Force Feature 11 IOP_2017/20 Closed Normal

IEC 61850-6

SCT is passing ICD errors to SCD. 06/21/2022 09:24 AM Actions
529 IEC 61850 User Feedback Task Force Feature 10 IOP_2017/16 Closed Normal

IEC 61850-6

SCT imports ICD with SGCB, and the settings with FC= SP outside this setting group are changed to FC=SE in the exported DOType part 06/21/2022 09:24 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
494 IEC 61850 User Feedback Task Force Support 9 IOP_2015 Closed Normal

6

DUSTIN: Issue 1: X/Y Coordinates Upon exchanging the SCD file between SCT tools, the drawing/visualization of the single line d 06/21/2022 09:12 AM Actions
417 IEC 61850 User Feedback Task Force Support 9 ENTSO-E Closed Normal

6-100

There is no mechanism proposed by the Standard to positively identify data points in the data model. For instance PTOC can refer 12/06/2022 09:01 AM Actions
527 IEC 61850 User Feedback Task Force Support 8 IOP_2017/10 Closed Normal Regarding the Network infrastructure: Some MU/SAMU cannot configure their SV stream to different VLAN ID , fixed to 0 (but can c 06/21/2022 09:13 AM Actions
493 IEC 61850 User Feedback Task Force Support 8 IOP_2015 Closed Normal

6

An icd/iid file is not required to include the “original SCL” element. Is it required to be added to the IED instance in the SCD 06/21/2022 09:12 AM Actions
416 IEC 61850 User Feedback Task Force Support 8 ENTSO-E Closed Normal

IEC 61850-6

Implementation and integration software of different manufacturers should have same mandatory tasks in order to be used as tools 02/11/2021 08:00 AM Actions
415 IEC 61850 User Feedback Task Force Support 7.1 ENTSO-E Closed Normal

IEC 61850-7-2

Standard is written in general opinion that Ethernet is fully capable to carry all its tasks 02/11/2021 08:01 AM Actions
492 IEC 61850 User Feedback Task Force Support 7 IOP_2015 Closed Normal

6

(a) If a device does not support configuration of the ctlModel for a specific DO – what is the correct way to declare this? • De 06/21/2022 09:12 AM Actions
414 IEC 61850 User Feedback Task Force Support 6.2 ENTSO-E Closed Normal SCD from system integrator not containing comprehensive substation section 02/03/2021 02:42 PM Actions
491 IEC 61850 User Feedback Task Force Support 6 IOP_2015 Closed Normal

6

Declaration of CtlModel for controllable CDCs (a) If a device does not support configuration of the ctlModel for a specific DO – 06/21/2022 09:11 AM Actions
413 IEC 61850 User Feedback Task Force Support 6 ENTSO-E Closed Normal Substation part in SCL is mostly non existing in manufacturers scd export files and in form that is defined as in Standard. Subs 02/03/2021 02:42 PM Actions
583 IEC 61850 User Feedback Task Force Support 55 ENTSO-E Closed Normal

IEC 61850-7-4

Autoreclosure: Autoreclosure - 3ph closing command missing 12/06/2022 09:38 AM Actions
582 IEC 61850 User Feedback Task Force Support 54 ENTSO-E Closed Normal

IEC 61850-7-4, 7-5

Synchrocheck: Synchrocheck - missing signals 12/06/2022 09:37 AM Actions
581 IEC 61850 User Feedback Task Force Support 53 ENTSO-E Closed Normal

IEC 61850-7-4, 7-5

S/S related applications: Disturbance recorder - communication session active 12/06/2022 09:37 AM Actions
524 IEC 61850 User Feedback Task Force Support 5 IOP_2017/7 Closed Normal

1-Aug

The use of the Simulation bit in the R-GOOSE Payload is not clearly defined. It refers only to 8-1 which currently only specifie 06/21/2022 09:13 AM Actions
490 IEC 61850 User Feedback Task Force Support 5 IOP_2015 Closed Normal

6

In the service section, an IED can declare “modify dataset” to be FALSE. That means, datasets in the IED cannot be changed by th 06/21/2022 09:11 AM Actions