Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
630 IEC 61850 User Feedback Task Force Improvement 43 RTE Resolved Normal

IEC 61850-7-500

XCBR LN new DO to describe withdrawable circuit breaker 05/09/2023 09:32 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 05/09/2023 09:32 AM Actions
624 IEC 61850 User Feedback Task Force Support 21 RTE Resolved Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 05/09/2023 09:32 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
618 IEC 61850 User Feedback Task Force Improvement 14 RTE Resolved Normal

IEC 61850-90-3

Evolution of DO SumSqA of LN SPTRExt 05/09/2023 09:32 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
610 IEC 61850 User Feedback Task Force Improvement 2 RTE Resolved Normal

IEC 61850-6

Mapping of another phases system description to the generic phases phsA, phsB, phsC 05/09/2023 09:32 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
6631 SCL Tooling Issues Resolved Normal tTf1 (mustUnderstand) for the ICT test needs clarification 01/09/2024 08:59 AM Actions
6617 SCL Tooling Issues Resolved Normal tIieN1 - can a popup warning be considered as 'not allowed' 12/12/2023 08:58 AM Actions
6327 SCL Tooling Issues Resolved Normal tTf2 - export CID file only for Ed2.1? 05/16/2023 08:20 AM Actions
6326 SCL Tooling Issues Resolved Normal tIie1 - remove step 10-14 to undo previous changes 05/16/2023 08:09 AM Actions
6325 SCL Tooling Issues Resolved Normal PIXIT missing entries on tIie1 "when supported" 05/16/2023 08:04 AM Actions
6323 SCL Tooling Issues Resolved Normal tTtf5 IED name=None is not allowed tissue #1365 05/02/2023 08:20 AM Actions
6200 SCL Tooling Issues Resolved Normal tTf1 change Ed2/2007B to Ed2.1/2007B4 01/24/2023 08:33 AM Actions
5926 SCL Tooling Issues Resolved Normal Review ICT TP 11/29/2022 07:23 AM Actions
5120 SCL Tooling Issues Resolved Normal LGOS/LSVS reference with functional naming (SCL) 08/09/2022 08:40 AM Actions
6749 Server Issues Resolved High Clarification of ExtRef attributes usage - TISSUE 1818 04/16/2024 08:31 AM Actions
6750 Server Issues Resolved High sAddr length - TISSUE 1885 04/16/2024 08:17 AM Actions
6710 Server Issues Resolved Normal sSrv13 does not specify that the lower hierarchy Mod.stVal shall not change 04/02/2024 02:42 PM Actions
6697 Server Issues Resolved Normal sRpN9 does not specify the expected access error by negative response on SetURCBValues 04/02/2024 08:40 AM Actions
6483 Server Issues Resolved Normal Need to be able to test 61850-7-420 09/05/2023 08:14 AM Actions
5347 Server Issues Resolved Normal How should time correlated GOOSE change status in GOOSE Performance test 10/04/2022 09:11 AM Actions
748 Server Issues Resolved Normal sGos9 use SPS when INS subscribe is not supported 07/27/2021 10:07 AM Actions
6726 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/29/2024 09:07 AM Actions
6725 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 02/29/2024 09:07 AM Actions
6711 61850-7-5 and 61850-7-500 IEC61850-7-5 WG10 Fall workshop In Progress Low SCL Modelling of Fault Measurements (RFMX) 02/29/2024 08:33 AM Actions
6499 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Explanation text on the application of check conditions 10/05/2023 08:57 AM Actions
6500 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Parameters to enforce the checking of interlocking and synchronism 10/05/2023 08:57 AM Actions
6378 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 1/8 10/05/2023 08:56 AM Actions
6393 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 7/8 10/05/2023 08:55 AM Actions
6392 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 6/8 10/05/2023 08:55 AM Actions
6391 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 5/8 10/05/2023 08:55 AM Actions
6390 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 4/8 10/05/2023 08:55 AM Actions
6389 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 3/8 10/05/2023 08:55 AM Actions
6388 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 2/8 10/05/2023 08:55 AM Actions
6394 61850-7-5 and 61850-7-500 IEC61850-7-5 In Progress Normal Clarifications on the local/remote concept 8/8 09/14/2023 08:04 AM Actions
(1751-1800/2165) Per page: 25, 50, 100

Also available in: Atom CSV PDF