Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
505 IEC 61850 User Feedback Task Force Support 20 IOP_2015 Closed Normal

6

Statement: an SCT A export an SED file with engineering rights “fix” and expectation was SCT B could add Goose clients after imp 06/21/2022 09:12 AM Actions
506 IEC 61850 User Feedback Task Force Support 21 IOP_2015 Closed Normal

6

Issue 1: Content of CID with GOOSE Subscriptions During testing we noticed some CID files contained a single IED, whereas others 06/21/2022 09:12 AM Actions
507 IEC 61850 User Feedback Task Force Support 22 IOP_2015 Closed Normal If the client reads a SCD file and loads then the data model (or vice versa ???) what data shall a client compare? confRef’s, da 06/21/2022 09:10 AM Actions
508 IEC 61850 User Feedback Task Force Support 23 IOP_2015 Closed Normal

IEC 61850-7-2

RptID attribute of a ReportControl section in SCL is optional, as stated in IEC 61850-6. IEC 61850-8-1 states to send RCB objec 06/21/2022 09:12 AM Actions
509 IEC 61850 User Feedback Task Force Support 24 IOP_2015 Closed Normal

IEC 61850-7-2

1. Report Control Block is disabled and four events (four reports) are generated2. Client sends MMS Write RptEna=true to the BR 06/21/2022 09:12 AM Actions
510 IEC 61850 User Feedback Task Force Support 25 IOP_2015 Closed Normal

IEC 61850-7-4

For the latest TISSUE 1361 for Ed2.0 (statement in the attachment), there are two things to be clarified:1. The statement: Swit 06/21/2022 09:12 AM Actions
511 IEC 61850 User Feedback Task Force Support 26 IOP_2015 Closed Normal

2-Sep

The Quality bits alignment in 9-2LE seems different from 8-1 quality bits with ASN.1. So it caused confusion that which bit shou 06/21/2022 09:12 AM Actions
512 IEC 61850 User Feedback Task Force Support 27 IOP_2015 Closed Normal

90-4

Testing unconfigured VLAN, there is a question of how VLAN tags (e.g. 20) should be handled by the HSR ring. However, what sho 06/21/2022 09:12 AM Actions
513 IEC 61850 User Feedback Task Force Support 28 IOP_2015 Closed Normal

90-4

HSR and PRP are redundancy protocols. In order to prevent a single point of failure, many people are considering 2 red boxes 06/21/2022 09:09 AM Actions
514 IEC 61850 User Feedback Task Force Support 29 IOP_2015 Closed Normal Priority of error checking in controls – i.e. position-reached instead of Blocked-by-switching-hierarchy. The order of checks i 06/21/2022 09:12 AM Actions
515 IEC 61850 User Feedback Task Force Support 31 IOP_2015 Closed Normal These test cases assume that a server will send a negative response to an operate to the same value. Some servers will accept th 06/21/2022 09:12 AM Actions
516 IEC 61850 User Feedback Task Force Support 32 IOP_2015 Closed Normal Buffered reporting testing – anomaly with resynch (write of entryId failed, but buffered reports still sent). Because of indexe 06/21/2022 09:12 AM Actions
517 IEC 61850 User Feedback Task Force Support 33 IOP_2015 Closed Normal IEC 61850-9-3 slaves can by design lock themselves to IEEE C37.238 (Power Profile) masters. This is intended behavior, since IEC 06/21/2022 09:12 AM Actions
518 IEC 61850 User Feedback Task Force Support 34 IOP_2015 Closed Normal Does the SVID character have to be specifically mentioned to be within 10-34 characters? Some of the vendors have implemented th 06/21/2022 09:12 AM Actions
520 IEC 61850 User Feedback Task Force Support 1 IOP_2017/1 Closed Normal IEC 61850-6 leaves the definition of the meaning of the authentication options to the SCSM. However, neither 8-1 nor IEC 62351-6 06/21/2022 09:13 AM Actions
521 IEC 61850 User Feedback Task Force Feature 2 IOP_2017/3 Closed Normal

IEC 61850-8-1

The GSEControl has a datSet element indicating that the gocb is configured (but with no communication entry) 06/21/2022 09:24 AM Actions
522 IEC 61850 User Feedback Task Force Feature 3 IOP_2017/5 Closed Normal

IEC 61850-6

SCD file has “originalSclVersion=2007” for all IED, including Ed1 devices 06/21/2022 09:24 AM Actions
523 IEC 61850 User Feedback Task Force Support 4 IOP_2017/6 Closed Normal

IEC 61850-6

The R-GOOSE test area SCD was created by importing an ICD that was of schema 2007 B3. It exported 2007 B2 without removing/down 06/21/2022 09:16 AM Actions
524 IEC 61850 User Feedback Task Force Support 5 IOP_2017/7 Closed Normal

1-Aug

The use of the Simulation bit in the R-GOOSE Payload is not clearly defined. It refers only to 8-1 which currently only specifie 06/21/2022 09:13 AM Actions
526 IEC 61850 User Feedback Task Force Feature 7 IOP_2017/9 Closed Normal

IEC 61850-6

Definition of a data set must contain a data object name but SCL does not require the doName attribute in the <FCDA/> element 06/21/2022 09:24 AM Actions
527 IEC 61850 User Feedback Task Force Support 8 IOP_2017/10 Closed Normal Regarding the Network infrastructure: Some MU/SAMU cannot configure their SV stream to different VLAN ID , fixed to 0 (but can c 06/21/2022 09:13 AM Actions
528 IEC 61850 User Feedback Task Force Feature 9 IOP_2017/15 Closed Normal

IEC 61850-6

SCD files have type defined where bType does not equal Enum or Struct, which does not follow the IEC 61850-6 description 06/21/2022 09:24 AM Actions
529 IEC 61850 User Feedback Task Force Feature 10 IOP_2017/16 Closed Normal

IEC 61850-6

SCT imports ICD with SGCB, and the settings with FC= SP outside this setting group are changed to FC=SE in the exported DOType part 06/21/2022 09:24 AM Actions
530 IEC 61850 User Feedback Task Force Feature 11 IOP_2017/20 Closed Normal

IEC 61850-6

SCT is passing ICD errors to SCD. 06/21/2022 09:24 AM Actions
531 IEC 61850 User Feedback Task Force Feature 12 IOP_2017/21 Closed Normal

IEC 61850-8-1, IEC 61850-9-2

Merging Unit is not capable to publish SV outside of the recommended destination MAC address range (even though 8-1 is informative) 06/21/2022 09:24 AM Actions
532 IEC 61850 User Feedback Task Force Feature 13 IOP_2017/22 Closed Normal

IEC 61850-7-2

An implementation do not allow BRCB resvTms to be written while rptEnable is True 06/21/2022 09:24 AM Actions
533 IEC 61850 User Feedback Task Force Support 14 IOP_2017/23 Closed Normal MSVID shall be unique. The integrated application SCD file allowed duplicate SVID’s for two merging units. 06/21/2022 09:13 AM Actions
534 IEC 61850 User Feedback Task Force Feature 15 IOP_2017/24 Closed Normal

IEC 61850-6, IEC 61850-7-2

A GCB or MSVCB can only have one single control block address entry in the whole communication section 06/21/2022 09:24 AM Actions
535 IEC 61850 User Feedback Task Force Support 16 IOP_2017/25 Closed Normal

6

SCD file removed unconfigured GOOSE control block but did not remove the Connected AP section contained GSE information. 06/21/2022 09:13 AM Actions
536 IEC 61850 User Feedback Task Force Support 17 IOP_2017/26 Closed Normal SCT did not import GOOSE and 3 of the sampled value control blocks that existed in PMU ICD file. This caused validation failures 06/21/2022 09:13 AM Actions
537 IEC 61850 User Feedback Task Force Support 18 IOP_2017/27 Closed Normal

IEC 61850-7-2, 8-1, 8-2

Server is not responding to some of the MMS requests. (see below) What should the client do this case? 06/21/2022 09:24 AM Actions
538 IEC 61850 User Feedback Task Force Support 19 IOP_2017/29 Closed Normal

IEC 61850-6

SCT engineering problems 06/21/2022 09:24 AM Actions
539 IEC 61850 User Feedback Task Force Support 20 IOP_2017/34 Closed Normal

IEC 61850-6

Relation between GCB instances in scd to the related LGOS 06/21/2022 09:24 AM Actions
540 IEC 61850 User Feedback Task Force Feature 21 IOP_2017/35 Closed Normal

IEC 61850-6

Some SCT tools are removing incomplete Inputs with ExtRef’s of serviceType=”SMV” that are used for late binding of sample values 06/21/2022 09:24 AM Actions
541 IEC 61850 User Feedback Task Force Support 22 IOP_2017/36 Closed Normal

IEC 61850-9-2(LE), IEC 61869-9

APPID rules for backward compatible variants (9-2LE) shall be noted in IEC 61869-9 06/21/2022 09:24 AM Actions
542 IEC 61850 User Feedback Task Force Feature 23 IOP_2017/38 Closed Normal

IEC 61850-6

Problem in engineering workflow due to definition of SMVsc.max 06/21/2022 09:24 AM Actions
543 IEC 61850 User Feedback Task Force Feature 24 IOP_2017/40 Closed Normal

IEC 61850-8-1

Operability issues between vendors that prevent R-SV testing between substations 02/11/2021 07:20 AM Actions
544 IEC 61850 User Feedback Task Force Feature 25 IOP_2017/44 Closed Normal

IEC 61850-7-5

TestBlock condition implemented only in XCBR and not in any of Rxxx and Pxxx logical node 02/11/2021 07:19 AM Actions
545 IEC 61850 User Feedback Task Force Feature 26 IOP_2017/46 Closed Normal

IEC 61850-6-2

SLD visualization issues in SCL 06/21/2022 09:24 AM Actions
546 IEC 61850 User Feedback Task Force Feature 27 IOP_2017/47 Closed Normal

IEC 61850-6 §10 annex G

Different level of expectations between the ICT and SCT 02/11/2021 07:16 AM Actions
557 IEC 61850 User Feedback Task Force Feature 29 ENTSO-E Closed Normal

IEC 61850-7-4

Lockout functionality: how to model by different protection functions? 02/11/2021 06:05 AM Actions
558 IEC 61850 User Feedback Task Force Support 30 ENTSO-E Closed Normal

IEC 61850-7-4

Busbar protection (BBP): Diff/Kirchoff BBP 12/06/2022 09:02 AM Actions
559 IEC 61850 User Feedback Task Force Support 31 ENTSO-E Closed Normal

IEC 61850-7-4

Busbar protection: ARC detection protection 12/06/2022 09:02 AM Actions
560 IEC 61850 User Feedback Task Force Support 32 ENTSO-E Closed Normal

IEC 61850-7-4

Busbar protection: Simplified logic 02/11/2021 07:02 AM Actions
561 IEC 61850 User Feedback Task Force Support 33 ENTSO-E Closed Normal

IEC 61850-7-500

Pole discrepancy: no LN to cover Trip and pole disc 02/11/2021 06:53 AM Actions
562 IEC 61850 User Feedback Task Force Support 34 ENTSO-E Closed Normal

IEC 61850-7-4

Transformer diff. protection: Restricted earthfault protection 02/11/2021 07:02 AM Actions
563 IEC 61850 User Feedback Task Force Support 35 ENTSO-E Closed Normal

IEC 61850-7-4

Transformer diff. protection: Protection blocked by harmonics 02/11/2021 07:01 AM Actions
564 IEC 61850 User Feedback Task Force Support 36 ENTSO-E Closed Normal

IEC 61850-90-6

S/S related applications: Auxiliary transfer 02/11/2021 07:01 AM Actions
565 IEC 61850 User Feedback Task Force Support 37 ENTSO-E Closed Normal

IEC 61850-7-4/90-3

S/S related applications: DC battery model and converter/charger/rectifier alarms 02/11/2021 07:00 AM Actions
566 IEC 61850 User Feedback Task Force Support 38 ENTSO-E Closed Normal

IEC 61850-7-420

S/S related applications: Diesel aggregat alarm 12/06/2022 09:35 AM Actions
(101-150/1448) Per page: 25, 50, 100