Project

General

Profile

Support #509

1. Report Control Block is disabled and four events (four reports) are generated2. Client sends MMS Write RptEna=true to the BR

Added by Herbert Falk about 3 years ago. Updated almost 2 years ago.

Status:
Closed
Priority:
Normal
Assignee:
-
Category:
-
Start date:
Due date:
% Done:

0%

Estimated time:
ID:
24
Source:
IOP_2015
TF Unique ID:
24 # IOP_2015
WG10 Proposal:

Including in 2.1 amendment part 7-2 (17.2.2.1)Tissue 1454

Estimated Completion:
Discuss in Upcoming Meeting:
No
To discuss in WG10:
No
Short Proposal:
Standard(s):

IEC 61850-7-2

Needs More Information:
Assigned TF:

Description

1. Report Control Block is disabled and four events (four reports) are generated
2. Client sends MMS Write RptEna=true to the BRCB
3. Server sends the four InformationReport
4. Server sends the MMS Write success to the MMS Write RptEna=true request
5. Client ignores the four InformationReport because they were received before receiving the confirmation of the MMS Write RptEna=true operation
Should the standard clarify that this is a valid situation so the client should accept the InformationReport received before the confirmation to the Write operation?

#1

Updated by Vladan Cvejic almost 2 years ago

  • Subject changed from 1. Report Control Block is disabled and four events (four reports) are generated 2. Client sends MMS Write RptEna=true to the BR to 1. Report Control Block is disabled and four events (four reports) are generated2. Client sends MMS Write RptEna=true to the BR
  • WG10 Proposal changed from Including in 2.1 amendment part 7-2 (17.2.2.1) Tissue 1454 to Including in 2.1 amendment part 7-2 (17.2.2.1)Tissue 1454
  • Discuss in Upcoming Meeting set to No
  • To discuss in WG10 set to No
  • Standard(s) changed from 2-Jul to IEC 61850-7-2
#2

Updated by Carlos Rodriguez del Castillo almost 2 years ago

  • Status changed from New to Closed

Confirm to IEC 61850-6 editor that this issue has been accounted for.

Also available in: Atom PDF