5961 Server Issues New Normal sCtl16 shall specify LocSta/MltLev to match with table B.1 09/07/2022 09:53 AM Actions
5960 General Testing Issues Improvement In Progress Normal Herb to review access control of test documents 09/20/2022 07:54 AM Actions
5959 Server Issues In Progress Normal sSvp3 remove random and allow synSourceID=TRUE for backwards compatible config 09/06/2022 08:36 AM Actions
5958 Server Issues In Progress Normal sTm2 allow a more accurate Time Accuracy as documented 09/06/2022 08:39 AM Actions
5957 Server Issues New Normal sRp16 should not reference TISSUE 1332, it was finalized as N/A 09/20/2022 08:00 AM Actions
5956 Server Issues New Normal sBr23 should not reference TISSUES 1467, 1477 which are finalized as N/A 09/20/2022 08:01 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF New Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 09/13/2022 09:03 AM Actions
5954 Server Issues Resolved Normal sGop10 detail test missing 09/06/2022 08:47 AM Actions
5953 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PCS-996 DISTURBANCE FAULT RECORDER ED2.0 Server 08/25/2022 07:04 AM Actions
5952 WG13 Issues CIM Issues In Progress Normal

61968-11

Clarification of how midnight is expressed in time-related CIM Compound classes 09/22/2022 02:21 PM Actions
5951 WG16 Issues CIM Issues Open Normal Add to all diagrams; "Reproduced with permission of UCAIug" 08/18/2022 01:49 PM Actions
5950 WG14 Part 9 Issues CIM Issues New Normal

61968-9, 61968-11

How is readCycle used, should the definition be updated? 08/18/2022 11:45 AM Actions
5949 IEC 61850 Certificate IEC 61850 Certificate Approved Normal e2TANGO-800 09/07/2022 10:04 AM Actions
5948 Server Issues Resolved Normal sSvp22 detail is missing in TP1.2 (editorial) 09/06/2022 08:48 AM Actions
5947 WG13 Issues CIM Issues In Progress Normal

61970-456

Description classes inherithing from IdentifiedObject 09/19/2022 02:50 PM Actions
5946 WG13 Issues CIM Issues In Progress High

61970-456

Association Terminal.TopologicalNode 09/22/2022 02:22 PM Actions
5945 WG13 Issues CIM Issues In Progress High DCSwitch does not have open flag 09/22/2022 02:22 PM Actions
5944 IEC TC57 WG10 Future Work WG10FutureWork RTE New Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 08/09/2022 08:17 AM Actions
5943 IEC TC57 WG10 Future Work WG10FutureWork RTE New Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 08/09/2022 08:17 AM Actions
5942 IEC TC57 WG10 Future Work WG10FutureWork RTE New Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 08/09/2022 08:16 AM Actions
5941 IEC TC57 WG10 Future Work WG10FutureWork TissueDB New Normal

IEC 61850-7-4

IEC61850.Tissue #1755 Event driven schedules – Add DO to stop schedule by event 08/09/2022 08:16 AM Actions
5940 IEC TC57 WG10 Future Work WG10FutureWork SCL IOP 2021 New Normal

IEC 61850-6

Multiple LNodes implemented by same LN 08/09/2022 08:15 AM Actions
5939 IEC TC57 WG10 Future Work WG10FutureWork RTE New Normal

IEC 61850-6

Mapping of another phases system description to the generic phases phsA, phsB, phsC 08/09/2022 08:14 AM Actions
5938 IEC TC57 WG10 Future Work WG10FutureWork RTE New Normal

IEC 61850-7-4

LN RADR evolution 08/09/2022 08:14 AM Actions
5937 IEC TC57 WG10 Future Work WG10FutureWork WG10 New Normal

IEC 61850-7-4

Report of current active setting group 08/09/2022 08:13 AM Actions