Project

General

Profile

IEC 61850 Certificate #7063

SA-OPD

Added by Herbert Falk 7 days ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2 Amd 1
61850 Tested Aspects:
Client
Company:
DONGWOO ELECTRIC CORP
Address:

34, Oseongseo-ro, Anjung-eup, Pyeongtaek-si, Gyeonggi-do, Republic of Korea, 17928

Product:
DWSA-OP
HW Version:
1.0/ HP Z2 Tower G9 Workstation
SW Version:
1.0/ Windows Server 2019
Key Words:
Test Procedure Version:

1.0

IEC 61850 Blocks Certified:
Basic Exchange (B1a), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), File Transfer (B14), GOOSE Control Block (9), SBO Control (12b), Service Tracking (B15), Setting Group (B4), Setting Group Definition (B4+), Time sync SNTP (B13a), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
Herbert Falk
Approval Date:
11/27/2024
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Testing Laboratory (A)
Certificate Name:
24-045122-01-3_DongWoo_DWSA-OP_Client_Ed2.1_Certification_KTL.pdf
Certificate Hash:
SHA256: 524D81E65FD49534D07C9078A7BBB828CE97A35FAF085BD307B964D5767EF65F
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
Yes
Serial Number:
DWSA-OP-2024-001
Publisher Legacy Variants:
-
Publisher Preferred Rates:
-
Publisher Preferred Variants:
Subscriber Legacy Variants:
-
Subscriber Preferred Variants:
Subscriber Preferred Rates:
-
Product Variants:
Time Activated Control:
No

Description

Substation Automation Operation Processing Device


Files


Related issues

Copied to IEC 61850 Certificate - IEC 61850 Certificate #7064: SA-OPDApprovedActions
#1

Updated by Herbert Falk 7 days ago

Also available in: Atom PDF