# Project Tracker ID Source Status Priority Standard(s) Subject Updated
5005 WG13 Issues CIM Issues In Progress High

61970-301

GroundDisconnector examplesThe intended use of GroundDisco 04/12/2023 11:17 AM Actions
5076 WG13 Issues CIM Issues In Progress High

61970-301, 61970-452, 61970-456

Convention and usage of operational limits of GeneratingUnit and injections 10/18/2023 11:03 AM Actions
6610 WG13 Issues CIM Issues New High

61970-301; 61970-452

Multiple issue Measurement and Control 11/27/2023 10:27 AM Actions
6680 WG13 Issues CIM Issues New High

61970-456

Support time series/schedule for SSH 01/17/2024 10:19 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
6579 IEC TC57 WG10 Future Work WG10 Future Work Vattenfall New High

IEC 61850-6

How to add utility process name to DOs 02/19/2024 10:43 AM Actions
632 IEC 61850 User Feedback Task Force Support 8 H30 Resolved High

IEC 61850-9-2, IEC 61869-9

APPID 0x4000 - Sampled Values 12/05/2023 09:16 AM Actions
6328 WG13 Issues CIM Issues New High

IEC 61970-301, IEC 61970-452, IEC 61070-600

Required usage of BusbarSection 02/07/2024 10:41 AM Actions
6663 WG13 Issues CIM Issues Open High

IEC 61970-456

The SSH profile needs to be revisited and updated for consistency. 02/04/2024 12:14 AM Actions
6267 CIM Joint Issues CIM Issues New High

IEC61968-11

Person and Organization Relationships 02/15/2023 09:31 AM Actions
6619 CIM Joint Issues CIM Issues New High

IEC61968-3 thru IEC61968-11, IEC61970-301, IEC62325-301

Renaming the CIM UML Model Packages 12/05/2023 12:37 PM Actions
6329 WG13 Issues CIM Issues New High

IEC61970-301, IEC61970-456

VsConverter required and optional attributes in SSH and SV Profiles 05/10/2023 11:18 AM Actions
6437 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New High

TR IEC 61850-7-5

Logical Device Inheritance Rules for LocSta 10/26/2023 03:43 AM Actions
6143 IEC TC57 WG10 Future Work WG10 Future Work New High

TR IEC 61850-7-500, TR IEC 61850-90-3

Update the Switchgear / Breaker Model 10/26/2023 03:50 AM Actions
6767 IEC 61850 User Feedback Task Force Bug New Normal Specifying virtualized physical devices and LN's 04/17/2024 10:45 AM Actions
6622 IEC 61850 TPWG Bug Rejected Normal Test case Ttf1 (mustUnderstand) for the ICT conformance test needs clarification 12/12/2023 08:19 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
6738 IEC 61850 User Feedback Task Force Improvement Resolved Normal Amending TGSN LN class with settings for adapting the signal 04/09/2024 08:19 AM Actions
6370 IEC 61850 User Feedback Task Force Improvement Resolved Normal SBOns to be deprecated in future. 06/20/2023 09:39 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 06/05/2023 01:58 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
6780 Server Issues New Normal sGos23 q=test shall be processes as invalid 05/06/2024 08:37 AM Actions
6777 Client Issues In Progress Normal SCD import and Tool Functionality test procedures 04/30/2024 08:13 AM Actions
6776 Client Issues In Progress Normal cSBOns4 requires different control value 05/06/2024 08:44 AM Actions
6769 Server Issues In Progress Normal sGop9 should allow NdsCom to be set in the GOOSE message 05/06/2024 08:08 AM Actions
6753 Server Issues In Progress Normal sGos20, sGos21 force DUT as Subscriber to ignore future edition dataset elements, while 61850-7-1 expects achievable forward compatibility 05/06/2024 07:56 AM Actions
6751 IEC 61850 TPWG Issues Resolved Normal Update IEC 61850 QAP Addendum for adding requirement quickly 04/16/2024 08:16 AM Actions
6728 Client Issues In Progress Normal cSg13 refers to PIXIT entry Sg5/Sg6 but not clarified in the expected result 05/06/2024 09:34 AM Actions
6727 Client Issues Resolved Normal cDsN1bc, cFtN2 have no non-Ed2 specific error code 04/02/2024 08:42 AM Actions
6724 Client Issues In Progress Normal GOOSE Subscriber sGos12 test expects DUT to _send_ a GOOSE message 04/30/2024 08:17 AM Actions
6723 Server Issues In Progress Normal GOOSE destination MAC address according Amd1: PIXIT Gs1 mismatches enhancement of sGos5 05/02/2024 10:01 AM Actions
6722 Server Issues In Progress Normal sGop10 PIXIT reference needed ? 05/02/2024 09:41 AM Actions
6710 Server Issues Resolved Normal sSrv13 does not specify that the lower hierarchy Mod.stVal shall not change 04/02/2024 02:42 PM Actions
6697 Server Issues Resolved Normal sRpN9 does not specify the expected access error by negative response on SetURCBValues 04/02/2024 08:40 AM Actions
6688 Client Issues Resolved Normal cSrvN10 - Ed1 specific error codes do not exist for MMS GetNameList 04/02/2024 08:42 AM Actions
6685 GOOSE Performance Issues In Progress Normal Device need to be certified for Ed2.1 server first 04/30/2024 08:14 AM Actions
6655 Client Issues Resolved Normal cLogN5 is missing in table A4.2 and certificate template 01/09/2024 08:28 AM Actions
6654 Client Issues Resolved Normal Tracking numbering mismatch Ed2 <> Ed2.1 01/09/2024 08:27 AM Actions
6653 Server Issues Rejected Normal sFt2c does deletable means everything else is not deletable 01/09/2024 08:19 AM Actions
6631 SCL Tooling Issues Resolved Normal tTf1 (mustUnderstand) for the ICT test needs clarification 01/09/2024 08:59 AM Actions