Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
6189 WG14 Issues CIM Issues New Urgent iec61968cim13v13b 11/25/2022 08:32 AM Actions
6188 Server Issues New Normal sSBOns8 does not consider PIXIT Ct13 11/25/2022 04:33 AM Actions
6187 IEC 61850 Certificate IEC 61850 Certificate Approved Normal UR N60 Edition 2 Server 11/24/2022 08:18 AM Actions
6186 IEC 61850 User Feedback Task Force Feature New Normal

IEC 61850-7-2 Clause 16

Changing the ActSG while reservation by another client is ongoing 11/22/2022 11:55 AM Actions
6185 IEC TC57 WG10 Future Work WG10FutureWork 2022 IOP New Normal SCL Need to differentiate the difference in the number of GOOSE vs R-GOOSE 11/22/2022 08:26 AM Actions
6183 DNP Conformance Certificates DNP Conformance Certificate Approved Normal Lucy Electric Gemini 3 mini 11/13/2022 11:34 PM Actions
6182 DNP Conformance Certificates DNP Conformance Certificate Approved Normal IDS ACOS 750 11/13/2022 11:25 PM Actions
6181 DNP Conformance Certificates DNP Conformance Certificate Approved Normal Schneider Electric SCADAPack 535E 11/13/2022 11:18 PM Actions
6180 DNP Conformance Certificates DNP Conformance Certificate Approved Normal Moxa MGate 5109 11/13/2022 11:13 PM Actions
6179 DNP Conformance Certificates DNP Conformance Certificate Approved Normal Instituto Nacional de Electricidad y Energias Limpias UCM-CFE 11/13/2022 11:06 PM Actions
6178 WG13 Issues CIM Issues New Low Relation between ResourcePerformanceEvaluation and ResourcePerformanceGlobalFactor contains a typo at the source side (role) of the association. 11/11/2022 08:12 AM Actions
6177 IEC 61850 Certificate IEC 61850 Certificate Approved Normal PNC FTU-P200T Server Edition 2 11/09/2022 07:00 AM Actions
6176 IEC 61850 Certificate IEC 61850 Certificate Approved Normal Schneider Easergy MiCOM P545 Edition 2 Server 11/08/2022 08:39 AM Actions
6167 IEC 61850 User Feedback Task Force Support email In Progress Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 11/08/2022 08:36 AM Actions
622 IEC 61850 User Feedback Task Force Feature 18 RTE Triage Normal

IEC 61850-7-4

Parameters not available in standardized LN 11/08/2022 08:33 AM Actions
624 IEC 61850 User Feedback Task Force Support 21 RTE Triage Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 11/08/2022 08:32 AM Actions
5374 IEC 61850 User Feedback Task Force Feature RTE Triage Normal

IEC 61850-7-4

Creation of a new LN for protection function 11/08/2022 08:31 AM Actions
5970 IEC 61850 User Feedback Task Force Improvement 2022 f2F IOP In Progress Normal

IEC 61850-6

SCT behavior needs to be specified regarding mismatch between substation section and IED section 11/08/2022 08:24 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/08/2022 08:18 AM Actions
6168 Market Management CIM Issues Open Normal Deprecate the three attributes in Series 11/03/2022 10:21 AM Actions
6166 WG16 Issues CIM Issues Open Normal Change organization to organisation 11/03/2022 10:21 AM Actions
6174 IEC 61850 TPWG Issues New Normal Amend sCtl7 to test both interlocking check and check synchronizing ? 11/02/2022 11:10 AM Actions
6173 IEC 61850 Certificate IEC 61850 Certificate Approved Normal FTU PNC Technologies Edition 2 Server 11/02/2022 07:36 AM Actions
652 Server Issues Resolved Normal Publisher can use maximum number of dataset elements 11/01/2022 09:04 AM Actions
5961 Server Issues In Progress Normal sCtl16 shall specify LocSta/MltLev to match with table B.1 11/01/2022 08:52 AM Actions
6172 Client Issues In Progress Normal client check bits must be tested 11/01/2022 08:36 AM Actions
5914 Server Issues In Progress Normal Verify that LPHD.Sim is not affected by LLN0.Beh 11/01/2022 08:24 AM Actions
6169 Server Issues In Progress Normal verify IED can subscribe to GOOSE/SV from ServerAt accesspoint 11/01/2022 08:23 AM Actions
6157 Server Issues In Progress Normal sCnf/sMdl not applicable for test equipment 11/01/2022 08:22 AM Actions
5926 SCL Tooling Issues In Progress Normal Review ICT TP 11/01/2022 08:12 AM Actions
5960 General Testing Issues Improvement In Progress Normal Herb to review access control of test documents 11/01/2022 08:06 AM Actions
6150 DNP Conformance Certificates DNP Conformance Certificate Approved Normal Ingeteam INGESAS IC3 10/31/2022 08:54 AM Actions
6171 IEC 61850 Certificate IEC 61850 Certificate Approved Normal REX640 Protection and Control Relay 10/27/2022 12:12 PM Actions
4996 WG13 Issues CIM Issues Open Normal IdentifiedObject.name to be optionalThere are many classes 10/26/2022 11:02 AM Actions
4971 WG13 Issues CIM Issues Open Normal DC documenation match IEC62747Use the language of IEC62747 10/26/2022 10:46 AM Actions
6170 IEC 61850 Certificate IEC 61850 Certificate Approved Normal EcoStruxure Power Operation Edition 2 Client 10/25/2022 01:25 PM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 10/25/2022 09:23 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 10/25/2022 09:20 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
618 IEC 61850 User Feedback Task Force Improvement 14 RTE Resolved Normal

IEC 61850-90-3

Evolution of DO SumSqA of LN SPTRExt 10/25/2022 08:50 AM Actions
5375 WG13 Issues CIM Issues Open Normal Review removed paragraphs from Part-11 and see where they fit 10/19/2022 10:53 AM Actions
5869 WG13 Issues CIM Issues Open Normal BusSegment - UML updates 10/19/2022 10:36 AM Actions
5917 Server Issues Resolved Urgent 'Expected result' for some test cases of CB9b: GOOSE subscribe 10/18/2022 08:59 AM Actions
6142 Server Issues In Progress Normal TemplatePics_Ed1Ed2Ed2p1_Excel_rev3p1 contains wrong comment for T2 10/18/2022 08:36 AM Actions
6165 IEC TC57 WG10 Future Work WG10FutureWork Tissue DB New Normal https://iec61850.tissue-db.com/tissue/1844 - Implementation of SumSwARs in 3-phase circuit breaker inaccurate 10/18/2022 08:33 AM Actions
6164 IEC TC57 WG10 Future Work WG10FutureWork Tissue DB New Normal https://iec61850.tissue-db.com/tissue/1825 - Permission mode for control/setting of a scheduled entity from a client 10/18/2022 08:29 AM Actions
6163 IEC TC57 WG10 Future Work WG10FutureWork Tissue DB New Normal https://iec61850.tissue-db.com/tissue/1804 - When e.g. LocSta = false, result of command to switch DO Mod with "station-control" not clear. 10/18/2022 08:21 AM Actions
6162 IEC TC57 WG10 Future Work WG10FutureWork Tissue DB New Normal https://iec61850.tissue-db.com/tissue/1803 - Mechanical Blocking of 3 way switches 10/18/2022 08:19 AM Actions
6161 IEC TC57 WG10 Future Work WG10FutureWork Tissue DB New Normal https://iec61850.tissue-db.com/tissue/1797 - SwModKey dependency of CSWI from LLN0 10/18/2022 08:16 AM Actions
6160 IEC TC57 WG10 Future Work WG10FutureWork Tissue DB New Normal https://iec61850.tissue-db.com/tissue/1796 LPHD.PwrSupAlm as Omulti 10/18/2022 08:11 AM Actions
(1-50/1860) Per page: 25, 50, 100

Also available in: Atom CSV PDF