Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
6622 IEC 61850 TPWG Bug Rejected Normal Test case Ttf1 (mustUnderstand) for the ICT conformance test needs clarification 12/12/2023 08:19 AM Actions
7001 IEC 61850 User Feedback Task Force Bug Resolved Normal Presence condition of DO in statistic Logical Nodes 10/22/2024 08:15 AM Actions
7030 IEC 61850 User Feedback Task Force Bug Resolved Normal Is there a use case for applying more than one trgOpt on a particular DA? 10/22/2024 09:09 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
6767 IEC 61850 User Feedback Task Force Feature Resolved Normal Specifying virtualized physical devices and LN's 06/03/2024 03:10 AM Actions
7033 IEC 61850 User Feedback Task Force Feature Resolved Normal Addition of DO SPS in the LN KPMP 10/22/2024 09:23 AM Actions
7126 IEC 61850 User Feedback Task Force Feature IEEE P13 Triage Normal Sequence-Of-Event record being overflowed if binary points “chatter” 03/13/2025 10:01 AM Actions
7151 IEC 61850 TPWG Feature Resolved Normal Consider whether an OCL rule can be created when working on test cases 06/10/2025 08:32 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
7134 IEC 61850 User Feedback Task Force Support Resolved Normal Use of PTRC.Op to issue trip to PIU 03/11/2025 10:20 AM Actions
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 06/05/2023 01:58 AM Actions
6370 IEC 61850 User Feedback Task Force Improvement Resolved Normal SBOns to be deprecated in future. 06/20/2023 09:39 AM Actions
6738 IEC 61850 User Feedback Task Force Improvement Resolved Normal Amending TGSN LN class with settings for adapting the signal 04/09/2024 08:19 AM Actions
7062 General Testing Issues Improvement Resolved Normal Need to be able to test Virtual IEC 61850 Devices 01/07/2025 08:40 AM Actions
7080 IEC 61850 User Feedback Task Force Improvement TF OCL Triage Normal When an exchange is defined between 2 IEDs, check that they are connected on the same Subnetwork (at the AccessPoint level) 05/06/2025 08:15 AM Actions
7245 General Testing Issues Improvement New High Access to the templates of the Conformance statements 06/27/2025 02:59 AM Actions
636 Client Issues Resolved High Mandate RCB reservation for Ed2.0 client and Amd1 server 04/20/2021 02:23 PM Actions
651 Server Issues Rejected Low Verify subscriber can accept maximum size GOOSE 01/24/2023 08:40 AM Actions
653 Server Issues Rejected Low Subscriber can use maximum number of dataset elements 01/24/2023 09:03 AM Actions
654 Server Issues Rejected Low Publish/subscribe minimum length data GOOSE 01/24/2023 09:02 AM Actions
658 Client Issues Resolved Normal Verify Client does process a report before RptEna write respond+ 06/01/2021 08:23 AM Actions
3115 Client Issues Resolved Normal Forward compatibility to Amd1 server with pre-assigned URCB/BRCB 06/14/2022 08:35 AM Actions
5120 SCL Tooling Issues Resolved Normal LGOS/LSVS reference with functional naming (SCL) 08/09/2022 08:40 AM Actions
5138 Server Issues Rejected Normal sBr13 without pre-assignment 12/13/2021 04:43 AM Actions
5327 Client Issues Resolved Normal PIXIT - add processing/mapping of quality bits 06/28/2022 09:44 AM Actions
5344 Server Issues Rejected Normal sBr29 power-up the IED is missing 06/02/2022 04:12 PM Actions
5347 GOOSE Performance Issues Resolved Normal How should time correlated GOOSE change status in GOOSE Performance test 05/27/2025 06:38 AM Actions
5906 Server Issues Rejected Normal sCnf51 at least one LPHD 09/06/2022 08:20 AM Actions
5926 SCL Tooling Issues Resolved Normal Review ICT TP 11/29/2022 07:23 AM Actions
6172 Client Issues Resolved Normal client check bits must be tested 12/13/2022 08:34 AM Actions
6174 Server Issues Rejected Normal Amend sCtl7 to test both interlocking check and check synchronizing ? 02/07/2023 08:24 AM Actions
6200 SCL Tooling Issues Resolved Normal tTf1 change Ed2/2007B to Ed2.1/2007B4 01/24/2023 08:33 AM Actions
6206 Server Issues Rejected Normal Type and size of Length field value (TLV) encoding in SV 01/11/2023 06:19 AM Actions
6208 Server Issues Rejected Normal sSvsN2 in TP1.2 does not check the situation where the DUT checks ConfRev 03/21/2023 08:20 AM Actions
6323 SCL Tooling Issues Resolved Normal tTtf5 IED name=None is not allowed tissue #1365 05/02/2023 08:20 AM Actions
6324 SCL Tooling Issues Rejected Normal sCnf6 - not all extRef require intAddr not referring to external device 05/16/2023 08:44 AM Actions
6325 SCL Tooling Issues Resolved Normal PIXIT missing entries on tIie1 "when supported" 05/16/2023 08:04 AM Actions
6326 SCL Tooling Issues Resolved Normal tIie1 - remove step 10-14 to undo previous changes 05/16/2023 08:09 AM Actions
6327 SCL Tooling Issues Resolved Normal tTf2 - export CID file only for Ed2.1? 05/16/2023 08:20 AM Actions
6365 Server Issues Rejected Normal Considering PTP version 2.1 07/11/2023 08:12 AM Actions
(1-50/2309) Per page: 25, 50, 100