# Project Tracker ID Source Status Priority Standard(s) Subject Updated
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
6711 61850-7-5 and 61850-7-500 IEC61850-7-5 WG10 Fall workshop In Progress Low SCL Modelling of Fault Measurements (RFMX) 02/29/2024 08:33 AM Actions
6447 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low Enhanced Quality Information for Measurements (accuracy classes, update periods, filter applied, algorithm applied, etc.) 02/08/2024 03:16 AM Actions
6439 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New High Inter-substation GOOSE Naming convention (90-1) 10/26/2023 03:42 AM Actions
6433 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low SCL Extensions (partial configuration updates in a top-down approach, mixed editions with private CDCs, etc.) 02/08/2024 03:03 AM Actions
6419 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal Logical Nodes for SLD/Topology Aware Functions 02/09/2024 04:55 AM Actions
6414 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop In Progress Urgent Golden Single Line Diagram For All SCL/GCL/HCL Examples 10/26/2023 02:58 AM Actions
6686 61850-7-5 and 61850-7-500 IEC61850-7-5 Tissue #1892 New Normal Description of the different control methods to change position of OLTC (in automatic, manual modes) 01/23/2024 11:02 AM Actions
6545 61850-7-5 and 61850-7-500 IEC61850-7-5 TC92 WG2 Waiting for Release Normal Propagation of detailQual 02/29/2024 07:17 AM Actions
6687 61850-7-5 and 61850-7-500 IEC61850-7-5 SEL Waiting for Release Normal Incorrect signal direction for GOOSE messages between CSWI and XCBR 02/29/2024 08:10 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
6726 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/29/2024 09:07 AM Actions
6725 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 02/29/2024 09:07 AM Actions
6607 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE New Normal Create DO indicating the source of synchronisation 11/21/2023 08:49 AM Actions
6606 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE New Normal CPU monitoring 11/21/2023 08:40 AM Actions
6560 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal Multiple information sources 10/26/2023 04:02 AM Actions
6559 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal Modelling of a Lockout/trip seal-in relay 04/19/2024 09:19 AM Actions
6558 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal How to model composed functions 10/26/2023 04:01 AM Actions
6557 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal Modelling of various MCB trips 10/26/2023 04:00 AM Actions
6556 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal How to impact the data quality of a data with respect to the communication links, the intermediate processing, the device hosting it. 10/26/2023 04:00 AM Actions
6562 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6155 New Normal Missing LN for Miniature Circuit Breaker (MCB) 10/26/2023 05:17 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
6714 IEC TC57 WG10 Future Work WG10 Future Work IEC PAS 61850-90-3 New Normal Improve the models used for power regulation 02/20/2024 11:04 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
5966 IEC TC57 WG10 Future Work WG10 Future Work EDF New Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 02/09/2024 04:02 AM Actions
6684 61850-7-5 and 61850-7-500 IEC61850-7-5 discussion New Normal Proposal to deprecate 'LocSta' in X and Y group LN classes 01/22/2024 02:50 AM Actions
6767 IEC 61850 User Feedback Task Force Bug New Normal Specifying virtualized physical devices and LN's 04/17/2024 10:45 AM Actions
6622 IEC 61850 TPWG Bug Rejected Normal Test case Ttf1 (mustUnderstand) for the ICT conformance test needs clarification 12/12/2023 08:19 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
6738 IEC 61850 User Feedback Task Force Improvement Resolved Normal Amending TGSN LN class with settings for adapting the signal 04/09/2024 08:19 AM Actions
6370 IEC 61850 User Feedback Task Force Improvement Resolved Normal SBOns to be deprecated in future. 06/20/2023 09:39 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 06/05/2023 01:58 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
6780 Server Issues New Normal sGos23 q=test shall be processes as invalid 05/06/2024 08:37 AM Actions
6777 Client Issues In Progress Normal SCD import and Tool Functionality test procedures 04/30/2024 08:13 AM Actions
6776 Client Issues In Progress Normal cSBOns4 requires different control value 05/06/2024 08:44 AM Actions
6769 Server Issues In Progress Normal sGop9 should allow NdsCom to be set in the GOOSE message 05/06/2024 08:08 AM Actions
6753 Server Issues In Progress Normal sGos20, sGos21 force DUT as Subscriber to ignore future edition dataset elements, while 61850-7-1 expects achievable forward compatibility 05/06/2024 07:56 AM Actions
6751 IEC 61850 TPWG Issues Resolved Normal Update IEC 61850 QAP Addendum for adding requirement quickly 04/16/2024 08:16 AM Actions
6750 Server Issues Resolved High sAddr length - TISSUE 1885 04/16/2024 08:17 AM Actions
6749 Server Issues Resolved High Clarification of ExtRef attributes usage - TISSUE 1818 04/16/2024 08:31 AM Actions
6728 Client Issues In Progress Normal cSg13 refers to PIXIT entry Sg5/Sg6 but not clarified in the expected result 05/06/2024 09:34 AM Actions
6727 Client Issues Resolved Normal cDsN1bc, cFtN2 have no non-Ed2 specific error code 04/02/2024 08:42 AM Actions
6724 Client Issues In Progress Normal GOOSE Subscriber sGos12 test expects DUT to _send_ a GOOSE message 04/30/2024 08:17 AM Actions
(1-50/2163) Per page: 25, 50, 100