# Project Tracker ID Source Status Priority Standard(s) Subject Updated
3098 IEC 61850 User Feedback Task Force Improvement 1 WG17 In Progress Normal Need to Change 8-1 to allow multiple DOs to be written 03/29/2022 09:36 AM Actions
6711 61850-7-5 and 61850-7-500 IEC61850-7-5 WG10 Fall workshop In Progress Low SCL Modelling of Fault Measurements (RFMX) 02/29/2024 08:33 AM Actions
6447 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low Enhanced Quality Information for Measurements (accuracy classes, update periods, filter applied, algorithm applied, etc.) 02/08/2024 03:16 AM Actions
6439 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New High Inter-substation GOOSE Naming convention (90-1) 10/26/2023 03:42 AM Actions
6433 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Low SCL Extensions (partial configuration updates in a top-down approach, mixed editions with private CDCs, etc.) 02/08/2024 03:03 AM Actions
6419 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop New Normal Logical Nodes for SLD/Topology Aware Functions 02/09/2024 04:55 AM Actions
6414 IEC TC57 WG10 Future Work WG10 Future Work WG10 Fall workshop In Progress Urgent Golden Single Line Diagram For All SCL/GCL/HCL Examples 10/26/2023 02:58 AM Actions
6686 61850-7-5 and 61850-7-500 IEC61850-7-5 Tissue #1892 New Normal Description of the different control methods to change position of OLTC (in automatic, manual modes) 01/23/2024 11:02 AM Actions
7080 IEC 61850 User Feedback Task Force Improvement TF OCL New Normal When an exchange is defined between 2 IEDs, check that they are connected on the same Subnetwork (at the AccessPoint level) 12/16/2024 03:38 AM Actions
6545 61850-7-5 and 61850-7-500 IEC61850-7-5 TC92 WG2 Waiting for Release Normal Propagation of detailQual 02/29/2024 07:17 AM Actions
6687 61850-7-5 and 61850-7-500 IEC61850-7-5 SEL Waiting for Release Normal Incorrect signal direction for GOOSE messages between CSWI and XCBR 02/29/2024 08:10 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
6726 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/29/2024 09:07 AM Actions
6725 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 02/29/2024 09:07 AM Actions
6607 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE New Normal Create DO indicating the source of synchronisation 11/21/2023 08:49 AM Actions
6606 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE New Normal CPU monitoring 11/21/2023 08:40 AM Actions
6560 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal Multiple information sources 10/26/2023 04:02 AM Actions
6559 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal Modelling of a Lockout/trip seal-in relay 06/13/2024 07:47 AM Actions
6558 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal How to model composed functions 10/26/2023 04:01 AM Actions
6557 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal Modelling of various MCB trips 06/13/2024 08:25 AM Actions
6556 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6443 New Normal How to impact the data quality of a data with respect to the communication links, the intermediate processing, the device hosting it. 10/26/2023 04:00 AM Actions
6562 61850-7-5 and 61850-7-500 IEC61850-7-5 Redmine: 6155 New Normal Missing LN for Miniature Circuit Breaker (MCB) 10/26/2023 05:17 AM Actions
7047 61850-7-5 and 61850-7-500 IEC61850-7-5 Nanjing WG10 Meeting New Normal Compile a list of acronyms for inclusion in UML 11/01/2024 03:40 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
6714 IEC TC57 WG10 Future Work WG10 Future Work IEC PAS 61850-90-3 New Normal Improve the models used for power regulation 02/20/2024 11:04 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
5966 IEC TC57 WG10 Future Work WG10 Future Work EDF New Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 02/09/2024 04:02 AM Actions
6819 61850-7-5 and 61850-7-500 IEC61850-7-5 discussion New Normal Reworking IEC/TR 61860-7-500 clause 10.1.1.2 about pole discrepancy 07/26/2024 04:43 AM Actions
6684 61850-7-5 and 61850-7-500 IEC61850-7-5 discussion New Normal Proposal to deprecate 'LocSta' in X and Y group LN classes 01/22/2024 02:50 AM Actions
7058 61850-7-5 and 61850-7-500 IEC61850-7-5 Christophe Camélis New Normal Clarifications about 'PTRC.Op' and 'PTRC.Tr' 11/20/2024 01:55 AM Actions
7030 IEC 61850 User Feedback Task Force Bug Resolved Normal Is there a use case for applying more than one trgOpt on a particular DA? 10/22/2024 09:09 AM Actions
7001 IEC 61850 User Feedback Task Force Bug Resolved Normal Presence condition of DO in statistic Logical Nodes 10/22/2024 08:15 AM Actions
6622 IEC 61850 TPWG Bug Rejected Normal Test case Ttf1 (mustUnderstand) for the ICT conformance test needs clarification 12/12/2023 08:19 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
7033 IEC 61850 User Feedback Task Force Feature Resolved Normal Addition of DO SPS in the LN KPMP 10/22/2024 09:23 AM Actions
6767 IEC 61850 User Feedback Task Force Feature Resolved Normal Specifying virtualized physical devices and LN's 06/03/2024 03:10 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
7062 General Testing Issues Improvement Resolved Normal Need to be able to test Virtual IEC 61850 Devices 01/07/2025 08:40 AM Actions
6738 IEC 61850 User Feedback Task Force Improvement Resolved Normal Amending TGSN LN class with settings for adapting the signal 04/09/2024 08:19 AM Actions
6370 IEC 61850 User Feedback Task Force Improvement Resolved Normal SBOns to be deprecated in future. 06/20/2023 09:39 AM Actions
5968 IEC 61850 User Feedback Task Force Improvement Resolved Normal Change the diagrams in 7-500 to not use yellow lines 06/05/2023 01:58 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
7101 Server Issues New Normal sLog13 is LCB.LogRef always writable (SCL Services LogSettings has no attribute for LogRef) 01/21/2025 09:55 AM Actions
7100 Server Issues In Progress Normal Tissue 1934 Subscriber with beh=on receives GOOSE with q.test=true, then subscriber changes to test mode. 01/21/2025 08:37 AM Actions
7097 Server Issues Resolved Normal Step number error in expected result of sGos6b in Rev1.3 test procedure 01/21/2025 08:08 AM Actions
(1-50/2269) Per page: 25, 50, 100