Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
5083 IEC 61850 User Feedback Task Force Feature 7 MH Resolved Normal

IEC 61850-7-1 Ed2.1,7-5

Clarifications on the local/remote concept 3/8 06/05/2023 01:58 AM Actions
5082 IEC 61850 User Feedback Task Force Feature 6 MH Resolved Normal

IEC 61850-7-4,7-5

Clarifications on the local/remote concept 2/8 06/05/2023 01:58 AM Actions
5081 IEC 61850 User Feedback Task Force Feature 5 MH Resolved Normal

IEC 61850-7-1 Ed2.1/7-4 Ed2.1 Annex B/7-500

Clarifications on the local/remote concept 1/8 06/05/2023 01:58 AM Actions
5080 IEC 61850 User Feedback Task Force Feature 4 MH Resolved Normal

IEC 61850-7-1 Ed2.1 ,7-500

Clarification on the ctlModel 3/3 06/05/2023 01:58 AM Actions
5079 IEC 61850 User Feedback Task Force Feature 3 MH Resolved Normal

IEC 61850-7-1 Ed2.1, 7-500

Clarification on the ctlModel 2/3 06/05/2023 01:58 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 06/05/2023 01:58 AM Actions
627 IEC 61850 User Feedback Task Force Feature 29 RTE Resolved Normal

IEC 61850-7-4

Activation and deactivation of a function by configuration. 05/09/2023 09:32 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
612 IEC 61850 User Feedback Task Force Feature 11 RTE Resolved Normal

IEC 61850-7-4

Need to create a new LN of group P (Protection), as "PCDP" to represent the Pole Discrepancy Protection. 05/09/2023 09:32 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
607 IEC 61850 User Feedback Task Force Support 6 H30 In Progress Normal

IEC 61850-80-6 (90-2)

LPHD.Sim management 06/21/2022 02:09 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
6303 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

IEC 61850-7-500

LN PDIF – setting for nominal current 06/05/2023 01:58 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
676 IEC 61850 User Feedback Task Force Support 49 RTE Resolved Normal

IEC 61850-7-5

Clarification of addCause 06/05/2023 01:58 AM Actions
675 IEC 61850 User Feedback Task Force Support 48 RTE Resolved Normal

IEC 61850-7-4 Ed2.1

Clarification of blocked mode 11/21/2023 08:38 AM Actions
647 IEC 61850 User Feedback Task Force Support 57 ENTSO-E Resolved Normal

IEC 61850-7-500

Single phase and multi phase trip indication for the autorecloser 05/09/2023 09:32 AM Actions
624 IEC 61850 User Feedback Task Force Support 21 RTE Resolved Normal

IEC 61850-6

Clarification of using of ValKind, ValImport. 05/09/2023 09:32 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
(101-125/2163) Per page: 25, 50, 100