Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
475 IEC 61850 User Feedback Task Force Support 31 IOP_2013 Closed Normal With the renaming of LNTypes, DOTypes, etc., there should be a specification as to the maximum size for these names. The XSD sho 06/21/2022 09:00 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
558 IEC 61850 User Feedback Task Force Support 30 ENTSO-E Closed Normal

IEC 61850-7-4

Busbar protection (BBP): Diff/Kirchoff BBP 12/06/2022 09:02 AM Actions
474 IEC 61850 User Feedback Task Force Support 30 IOP_2013 Closed Normal Should all SCTs support a substation section and the ability to associate LNodes into that section. 06/21/2022 09:00 AM Actions
408 IEC 61850 User Feedback Task Force Bug 3.2 ENTSO-E Closed High PICS, MICS and other statements documents are not formally defined 02/09/2021 06:20 AM Actions
407 IEC 61850 User Feedback Task Force Feature 3.1 ENTSO-E Closed Normal "Vendor/User” and “Vendor/Vendor” Interoperability list 02/11/2021 06:17 AM Actions
446 IEC 61850 User Feedback Task Force Bug 3 IOP_2013 Closed High

IEC 61850-6

The actual format required for an ClientLN (used for ReportControl Block reservation) is not specified fully or in an understand 02/11/2021 06:30 AM Actions
522 IEC 61850 User Feedback Task Force Feature 3 IOP_2017/5 Closed Normal

IEC 61850-6

SCD file has “originalSclVersion=2007” for all IED, including Ed1 devices 06/21/2022 09:24 AM Actions
440 IEC 61850 User Feedback Task Force Support 3 Vattenfall Closed Normal The specified sigal has a utility process name independent of used protcol. E.g. "start of distance protection". Also link to a 06/21/2022 09:19 AM Actions
488 IEC 61850 User Feedback Task Force Support 3 IOP_2015 Closed Normal

6

An ICD file has predefined ReportControlBlock. With the SCT we attached a dataset to one URCB. Afterwards we decide to de-config 06/21/2022 09:11 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
514 IEC 61850 User Feedback Task Force Support 29 IOP_2015 Closed Normal Priority of error checking in controls – i.e. position-reached instead of Blocked-by-switching-hierarchy. The order of checks i 06/21/2022 09:12 AM Actions
473 IEC 61850 User Feedback Task Force Support 29 IOP_2013 Closed Normal An SCL file was provided that had a <Val> for an OctetString value. A question was raised as to the correct format for the value 06/21/2022 09:00 AM Actions
557 IEC 61850 User Feedback Task Force Feature 29 ENTSO-E Closed Normal

IEC 61850-7-4

Lockout functionality: how to model by different protection functions? 02/11/2021 06:05 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
513 IEC 61850 User Feedback Task Force Support 28 IOP_2015 Closed Normal

90-4

HSR and PRP are redundancy protocols. In order to prevent a single point of failure, many people are considering 2 red boxes 06/21/2022 09:09 AM Actions
472 IEC 61850 User Feedback Task Force Support 28 IOP_2013 Closed Normal An ED.2 SCT would not import an ED.1 SCL file. This needs to be addressed with rules of transformation and the definition of a s 06/21/2022 09:00 AM Actions
437 IEC 61850 User Feedback Task Force Support 28 ENTSO-E Closed Normal

IEC 61850-6

SCL: Use of InRef and ExtRef not possible in many tools 02/11/2021 06:57 AM Actions
436 IEC 61850 User Feedback Task Force Support 27 ENTSO-E Closed Normal Too many options in the standard 06/05/2023 01:59 AM Actions
512 IEC 61850 User Feedback Task Force Support 27 IOP_2015 Closed Normal

90-4

Testing unconfigured VLAN, there is a question of how VLAN tags (e.g. 20) should be handled by the HSR ring. However, what sho 06/21/2022 09:12 AM Actions
471 IEC 61850 User Feedback Task Force Support 27 IOP_2013 Closed Normal How should an SCL file express the initial value of GOCB.Ena and SVCB.Ena. It would appear that the Control Block schema definit 06/21/2022 09:00 AM Actions
546 IEC 61850 User Feedback Task Force Feature 27 IOP_2017/47 Closed Normal

IEC 61850-6 §10 annex G

Different level of expectations between the ICT and SCT 02/11/2021 07:16 AM Actions
545 IEC 61850 User Feedback Task Force Feature 26 IOP_2017/46 Closed Normal

IEC 61850-6-2

SLD visualization issues in SCL 06/21/2022 09:24 AM Actions
511 IEC 61850 User Feedback Task Force Support 26 IOP_2015 Closed Normal

2-Sep

The Quality bits alignment in 9-2LE seems different from 8-1 quality bits with ASN.1. So it caused confusion that which bit shou 06/21/2022 09:12 AM Actions
(76-100/3048) Per page: 25, 50, 100

Also available in: Atom CSV PDF