# Project Tracker ID Source Status Priority Standard(s) Subject Updated
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
6777 Client Issues In Progress Normal SCD import and Tool Functionality test procedures 04/30/2024 08:13 AM Actions
6776 Client Issues In Progress Normal cSBOns4 requires different control value 05/06/2024 08:44 AM Actions
6769 Server Issues In Progress Normal sGop9 should allow NdsCom to be set in the GOOSE message 05/06/2024 08:08 AM Actions
6766 WG16 Issues CIM Issues In Progress Normal ResourceCertification attribute type is generic and could be renamed to a more describe attribute name 04/18/2024 10:37 AM Actions
6765 WG16 Issues CIM Issues In Progress Normal ResourceCertification.type - update the description to describe the usage of the attribute "type" 04/18/2024 10:25 AM Actions
6764 WG16 Issues CIM Issues In Progress Normal ResourceCertification.qualificationFlag description is incorrect 04/18/2024 10:40 AM Actions
6753 Server Issues In Progress Normal sGos20, sGos21 force DUT as Subscriber to ignore future edition dataset elements, while 61850-7-1 expects achievable forward compatibility 05/06/2024 07:56 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
6728 Client Issues In Progress Normal cSg13 refers to PIXIT entry Sg5/Sg6 but not clarified in the expected result 05/06/2024 09:34 AM Actions
6726 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 02/29/2024 09:07 AM Actions
6725 61850-7-5 and 61850-7-500 IEC61850-7-5 RTE In Progress Normal Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 02/29/2024 09:07 AM Actions
6724 Client Issues In Progress Normal GOOSE Subscriber sGos12 test expects DUT to _send_ a GOOSE message 04/30/2024 08:17 AM Actions
6723 Server Issues In Progress Normal GOOSE destination MAC address according Amd1: PIXIT Gs1 mismatches enhancement of sGos5 05/02/2024 10:01 AM Actions