547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
6483 Server Issues Resolved Normal Need to be able to test 61850-7-420 09/05/2023 08:14 AM Actions
403 IEC 61850 User Feedback Task Force Bug 1 ENTSO-E Closed High Problem exchanging SCL file between tools 02/09/2021 06:22 AM Actions
404 IEC 61850 User Feedback Task Force Feature 2.1 ENTSO-E Closed Normal Meaning of "optional" regarding data model 02/11/2021 06:21 AM Actions
405 IEC 61850 User Feedback Task Force Feature 2.2 ENTSO-E Closed Normal Optionality of DO/DA from the point of view of users 02/11/2021 06:20 AM Actions
406 IEC 61850 User Feedback Task Force Bug 2.3 ENTSO-E Closed High Configuration of datasets by users 02/03/2021 03:55 PM Actions
407 IEC 61850 User Feedback Task Force Feature 3.1 ENTSO-E Closed Normal "Vendor/User” and “Vendor/Vendor” Interoperability list 02/11/2021 06:17 AM Actions
408 IEC 61850 User Feedback Task Force Bug 3.2 ENTSO-E Closed High PICS, MICS and other statements documents are not formally defined 02/09/2021 06:20 AM Actions
409 IEC 61850 User Feedback Task Force Feature 4.1 ENTSO-E Closed Normal Too loose or non existing guideline for organization of structure tree (construction of each LD, LN etc) 12/06/2022 09:00 AM Actions
410 IEC 61850 User Feedback Task Force Bug 4.2 ENTSO-E Closed High Data models using GGIO when not needed 02/09/2021 06:19 AM Actions
(76-100/3048) Per page: 25, 50, 100

Also available in: Atom CSV PDF