585 IEC 61850 User Feedback Task Force Feature 1337 IOP_2019 Closed Normal

IEC 61850-6

SCT unable to configure the device to communicate on multiple subnets due to having a single AP (with all Eth. Ports) 07/05/2022 08:24 AM Actions
586 IEC 61850 User Feedback Task Force Feature 1340 IOP_2019 Closed Normal

IEC 61850-6

Client application cannot connect to IED that are having issue with format of AP-Title 07/05/2022 08:26 AM Actions
587 IEC 61850 User Feedback Task Force Feature 1404 IOP_2019 Closed Normal

IEC 61850-6

LNodeTypes and DOTypes not used in the IED section - is it allowed to keep them in DataTypeTemplate section? 02/11/2021 07:01 AM Actions
588 IEC 61850 User Feedback Task Force Feature 1548 IOP_2019 Closed Normal

IEC 61850-6

More than one redundant PhysConn for ConnectedAP of IED AP and no redundant PhysConn on same AP 06/21/2022 09:28 AM Actions
589 IEC 61850 User Feedback Task Force Feature 1700 IOP_2019 Closed Normal

IEC 61850-6

Usage of max of RptEnabled when indexed attribute is false and the relationship to RptEnabled 07/05/2022 08:28 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
591 IEC 61850 User Feedback Task Force Feature 1857 IOP_2019 Closed Normal

IEC 61850-6

A reservation could not be made via SCL for an IED’s report due to the lack of a ConnectedAP associated with the client’s AP 07/05/2022 08:34 AM Actions
593 IEC 61850 User Feedback Task Force Feature 1601 IOP_2019 Closed Normal

IEC 61850-6

How to disable SV control blocks that are not in use? 06/21/2022 09:29 AM Actions
594 IEC 61850 User Feedback Task Force Feature 1642_01 IOP_2019 Closed Normal

IEC 61850-6

Reverse engineering of subscription is not possible when Server and ServerAt APs are connected to the same SubNetwork 06/21/2022 09:29 AM Actions
598 IEC 61850 User Feedback Task Force Feature 2108 IOP_2019 Closed Normal

IEC 61850-6

The SCT tool creates an invalid ReportControl element 07/05/2022 08:47 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
404 IEC 61850 User Feedback Task Force Feature 2.1 ENTSO-E Closed Normal Meaning of "optional" regarding data model 02/11/2021 06:21 AM Actions
405 IEC 61850 User Feedback Task Force Feature 2.2 ENTSO-E Closed Normal Optionality of DO/DA from the point of view of users 02/11/2021 06:20 AM Actions
407 IEC 61850 User Feedback Task Force Feature 3.1 ENTSO-E Closed Normal "Vendor/User” and “Vendor/Vendor” Interoperability list 02/11/2021 06:17 AM Actions
409 IEC 61850 User Feedback Task Force Feature 4.1 ENTSO-E Closed Normal Too loose or non existing guideline for organization of structure tree (construction of each LD, LN etc) 12/06/2022 09:00 AM Actions
448 IEC 61850 User Feedback Task Force Feature 5 IOP_2013 Closed Normal ICD has a destination MAC address of 00:00:00:00:00. Is this valid for usage? 02/11/2021 07:50 AM Actions
455 IEC 61850 User Feedback Task Force Feature 12 IOP_2013 Closed Normal How does a SCT know the maximum number of instantiated RCBs allowed in an IED and what the allowed distribution per RCB? 02/11/2021 07:47 AM Actions
592 IEC 61850 User Feedback Task Force Feature IntApp IOP_2019 Closed Normal Invalid SCL file due to wrong allocation fo GoCBs 06/21/2022 09:29 AM Actions
596 IEC 61850 User Feedback Task Force Feature 1710 IOP_2019 Closed Normal An IED declares constraints that are not machine processable 02/11/2021 06:43 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
564 IEC 61850 User Feedback Task Force Support 36 ENTSO-E Closed Normal

IEC 61850-90-6

S/S related applications: Auxiliary transfer 02/11/2021 07:01 AM Actions
568 IEC 61850 User Feedback Task Force Support 40 ENTSO-E Closed Normal

IEC 61850-90-3

S/S related applications: Fire detection/extinction 02/11/2021 06:59 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
541 IEC 61850 User Feedback Task Force Support 22 IOP_2017/36 Closed Normal

IEC 61850-9-2(LE), IEC 61869-9

APPID rules for backward compatible variants (9-2LE) shall be noted in IEC 61869-9 06/21/2022 09:24 AM Actions
561 IEC 61850 User Feedback Task Force Support 33 ENTSO-E Closed Normal

IEC 61850-7-500

Pole discrepancy: no LN to cover Trip and pole disc 02/11/2021 06:53 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
570 IEC 61850 User Feedback Task Force Support 42 ENTSO-E Closed Normal

IEC 61850-7-5

Health: Health of prot relay/subfunction 02/11/2021 06:55 AM Actions
566 IEC 61850 User Feedback Task Force Support 38 ENTSO-E Closed Normal

IEC 61850-7-420

S/S related applications: Diesel aggregat alarm 12/06/2022 09:35 AM Actions
565 IEC 61850 User Feedback Task Force Support 37 ENTSO-E Closed Normal

IEC 61850-7-4/90-3

S/S related applications: DC battery model and converter/charger/rectifier alarms 02/11/2021 07:00 AM Actions
581 IEC 61850 User Feedback Task Force Support 53 ENTSO-E Closed Normal

IEC 61850-7-4, 7-5

S/S related applications: Disturbance recorder - communication session active 12/06/2022 09:37 AM Actions
582 IEC 61850 User Feedback Task Force Support 54 ENTSO-E Closed Normal

IEC 61850-7-4, 7-5

Synchrocheck: Synchrocheck - missing signals 12/06/2022 09:37 AM Actions
510 IEC 61850 User Feedback Task Force Support 25 IOP_2015 Closed Normal

IEC 61850-7-4

For the latest TISSUE 1361 for Ed2.0 (statement in the attachment), there are two things to be clarified:1. The statement: Swit 06/21/2022 09:12 AM Actions
558 IEC 61850 User Feedback Task Force Support 30 ENTSO-E Closed Normal

IEC 61850-7-4

Busbar protection (BBP): Diff/Kirchoff BBP 12/06/2022 09:02 AM Actions
559 IEC 61850 User Feedback Task Force Support 31 ENTSO-E Closed Normal

IEC 61850-7-4

Busbar protection: ARC detection protection 12/06/2022 09:02 AM Actions
560 IEC 61850 User Feedback Task Force Support 32 ENTSO-E Closed Normal

IEC 61850-7-4

Busbar protection: Simplified logic 02/11/2021 07:02 AM Actions
562 IEC 61850 User Feedback Task Force Support 34 ENTSO-E Closed Normal

IEC 61850-7-4

Transformer diff. protection: Restricted earthfault protection 02/11/2021 07:02 AM Actions
563 IEC 61850 User Feedback Task Force Support 35 ENTSO-E Closed Normal

IEC 61850-7-4

Transformer diff. protection: Protection blocked by harmonics 02/11/2021 07:01 AM Actions
567 IEC 61850 User Feedback Task Force Support 39 ENTSO-E Closed Normal

IEC 61850-7-4

S/S related applications: 400VAC/110VDC 02/11/2021 07:00 AM Actions
569 IEC 61850 User Feedback Task Force Support 41 ENTSO-E Closed Normal

IEC 61850-7-4

S/S related applications: Access security system 12/06/2022 09:36 AM Actions
571 IEC 61850 User Feedback Task Force Support 43 ENTSO-E Closed Normal

IEC 61850-7-4

Insulation Supervision: Gas detector sensor 02/11/2021 06:54 AM Actions