Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
632 IEC 61850 User Feedback Task Force Support 8 H30 Resolved High

IEC 61850-9-2, IEC 61869-9

APPID 0x4000 - Sampled Values 12/05/2023 09:16 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
6605 IEC 61850 User Feedback Task Force Support RTE Resolved Normal

TR IEC 61850-7-500

Identification of three phase trip with ACT DO 11/21/2023 08:13 AM Actions
631 IEC 61850 User Feedback Task Force Feature 44 RTE Triage Normal Evolution of LN PSCH to build switching on information 08/17/2021 08:03 AM Actions
6739 IEC 61850 User Feedback Task Force Feature In Progress Normal How to deal with 'Beh' and 'Health' of isolated functions 04/09/2024 08:43 AM Actions
599 IEC 61850 User Feedback Task Force Feature 12 IOP_2019 Resolved Normal ICD files do not match requirements (several issues) - increase in engineering efforts 06/05/2023 01:58 AM Actions
623 IEC 61850 User Feedback Task Force Feature 19 RTE In Progress Normal New LN of group L (as "LPLE") representing a group of LED 03/02/2021 09:42 AM Actions
619 IEC 61850 User Feedback Task Force Feature 15 RTE Resolved Normal New LN of group L (as "LTED") to represent the dynamic topology of the substation. 05/09/2023 09:32 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
5085 IEC 61850 User Feedback Task Force Feature 9 MH Resolved Normal

IEC 61850 7-1 / 7-4 Ed2.1,7-5

Clarifications on the local/remote concept 5/8 06/05/2023 01:58 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 Resolved Normal

IEC 61850-2

Devices types/acronyms 06/05/2023 01:58 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
6246 IEC 61850 User Feedback Task Force Feature Resolved Normal

IEC 61850-6

ExtRef cannot specify a Poll intended to be implemented as a GetDataSetValues request  06/05/2023 01:58 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
5331 IEC 61850 User Feedback Task Force Feature SCL IOP 2021 Resolved Normal

IEC 61850-6

Multiple LNodes implemented by same LN 06/05/2023 01:58 AM Actions
5078 IEC 61850 User Feedback Task Force Feature 2 MH Resolved Normal

IEC 61850-7-1 / 7-2 Ed2.1 / 7-5/7-500

Clarification on the ctlModel 1/3 06/05/2023 01:58 AM Actions
5080 IEC 61850 User Feedback Task Force Feature 4 MH Resolved Normal

IEC 61850-7-1 Ed2.1 ,7-500

Clarification on the ctlModel 3/3 06/05/2023 01:58 AM Actions
(2101-2125/2163) Per page: 25, 50, 100

Also available in: Atom CSV PDF