# Project Tracker ID Source Status Priority Standard(s) Subject Updated
667 IEC 61850 User Feedback Task Force Improvement 4 WG10 Resolved Normal

IEC 61850-7-4

Report of current active setting group 06/05/2023 01:58 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
5926 SCL Tooling Issues Resolved Normal Review ICT TP 11/29/2022 07:23 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
6750 Server Issues Resolved High sAddr length - TISSUE 1885 04/16/2024 08:17 AM Actions
6370 IEC 61850 User Feedback Task Force Improvement Resolved Normal SBOns to be deprecated in future. 06/20/2023 09:39 AM Actions
5322 IEC 61850 User Feedback Task Force Improvement 2 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - add optional data objects to support irregular interval schedules 06/05/2023 01:58 AM Actions
5321 IEC 61850 User Feedback Task Force Improvement 1 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow 3 values per time point 06/05/2023 01:58 AM Actions
5323 IEC 61850 User Feedback Task Force Improvement 3 WG17 Resolved Normal

IEC 61850-7-4,7-5

Schedules - allow updates to single values while schedules are running 06/05/2023 01:58 AM Actions
597 IEC 61850 User Feedback Task Force Feature 1120 IOP_2019 Resolved Normal

61850-90-28

SCTs updating the confRev of 9-2 LE Sampled Value streams - problem with subscription to test tool SV injection 05/09/2023 09:32 AM Actions
6471 Client Issues Resolved Normal Select.response+ (Tissue 1753) 08/22/2023 08:10 AM Actions
748 Server Issues Resolved Normal sGos9 use SPS when INS subscribe is not supported 07/27/2021 10:07 AM Actions
6596 IEC 61850 User Feedback Task Force Bug Resolved Normal Simulation Mode with Centralized Protection 11/21/2023 08:32 AM Actions
5372 IEC 61850 User Feedback Task Force Improvement RTE Resolved Normal

IEC 61850-7-1

Simultaneous change of InRef.setSrcRef and InRef.setSrcCB for dynamic commutation 06/05/2023 01:58 AM Actions
647 IEC 61850 User Feedback Task Force Support 57 ENTSO-E Resolved Normal

IEC 61850-7-500

Single phase and multi phase trip indication for the autorecloser 05/09/2023 09:32 AM Actions
6697 Server Issues Resolved Normal sRpN9 does not specify the expected access error by negative response on SetURCBValues 04/02/2024 08:40 AM Actions
6710 Server Issues Resolved Normal sSrv13 does not specify that the lower hierarchy Mod.stVal shall not change 04/02/2024 02:42 PM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
5921 General Testing Issues Improvement Resolved Normal Start using Vendor and Lab Submission Information 09/06/2022 09:33 AM Actions
629 IEC 61850 User Feedback Task Force Improvement 35 RTE Resolved Normal

IEC TR 61850-90-29

TCTR and TVTR new DO to identify physical terminal allocation in the IED 01/16/2024 08:11 AM Actions
6465 GOOSE Performance Issues Resolved Normal The Ed2 GOOSE performance also apply for Ed2Amd1 08/08/2023 08:42 AM Actions
438 IEC 61850 User Feedback Task Force Feature 1 Vattenfall Resolved Normal

IEC 61850-4

The engineering-process is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment 12/05/2023 08:26 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
6248 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal

IEC 61850-6

There are controls between IEDs for automatic control functions, we need to be able to represent those controls in SCL (for configuration in SCT, data flow documentation...) 06/14/2023 08:33 AM Actions
6326 SCL Tooling Issues Resolved Normal tIie1 - remove step 10-14 to undo previous changes 05/16/2023 08:09 AM Actions