6226 IEC 61850 User Feedback Task Force Bug Resolved Normal In the downgrading rules from ed 2.1 to ed 2.0 in part 6, it is mentionned to exclude ORS CDC (I.4.2.4). Why CDCs: CST, VSD and TCS that were also added in ed2.1 are not mentionned to be excluded also ? 06/05/2023 01:58 AM Actions
5970 IEC 61850 User Feedback Task Force Improvement 2022 f2F IOP In Progress Normal

IEC 61850-6

SCT behavior needs to be specified regarding mismatch between substation section and IED section 11/08/2022 08:24 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/07/2023 08:21 AM Actions
5335 IEC 61850 User Feedback Task Force Improvement Dustin Tessier Resolved Normal

IEC 61850-90-4

Adding Normative Requirements & Conformance Testing Pertaining to Broadcast Storms 06/05/2023 01:58 AM Actions
6248 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal

IEC 61850-6

There are controls between IEDs for automatic control functions, we need to be able to represent those controls in SCL (for configuration in SCT, data flow documentation...) 06/14/2023 08:33 AM Actions
5955 IEC 61850 User Feedback Task Force Improvement EDF Resolved Normal Indicate typical SIUnit for every DO with CDC MV would help users + Add a dedicated attribute in NSD files instead of having it in the description ? 06/05/2023 01:58 AM Actions
6167 IEC 61850 User Feedback Task Force Support email Resolved Normal

IEC 61850-90-6

IEC 61850-90-6 Voltage presence CDC for SVPI.Prs 06/05/2023 01:58 AM Actions
647 IEC 61850 User Feedback Task Force Support 57 ENTSO-E Resolved Normal

IEC 61850-7-500

Single phase and multi phase trip indication for the autorecloser 05/09/2023 09:32 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
5876 IEC 61850 User Feedback Task Force Improvement FNN Germany Resolved Normal

IEC 61850-7-4 Ed.3

Proposal of a new LN class ASWI 06/05/2023 01:58 AM Actions
605 IEC 61850 User Feedback Task Force Improvement 4 H30 In Progress Normal

IEC 61850-10-3

Test and Simulation mode questions 06/21/2022 02:09 AM Actions
632 IEC 61850 User Feedback Task Force Support 8 H30 Resolved High

IEC 61850-9-2, IEC 61869-9

APPID 0x4000 - Sampled Values 12/05/2023 09:16 AM Actions
607 IEC 61850 User Feedback Task Force Support 6 H30 In Progress Normal

IEC 61850-80-6 (90-2)

LPHD.Sim management 06/21/2022 02:09 AM Actions
556 IEC 61850 User Feedback Task Force Support 3 H30 In Progress Normal

IEC 61850-90-20

Rendundant CT/TT measurements 06/21/2022 02:09 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
5091 IEC 61850 User Feedback Task Force Feature 10 H30 Resolved Normal

IEC 61850-2

Devices types/acronyms 06/05/2023 01:58 AM Actions
608 IEC 61850 User Feedback Task Force Feature 7 H30 In Progress Normal

IEC 61850-90-xx

Comprehensive set of requirements covering validation and supervision of all IEC 61850 communications 06/21/2022 02:09 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions