# Project Tracker ID Source Status Priority Standard(s) Subject Updated
6298 WG14 Part 9 Issues CIM Issues New Normal

61968-9

New Event codes needed in Part 9 for overvoltage and undervoltage 03/22/2023 08:48 AM Actions
6297 WG14 Part 9 Issues CIM Issues New Normal

61968-9

New Event code needed in Part 9 for DC Voltage 04/20/2023 09:54 AM Actions
6296 WG14 Part 9 Issues CIM Issues New Normal

61968-9

New "Transformer Compensated" Quality Code needed in Part 9 06/01/2023 08:10 AM Actions
6295 WG14 Issues CIM Issues New Normal

61968-9

Publication of meter firmware versions from Part 9 to Part 4. 03/21/2023 03:54 PM Actions
6294 WG14 Issues CIM Issues New Normal

61968-9

IRM 03/21/2023 03:46 PM Actions
6267 CIM Joint Issues CIM Issues New High

IEC61968-11

Person and Organization Relationships 02/15/2023 09:31 AM Actions
6266 CIM Issues CIM Issues New Normal

IEC61968-11

Person and Person Role Modeling 02/15/2023 09:21 AM Actions
6249 CIM Issues CIM Issues New Normal Update CIM namespace 02/06/2023 01:17 PM Actions
6245 WG14 Part 3 Issues CIM Issues New Normal It is not possible to convey that an UnplannedOutage is frozen (prediction is suspended). 02/01/2023 02:29 PM Actions
6244 WG14 Part 3 Issues CIM Issues New Normal Part 3 should specify that you can use 'updated' verb 01/31/2023 03:32 PM Actions
6243 WG14 Part 3 Issues CIM Issues New Normal UnplannedOutages is missing OutageArea and AreaKind 01/31/2023 03:29 PM Actions
6242 WG14 Part 3 Issues CIM Issues New Normal OutageArea has nowhere to put the name of the outage area 01/31/2023 03:26 PM Actions
6241 WG14 Part 3 Issues CIM Issues New Normal UnplannedOutages does not provide a way to capture affected kVA for IEEE load-based indices 01/31/2023 03:23 PM Actions
6240 WG14 Part 3 Issues CIM Issues New Normal UnplannedOutages has no way to indicate that the outage should be excluded from reliability reporting. 01/31/2023 02:59 PM Actions
6239 WG14 Part 3 Issues CIM Issues New Normal UnplannedOutages profile needs ability to capture de-energized and energized times per UsagePoint 01/31/2023 02:26 PM Actions
6231 Market Management CIM Issues New Normal Add the new datatype ESMPDataTypes / SettlementMethodType_String and enumeration 01/30/2023 10:21 AM Actions
6194 WG14 Part 3 Issues CIM Issues New Normal PlannedOutageNotifications needs to support energize/de-energize time/date per UsagePoint. 11/29/2022 12:50 PM Actions
5979 WG14 Part 9 Issues CIM Issues New Normal

IEC 61968-9 and others

Meter to UsagePoint relationship should be many-to-many 06/15/2023 09:32 AM Actions
5950 WG14 Part 9 Issues CIM Issues New Normal

61968-9, 61968-11

How is readCycle used, should the definition be updated? 05/31/2023 07:13 PM Actions
5885 CIM Issues CIM Issues New Normal

IEC 61970-301

Consider CIM measurement classes that can hold multiple measured values with the same timestamp and quality. 07/13/2022 10:50 AM Actions
5884 CIM Issues CIM Issues New Normal Modify control model - create DiscreteCommand for enumerations such as raise/lower 07/13/2022 10:45 AM Actions
5883 CIM Issues CIM Issues New Normal

IEC 61970-301

Define a standard way to define IEC 61850 data object names for MeasurementTypes and ControlTypes 07/13/2022 10:31 AM Actions
5882 CIM Issues CIM Issues New Normal

IEC 61970-301

Model fans, motors, battery systems and similar auxiliary equipment with terminals 07/13/2022 10:24 AM Actions
5380 WG14 Part 7 Issues CIM Issues New Normal Customer Installation Management 10/16/2023 01:17 PM Actions
5379 WG14 Part 1 Issues CIM Issues New Normal

61968-1

Construction Planning revision 11/04/2023 01:04 PM Actions