Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
6568 Server Issues Rejected Normal The definition of LTMS.TmSrc is different in the actual AMD1 and Consolidated Version - 1846 11/14/2023 08:37 AM Actions
6565 Server Issues Rejected Normal Added more precise qualifications to TmSrcTyp - 1883 11/14/2023 09:03 AM Actions
6520 SCL Tooling Issues Rejected Normal ICT Ed2.1 refers to TICS but there no part 6 tissues 10/31/2023 08:35 AM Actions
6472 Server Issues Rejected Normal Concept of smpRate for input analogue signal acquisition is misleading (Tissue 1857) 08/22/2023 08:22 AM Actions
6466 Server Issues Rejected Normal TP1.2 sSvs1 step 6 shall be removed 07/11/2023 08:33 AM Actions
6365 Server Issues Rejected Normal Considering PTP version 2.1 07/11/2023 08:12 AM Actions
6324 SCL Tooling Issues Rejected Normal sCnf6 - not all extRef require intAddr not referring to external device 05/16/2023 08:44 AM Actions
6208 Server Issues Rejected Normal sSvsN2 in TP1.2 does not check the situation where the DUT checks ConfRev 03/21/2023 08:20 AM Actions
6206 Server Issues Rejected Normal Type and size of Length field value (TLV) encoding in SV 01/11/2023 06:19 AM Actions
6174 Server Issues Rejected Normal Amend sCtl7 to test both interlocking check and check synchronizing ? 02/07/2023 08:24 AM Actions
5906 Server Issues Rejected Normal sCnf51 at least one LPHD 09/06/2022 08:20 AM Actions
5344 Server Issues Rejected Normal sBr29 power-up the IED is missing 06/02/2022 04:12 PM Actions
5138 Server Issues Rejected Normal sBr13 without pre-assignment 12/13/2021 04:43 AM Actions
654 Server Issues Rejected Low Publish/subscribe minimum length data GOOSE 01/24/2023 09:02 AM Actions
653 Server Issues Rejected Low Subscriber can use maximum number of dataset elements 01/24/2023 09:03 AM Actions
651 Server Issues Rejected Low Verify subscriber can accept maximum size GOOSE 01/24/2023 08:40 AM Actions
3027 IEC 61850 Certificate IEC 61850 Certificate Rejected Normal F650 Digital Bay Controller [GE Power Management, S.L.] 08/04/2021 09:37 AM Actions
6784 IEC 61850 Certificate IEC 61850 Certificate Approved Normal iRTU 05/03/2024 04:14 PM Actions
6783 IEC 61850 Certificate IEC 61850 Certificate Approved Normal CCI Power Plant Controller 05/03/2024 03:02 PM Actions
6782 IEC 61850 Certificate IEC 61850 Certificate Approved Normal iCE-CPU 05/03/2024 02:51 PM Actions
6781 IEC 61850 Certificate IEC 61850 Certificate Approved Normal EcoStruxure™ Power Automation System Engineering 05/03/2024 02:34 PM Actions
6772 IEC 61850 Certificate IEC 61850 Certificate Approved Normal EcoStruxure Foxboro SCADA SCD6000 CPU 04/28/2024 08:38 AM Actions
6771 IEC 61850 Certificate IEC 61850 Certificate Approved Normal EcoStruxure Foxboro SCADA SCD6000 CPU 04/30/2024 08:28 AM Actions
6770 IEC 61850 Certificate IEC 61850 Certificate Approved Normal EdgeHub DataWorX 04/24/2024 02:00 PM Actions
6763 IEC 61850 Certificate IEC 61850 Certificate Approved Normal ETOPD1000 04/15/2024 07:33 AM Actions
(76-100/2162) Per page: 25, 50, 100

Also available in: Atom CSV PDF