Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
519 IEC 61850 User Feedback Task Force Support 1 UFTF Resolved Normal

80-7

Optionality in DOI NamPlt, PhyNam resp. in ICD/IID file: IED.manufacturer, .IED.type, makes a device recognition in a machine to 06/05/2023 01:58 AM Actions
580 IEC 61850 User Feedback Task Force Support 52 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Undervoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
579 IEC 61850 User Feedback Task Force Support 51 ENTSO-E Resolved Normal

IEC 61850-7-500

Voltage protection: Overvoltage protection - 3ph operate 05/09/2023 09:32 AM Actions
572 IEC 61850 User Feedback Task Force Support 44 ENTSO-E Resolved Normal

IEC 61850-7-500

S/S related applications: Auxiliary circuit supervision 05/09/2023 09:32 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
553 IEC 61850 User Feedback Task Force Support 34 IOP_2017/55 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 should clarify the meaning and use of TimeTraceable and FrequencyTraceable 05/09/2023 09:32 AM Actions
552 IEC 61850 User Feedback Task Force Support 33 IOP_2017/54 Resolved Normal

IEC 61850-9-3

Disruption of network when TC are not set to the correct domain 05/09/2023 09:32 AM Actions
551 IEC 61850 User Feedback Task Force Support 32 IOP_2017/53 Resolved Normal

IEC 61850-9-3

IEC/IEEE 61850-9-3 - Sync messages have to be padded to the same length as the Pdelay_Req/Pdelay_Resp messages 05/09/2023 09:32 AM Actions
550 IEC 61850 User Feedback Task Force Support 31 IOP_2017/52 Resolved Normal

IEC 61850-9-3

Incorrect variance adjustment for Time Masters with degradation (loss of GPS) 05/09/2023 09:32 AM Actions
549 IEC 61850 User Feedback Task Force Support 30 IOP_2017/51 Resolved Normal

IEC 61850-9-3

Standard should clarify the relation between the PTP clock clockQuality signals and the timeQuality in TimeStamp 05/09/2023 09:32 AM Actions
548 IEC 61850 User Feedback Task Force Support 29 IOP_2017/50 Resolved Normal

IEC 61850-9-3

The start-up behaviour of Boundary Clocks 05/09/2023 09:32 AM Actions
547 IEC 61850 User Feedback Task Force Support 28 IOP_2017/49 Resolved Normal

IEC 61850-9-3

Requirement for Boundary Clocks to adjust the clock accuracy to reflect their actual accuracy, not that of their grandmaster 05/09/2023 09:32 AM Actions
525 IEC 61850 User Feedback Task Force Support 6 IOP_2017/8 Resolved Normal

IEC 61850-6

IEC 61850-6 does not allow the authentication configuration (none, password, weak, strong or certificate) to be used for Client 05/09/2023 09:32 AM Actions
583 IEC 61850 User Feedback Task Force Support 55 ENTSO-E Closed Normal

IEC 61850-7-4

Autoreclosure: Autoreclosure - 3ph closing command missing 12/06/2022 09:38 AM Actions
582 IEC 61850 User Feedback Task Force Support 54 ENTSO-E Closed Normal

IEC 61850-7-4, 7-5

Synchrocheck: Synchrocheck - missing signals 12/06/2022 09:37 AM Actions
581 IEC 61850 User Feedback Task Force Support 53 ENTSO-E Closed Normal

IEC 61850-7-4, 7-5

S/S related applications: Disturbance recorder - communication session active 12/06/2022 09:37 AM Actions
569 IEC 61850 User Feedback Task Force Support 41 ENTSO-E Closed Normal

IEC 61850-7-4

S/S related applications: Access security system 12/06/2022 09:36 AM Actions
566 IEC 61850 User Feedback Task Force Support 38 ENTSO-E Closed Normal

IEC 61850-7-420

S/S related applications: Diesel aggregat alarm 12/06/2022 09:35 AM Actions
559 IEC 61850 User Feedback Task Force Support 31 ENTSO-E Closed Normal

IEC 61850-7-4

Busbar protection: ARC detection protection 12/06/2022 09:02 AM Actions
558 IEC 61850 User Feedback Task Force Support 30 ENTSO-E Closed Normal

IEC 61850-7-4

Busbar protection (BBP): Diff/Kirchoff BBP 12/06/2022 09:02 AM Actions
434 IEC 61850 User Feedback Task Force Support 25 ENTSO-E Closed Normal Freedom of choice what IEC 61850 services are to be tested seem too open. The vendor can select exactly what UCA accredited test 12/06/2022 09:01 AM Actions
424 IEC 61850 User Feedback Task Force Support 15 ENTSO-E Closed Normal

6

Vendor Tools shall allow (vendor independant) Integration tools doing engineering based on ICD Files, thus allowing them to in 12/06/2022 09:01 AM Actions
419 IEC 61850 User Feedback Task Force Support 10.2 ENTSO-E Closed Normal

IEC 61850-7-2

Also many other features of GOOSE messaging are left to the manufacturer to choose. 12/06/2022 09:01 AM Actions
417 IEC 61850 User Feedback Task Force Support 9 ENTSO-E Closed Normal

6-100

There is no mechanism proposed by the Standard to positively identify data points in the data model. For instance PTOC can refer 12/06/2022 09:01 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
(76-100/3042) Per page: 25, 50, 100

Also available in: Atom CSV PDF