Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
509 IEC 61850 User Feedback Task Force Support 24 IOP_2015 Closed Normal

IEC 61850-7-2

1. Report Control Block is disabled and four events (four reports) are generated2. Client sends MMS Write RptEna=true to the BR 06/21/2022 09:12 AM Actions
508 IEC 61850 User Feedback Task Force Support 23 IOP_2015 Closed Normal

IEC 61850-7-2

RptID attribute of a ReportControl section in SCL is optional, as stated in IEC 61850-6. IEC 61850-8-1 states to send RCB objec 06/21/2022 09:12 AM Actions
415 IEC 61850 User Feedback Task Force Support 7.1 ENTSO-E Closed Normal

IEC 61850-7-2

Standard is written in general opinion that Ethernet is fully capable to carry all its tasks 02/11/2021 08:01 AM Actions
600 IEC 61850 User Feedback Task Force Feature 1947 IOP_2019 Closed Normal

IEC 61850-7-1

Connect the ExtRef - different supported mechanisms by ICT 06/21/2022 09:29 AM Actions
595 IEC 61850 User Feedback Task Force Feature 1642_04 IOP_2019 Closed Normal

IEC 61850-7-1

How does the SCT know whether to configure the LSVS.SvCBRef (if it is not configured)? 06/21/2022 09:29 AM Actions
443 IEC 61850 User Feedback Task Force Feature 6 Vattenfall Closed Normal

IEC 61850-7-1

Requirement for guideline - generic interfacing logical nodes are used for outputs and inputs ( destroys the semantic meaning of signals) 02/11/2021 07:58 AM Actions
429 IEC 61850 User Feedback Task Force Support 20 ENTSO-E Closed Normal

IEC 61850-6/7-1

Input configuration: IEDs shall support ExtRef entries pointing to Data Objects as well as to DataAttribute with all possible le 02/11/2021 07:37 AM Actions
545 IEC 61850 User Feedback Task Force Feature 26 IOP_2017/46 Closed Normal

IEC 61850-6-2

SLD visualization issues in SCL 06/21/2022 09:24 AM Actions
534 IEC 61850 User Feedback Task Force Feature 15 IOP_2017/24 Closed Normal

IEC 61850-6, IEC 61850-7-2

A GCB or MSVCB can only have one single control block address entry in the whole communication section 06/21/2022 09:24 AM Actions
546 IEC 61850 User Feedback Task Force Feature 27 IOP_2017/47 Closed Normal

IEC 61850-6 §10 annex G

Different level of expectations between the ICT and SCT 02/11/2021 07:16 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
450 IEC 61850 User Feedback Task Force Bug 7 IOP_2013 Closed High

IEC 61850-6

SCL namespace "2007A" not accepting LDNs as "2007" 06/05/2023 01:59 AM Actions
459 IEC 61850 User Feedback Task Force Bug 16 IOP_2013 Closed High

IEC 61850-6

No mechanism in SCL to indicate if the SCT can define/delete/edit RCBs/ExtRefs 06/21/2022 09:00 AM Actions
451 IEC 61850 User Feedback Task Force Bug 8 IOP_2013 Closed High

IEC 61850-6

ICD file of a client only IED 03/15/2022 09:43 AM Actions
449 IEC 61850 User Feedback Task Force Bug 6 IOP_2013 Closed High

IEC 61850-6

GSE MaxTime and MinTime parameters are optional with no default value 03/15/2022 09:40 AM Actions
445 IEC 61850 User Feedback Task Force Bug 2 IOP_2013 Closed High

IEC 61850-6

ExtRef use for GOOSE and SV subscription 02/11/2021 06:32 AM Actions
446 IEC 61850 User Feedback Task Force Bug 3 IOP_2013 Closed High

IEC 61850-6

The actual format required for an ClientLN (used for ReportControl Block reservation) is not specified fully or in an understand 02/11/2021 06:30 AM Actions
453 IEC 61850 User Feedback Task Force Bug 10 IOP_2013 Closed High

IEC 61850-6

ExtRef definition and the expected semantic of intAddr 02/11/2021 06:17 AM Actions
458 IEC 61850 User Feedback Task Force Bug 15 IOP_2013 Closed High

IEC 61850-6

ICD issue when cBName="fix" but not all the RCBs has been declared 02/11/2021 06:15 AM Actions
461 IEC 61850 User Feedback Task Force Improvement 18 IOP_2013 Closed High

IEC 61850-6

GOOSE Suscription definition in SCL 02/11/2021 06:03 AM Actions
463 IEC 61850 User Feedback Task Force Feature 20 IOP_2013 Closed High

IEC 61850-6

GOOSE suscription: managing data types in datasets 02/11/2021 05:56 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
6175 IEC 61850 User Feedback Task Force Bug 2022 IOP In Progress Normal

IEC 61850-6

SCL SICS requires SNTP even with 2.1 where PTP is the preferred method. 11/07/2023 08:21 AM Actions
6144 IEC TC57 WG10 Future Work WG10 Future Work IOP 2022 New Normal

IEC 61850-6

Need to add SCL mechanism to define a minimum MinTime 10/26/2023 05:21 AM Actions
6185 IEC TC57 WG10 Future Work WG10 Future Work 2022 IOP New Normal

IEC 61850-6

SCL Need to differentiate the difference in the number of GOOSE vs R-GOOSE 10/26/2023 05:01 AM Actions
(51-75/3044) Per page: 25, 50, 100

Also available in: Atom CSV PDF