423 IEC 61850 User Feedback Task Force Support 14 ENTSO-E Closed Normal Conformance test for SICS. 02/11/2021 07:47 AM Actions
476 IEC 61850 User Feedback Task Force Support 32 IOP_2013 Closed Normal Currently, in SCL, the size of an array is numeric. This could lead to issues of consistency (e.g. one having 32 array elements 06/21/2022 09:00 AM Actions
518 IEC 61850 User Feedback Task Force Support 34 IOP_2015 Closed Normal Does the SVID character have to be specifically mentioned to be within 10-34 characters? Some of the vendors have implemented th 06/21/2022 09:12 AM Actions
434 IEC 61850 User Feedback Task Force Support 25 ENTSO-E Closed Normal Freedom of choice what IEC 61850 services are to be tested seem too open. The vendor can select exactly what UCA accredited test 12/06/2022 09:01 AM Actions
427 IEC 61850 User Feedback Task Force Support 18 ENTSO-E Closed Normal Functional constrained data shall include all levels of a hierarchy 02/11/2021 07:41 AM Actions
471 IEC 61850 User Feedback Task Force Support 27 IOP_2013 Closed Normal How should an SCL file express the initial value of GOCB.Ena and SVCB.Ena. It would appear that the Control Block schema definit 06/21/2022 09:00 AM Actions
520 IEC 61850 User Feedback Task Force Support 1 IOP_2017/1 Closed Normal IEC 61850-6 leaves the definition of the meaning of the authentication options to the SCSM. However, neither 8-1 nor IEC 62351-6 06/21/2022 09:13 AM Actions
517 IEC 61850 User Feedback Task Force Support 33 IOP_2015 Closed Normal IEC 61850-9-3 slaves can by design lock themselves to IEEE C37.238 (Power Profile) masters. This is intended behavior, since IEC 06/21/2022 09:12 AM Actions
430 IEC 61850 User Feedback Task Force Support 21 ENTSO-E Closed Normal IED certification needs to include tool interoprability validation 02/11/2021 07:36 AM Actions
507 IEC 61850 User Feedback Task Force Support 22 IOP_2015 Closed Normal If the client reads a SCD file and loads then the data model (or vice versa ???) what data shall a client compare? confRef’s, da 06/21/2022 09:10 AM Actions
465 IEC 61850 User Feedback Task Force Support 22 (1) IOP_2013 Closed Normal In a SCD there were LNodes in the substation section that were not associated to a specific IED/LN instance. In particular, an S 06/21/2022 09:00 AM Actions
466 IEC 61850 User Feedback Task Force Support 22 (2) IOP_2013 Closed Normal In a SCD there were LNodes in the substation section that were not associated to a specific IED/LN instance. The question was if 06/21/2022 09:00 AM Actions
435 IEC 61850 User Feedback Task Force Support 26 ENTSO-E Closed Normal Interoperability between vendor products is not verified/certified by UCA 02/11/2021 07:06 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
422 IEC 61850 User Feedback Task Force Support 13 ENTSO-E Closed Normal Mapping utility signals to IEC 61850 objectcs from specification perspective 06/05/2023 01:59 AM Actions
533 IEC 61850 User Feedback Task Force Support 14 IOP_2017/23 Closed Normal MSVID shall be unique. The integrated application SCD file allowed duplicate SVID’s for two merging units. 06/21/2022 09:13 AM Actions
554 IEC 61850 User Feedback Task Force Support 1 H30 Resolved Normal Performance requirement for SV and implications to Protection applications 05/09/2023 09:32 AM Actions
514 IEC 61850 User Feedback Task Force Support 29 IOP_2015 Closed Normal Priority of error checking in controls – i.e. position-reached instead of Blocked-by-switching-hierarchy. The order of checks i 06/21/2022 09:12 AM Actions
420 IEC 61850 User Feedback Task Force Support 11 ENTSO-E Closed Normal Procedures to establish client / server communications should be defined 06/05/2023 01:59 AM Actions
527 IEC 61850 User Feedback Task Force Support 8 IOP_2017/10 Closed Normal Regarding the Network infrastructure: Some MU/SAMU cannot configure their SV stream to different VLAN ID , fixed to 0 (but can c 06/21/2022 09:13 AM Actions
414 IEC 61850 User Feedback Task Force Support 6.2 ENTSO-E Closed Normal SCD from system integrator not containing comprehensive substation section 02/03/2021 02:42 PM Actions
536 IEC 61850 User Feedback Task Force Support 17 IOP_2017/26 Closed Normal SCT did not import GOOSE and 3 of the sampled value control blocks that existed in PMU ICD file. This caused validation failures 06/21/2022 09:13 AM Actions
474 IEC 61850 User Feedback Task Force Support 30 IOP_2013 Closed Normal Should all SCTs support a substation section and the ability to associate LNodes into that section. 06/21/2022 09:00 AM Actions
485 IEC 61850 User Feedback Task Force Support 41 IOP_2013 Closed Normal Some switches discard the IEEE 802.1Q tag known as VLAN 0 on packets sent/received on the trunk ports. Others discard the packet 06/21/2022 09:00 AM Actions
413 IEC 61850 User Feedback Task Force Support 6 ENTSO-E Closed Normal Substation part in SCL is mostly non existing in manufacturers scd export files and in form that is defined as in Standard. Subs 02/03/2021 02:42 PM Actions