Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker ID Source Status Priority Standard(s) Subject Updated
602 IEC 61850 User Feedback Task Force Feature 1742 IOP_2019 Resolved Normal

IEC 61850-9-3

Merging Unit standard requires MU clock to jump on PTP time jumps, which is not true for Boundary Clocks. 05/09/2023 09:32 AM Actions
537 IEC 61850 User Feedback Task Force Support 18 IOP_2017/27 Closed Normal

IEC 61850-7-2, 8-1, 8-2

Server is not responding to some of the MMS requests. (see below) What should the client do this case? 06/21/2022 09:24 AM Actions
503 IEC 61850 User Feedback Task Force Support 18 IOP_2015 Closed Normal

6

Issue 1: History section is present in ICD but during import SCT is discarding this history section. Also, maintenance of histor 06/21/2022 09:12 AM Actions
427 IEC 61850 User Feedback Task Force Support 18 ENTSO-E Closed Normal Functional constrained data shall include all levels of a hierarchy 02/11/2021 07:41 AM Actions
461 IEC 61850 User Feedback Task Force Improvement 18 IOP_2013 Closed High

IEC 61850-6

GOOSE Suscription definition in SCL 02/11/2021 06:03 AM Actions
590 IEC 61850 User Feedback Task Force Feature 1800 IOP_2019 Resolved Normal

IEC 61850-6

ICT fails to check validity of the SCD file regarding the IED constraints 11/07/2023 08:22 AM Actions
591 IEC 61850 User Feedback Task Force Feature 1857 IOP_2019 Closed Normal

IEC 61850-6

A reservation could not be made via SCL for an IED’s report due to the lack of a ConnectedAP associated with the client’s AP 07/05/2022 08:34 AM Actions
538 IEC 61850 User Feedback Task Force Support 19 IOP_2017/29 Closed Normal

IEC 61850-6

SCT engineering problems 06/21/2022 09:24 AM Actions
504 IEC 61850 User Feedback Task Force Support 19 IOP_2015 Closed Normal

6

When IID file from ICT includes “mustUnderstand” attribute in <GSEcontrol> such as <GSEControl desc="System Logical Device GOOS 06/21/2022 09:12 AM Actions
462 IEC 61850 User Feedback Task Force Support 19 IOP_2013 Closed Normal The use of ExtRef to subscribe to a SV was questioned. There are several different mechanisms that could be used in 61850-6 to s 06/21/2022 09:00 AM Actions
428 IEC 61850 User Feedback Task Force Support 19 ENTSO-E Closed Normal

IEC 61850-6

If 11 # ENTSO-E is not supported, vendors shall describe in the PIXIT document what they support 02/11/2021 07:40 AM Actions
600 IEC 61850 User Feedback Task Force Feature 1947 IOP_2019 Closed Normal

IEC 61850-7-1

Connect the ExtRef - different supported mechanisms by ICT 06/21/2022 09:29 AM Actions
555 IEC 61850 User Feedback Task Force Support 2 H30 Rejected Normal Link Failover reliability problem - implication to protection application 10/25/2022 09:01 AM Actions
521 IEC 61850 User Feedback Task Force Feature 2 IOP_2017/3 Closed Normal

IEC 61850-8-1

The GSEControl has a datSet element indicating that the gocb is configured (but with no communication entry) 06/21/2022 09:24 AM Actions
487 IEC 61850 User Feedback Task Force Support 2 IOP_2015 Closed Normal

6

In the service section, there is the new element “client services”. That element includes GOOSE (default FALSE). Is it required 06/21/2022 09:11 AM Actions
439 IEC 61850 User Feedback Task Force Bug 2 Vattenfall Resolved High

IEC 61850-6

How to add utility process name to DOs 11/07/2023 09:04 AM Actions
445 IEC 61850 User Feedback Task Force Bug 2 IOP_2013 Closed High

IEC 61850-6

ExtRef use for GOOSE and SV subscription 02/11/2021 06:32 AM Actions
404 IEC 61850 User Feedback Task Force Feature 2.1 ENTSO-E Closed Normal Meaning of "optional" regarding data model 02/11/2021 06:21 AM Actions
405 IEC 61850 User Feedback Task Force Feature 2.2 ENTSO-E Closed Normal Optionality of DO/DA from the point of view of users 02/11/2021 06:20 AM Actions
406 IEC 61850 User Feedback Task Force Bug 2.3 ENTSO-E Closed High Configuration of datasets by users 02/03/2021 03:55 PM Actions
539 IEC 61850 User Feedback Task Force Support 20 IOP_2017/34 Closed Normal

IEC 61850-6

Relation between GCB instances in scd to the related LGOS 06/21/2022 09:24 AM Actions
505 IEC 61850 User Feedback Task Force Support 20 IOP_2015 Closed Normal

6

Statement: an SCT A export an SED file with engineering rights “fix” and expectation was SCT B could add Goose clients after imp 06/21/2022 09:12 AM Actions
429 IEC 61850 User Feedback Task Force Support 20 ENTSO-E Closed Normal

IEC 61850-6/7-1

Input configuration: IEDs shall support ExtRef entries pointing to Data Objects as well as to DataAttribute with all possible le 02/11/2021 07:37 AM Actions
463 IEC 61850 User Feedback Task Force Feature 20 IOP_2013 Closed High

IEC 61850-6

GOOSE suscription: managing data types in datasets 02/11/2021 05:56 AM Actions
540 IEC 61850 User Feedback Task Force Feature 21 IOP_2017/35 Closed Normal

IEC 61850-6

Some SCT tools are removing incomplete Inputs with ExtRef’s of serviceType=”SMV” that are used for late binding of sample values 06/21/2022 09:24 AM Actions
(2901-2925/3048) Per page: 25, 50, 100

Also available in: Atom CSV PDF