General

Profile

Martin Bass

  • Login: martin.bass
  • Registered on: 02/07/2022
  • Last connection: 01/16/2024

Issues

open closed Total
Assigned issues 0 0 0
Reported issues 9 0 9

Activity

02/02/2023

01:07 PM WG13 Issues CIM Issues #6247 (Open): Missing support for fault indicators
In distribution it is necessary to model fault indicator devices. These are used by applications to determine the po... Martin Bass

02/01/2023

02:29 PM WG14 Part 3 Issues CIM Issues #6245 (New): It is not possible to convey that an UnplannedOutage is frozen (prediction is suspended).
Most commercial outage management systems support this concept (at least three that we are aware of). It is used to ... Martin Bass

01/31/2023

03:32 PM WG14 Part 3 Issues CIM Issues #6244: Part 3 should specify that you can use 'updated' verb
Provide examples of using the 'updated' verb and updated sequence diagrams. Martin Bass
03:31 PM WG14 Part 3 Issues CIM Issues #6244 (New): Part 3 should specify that you can use 'updated' verb
Edition 3 does not specify that you can use the 'updated' verb that is defined in Part 100 edition 2. This makes it ... Martin Bass
03:29 PM WG14 Part 3 Issues CIM Issues #6243 (New): UnplannedOutages is missing OutageArea and AreaKind
Due to problems with the OutageArea, it is not included in the current payload. See issue #6242. Both should be inc... Martin Bass
03:26 PM WG14 Part 3 Issues CIM Issues #6242 (New): OutageArea has nowhere to put the name of the outage area
OutageArea needs reworking – there is nowhere to put the name of the outage area so it is not useful if we don't know... Martin Bass
03:23 PM WG14 Part 3 Issues CIM Issues #6241 (New): UnplannedOutages does not provide a way to capture affected kVA for IEEE load-based indices
Need to capture affected kVA for IEEE load-based indices. This means that the kVA for loads and transformers that ar... Martin Bass
02:59 PM WG14 Part 3 Issues CIM Issues #6240 (New): UnplannedOutages has no way to indicate that the outage should be excluded from reliability reporting.
During the lifecycle of an UnplannedOutage, it is possible that the outage should be excluded from reliability indice... Martin Bass
02:26 PM WG14 Part 3 Issues CIM Issues #6239 (New): UnplannedOutages profile needs ability to capture de-energized and energized times per UsagePoint
The UnplannedOutages profile needs a way to capture the time and date that each UsagePoint was energized and to be ab... Martin Bass

11/29/2022

12:50 PM WG14 Part 3 Issues CIM Issues #6194 (New): PlannedOutageNotifications needs to support energize/de-energize time/date per UsagePoint.
PlannedOutageNotifications currently does not allow you to define when an individual UsagePoint will be out. It also... Martin Bass

Also available in: Atom